R/2021/0057/VC

Planning Application Details - Official Consultation has expired.

Location
LAND AT FORMER SOUTH BANK WORKS; GRANGETOWN PRAIRIE; BRITISH STEEL AND WARRENBY AREA
Proposal
VARIATION OF CONDITION 2 OF PLANNING PERMISSION R/2019/0427/FFM (DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED WITH GROUND PREPARATION AND TEMPORARY STORAGE OF SOILS AND ITS FINAL USE IN THE REMEDIATION AND PREPARATION OF LAND FOR REGENERATION AND DEVELOPMENT) TO ALLOW FOR ADDITIONA...
Application Type
Variation Condition
Status
Approved
Parish(es)
Applicant
TEESWORKS
Applicant's Address
. . . C/O AGENT . . . .
Agent
LICHFIELDS
Agent's Address
MISS KATHERINE SIMPSON ST NICHOLAS BUILDING ST NICHOLAS STREET NEWCASTLE UPON TYNE NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
26/01/2021
Weekly List Expiry Date
-
Date Received
21/01/2021
Date Valid
21/01/2021
Expiry
18/03/2021
Consultation Expiry
12/03/2021
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
29/03/2021
Decision Level
-

Conditions table
# Condition Details
1 The development hereby approved shall be begun not later than 27/09/2022. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Approved plans for application R/2019/0427/FFM Drawing No. STDC-SCW-XX-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-NEZ-WA-PLA-0006 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-MR-PLA-0004 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0007 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-NEZ-WA-PLA-0005 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-LA-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-SB-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0006 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-NEZ-WA-PLA-0004 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-NEZ-WA-PLA-0003 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0005 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0004 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0003 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-MR-PLA-0003 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-WA-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-MR-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-WA-PLA-0002 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-MR-PLA-0002 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0002 received by the Local Planning Authority on 01/07/19 Approved Plans for application R/2021/0057/VC Drawing No. STDC-SCW-XX-PLA-0002 Rev A received by the Local Planning Authority on 21/01/21 Drawing No. STDC-SIZ-SB-PLA-0002 received by the Local Planning Authority on 21/01/21 Drawing No. STDC-SIZ-SB-PLA-0005 received by the Local Planning Authority on 21/01/21 Drawing No. STDC-SIZ-SB-PLA-0006 received by the Local Planning Authority on 21/01/21 REASON: To accord with the terms of the planning application.
3 With the exception of soils used to level ground required to host the temporary storage mounds hereby approved, all soils placed into the temporary storage mounds shall be used in operations associated with ground preparation and remediation works within 10 years of the date of planning permission. REASON: In the interests of amenity
4 The work will be carried out in accordance with the submitted flood risk assessment and drainage strategies (June 2019, Wood and January 2021, JBA) and consistent with the layout identified in STDC-SCW-XX-PLA-0002 Rev A Materials Storage Site Location Plan with mounds received by the Local Planning Authority on 21/01/21. The storage mounds must be sited exclusively in Flood Zone 1 REASON: To prevent flood flows from being displaced and prevent increased risk of flooding elsewhere.
5 The works carried out will be in accordance with the Flood Risk Assessment and Drainage Strategy Docs ref. 41825-WOOD-XX-XX-RP-OW-0001_A_P01 including all appendices dated 01/07/2019 and South Tees Site Company Stockpile 5, FRA and Drainage Strategy Addendum, First Issue, January 2021. (FAO-JABU-XX-TN-Z-0001-S30-P01-South_Tees_Stockpile_5_FRA.docx) received by the Local Planning Authority on 21/01/21. REASON: To prevent increased risk of flooding
6 The approved remediation scheme must be carried out in accordance with its terms unless otherwise agreed in writing by the Local Planning Authority. Following completion of measures identified in the approved remediation scheme, a validation report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
7 In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where remediation is necessary a remediation scheme must be prepared and submitted to and approved in writing to the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority. REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. and part d conditions onto any planning permission which may be granted:
8 None of the soils placed into the temporary storage mounds hereby approved shall be transported upon the public highway network unless an assessment of the impacts of transporting soils upon the public highway network is prepared, submitted to and approved by the Local Planning Authority. Any such assessment shall include a transportation management scheme that identifies mitigation measures required to manage the movement of soils on the public highway network. Thereafter, any such transportation on the public highway shall be carried out in accordance with the approved transport management scheme. REASON: In order to ensure no adverse impacts arise on local amenity or the safe and effective operation of the public highway.
9 Prior to the final use of the soils in the implementation of this planning permission, further Ecological Assessment(s) shall be carried out and submitted to the Local Planning Authority in respect of those areas where the soils are to be used for ground preparation and remediation works. The Assessment (s) shall include up-to-date surveys that identify any priority habitats, ecological networks or protected and priority species. If significant harm to biodiversity cannot be avoided as a result of the final use of the soils, appropriate mitigation including by way of on or off-site compensatory provision, shall be identified in the Ecological Assessment and carried out within the timescales set out in the approved Assessment. REASON: In the interests of conserving biodiversity.
10 The development hereby approved shall be carried out in accordance with the Reptile Mitigation Strategy (October 2019, INCA) received by the Local Planning Authority on 10/10/19 to discharge conation 10 of application R/2019/0427/FFM. REASON: In the interests of preventing harm to protected species
11 Prior to commencement of any phase of the movement of earth associated with the formation of the approved temporary storage mounds or its final use, a Construction and Environmental Management Plan (CEMP) for that phase shall be submitted to and approved in writing by the Local Planning Authority. The approved Plan shall be adhered to throughout the implementation of the permission. . The Plan shall provide details of the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the temporary storage mounds; iv)Measures to control the spread of dirt and debris on the private road network; v) Methods of demolition of any structures to be demolished in order to form the approved temporary storage mounds; vi) Measures to control the emission of noise, dust and vibration during the formation of the temporary storage mounds. . vii) A scheme for recycling/disposing of waste resulting from demolition works that are required to form the approved temporary storage mounds. REASON: In the interests of neighbour amenity and maintaining good Air Quality
12 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.
13 Informative Note: The Local Planning Authority acknowledge that Condition 11 (CEMP) of application R/2019/0427/FFM has been partially discharged in so far as it relates to Warrenby Site (3B). A CEMP will need to be submitted for the remaining storage areas to fully discharge the condition.
14 Informative Note: The Local Planning Authority acknowledge that the required two weeks notice has been given in relation to Condition 6 of application R/2019/0247/FFM. Condition 6 can however not fully be discharged until a validation/verification report is submitted to the Local Planning Authority following the completion of the works.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Covering Letter 720 kb 21/01/2021
Application Form 172 kb 21/01/2021
Consultee Responses
Consultee response - Northern Gas Networks 5972 kb 02/02/2021
Consultee response - Natural England 86 kb 03/02/2021
Consultee response - CATS pipeline 2448 kb 03/02/2021
Consultee response - Network Rail 674 kb 11/02/2021
Consultee response - Environmental Protection (Contaminated Land) 239 kb 15/02/2021
Consultee response - Environmental Protection (Nuisance) 239 kb 15/02/2021
Consultee response - Environment Agency 251 kb 15/02/2021
Consultee response - Engineers (Local Lead Flood Authority) 455 kb 17/02/2021
Consultee response - Engineering Team (Highways) 46 kb 09/03/2021
Decision
Decision Notice 130 kb 29/03/2021
Location Plan
Location Plan 6383 kb 21/01/2021
Officer Report
Officer Report 105 kb 29/03/2021
Plans
Site Plan 709 kb 21/01/2021
Stockpile 5 Details and Sections 691 kb 21/01/2021
Existing Ground Level Contours and Sections 959 kb 21/01/2021
Existing Ground Cross Sections 893 kb 21/01/2021
Stockpiles 4A 4B 4C Details and Sections 692 kb 21/01/2021
Supporting Documentation
Flood Risk Assessment and Drainage Strategy 818 kb 21/01/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 26/01/2021 -
Engineers (Local Lead Flood Authority) 26/01/2021 -
Environment Agency 29/01/2021 -
Environmental Protection Team 26/01/2021 -
Health & Safety-Food (Food Team) 26/01/2021 -
Natural England 26/01/2021 -
Network Rail 26/01/2021 -
Northern Gas Network 26/01/2021 -
Pipeline CATS 26/01/2021 -
Pipeline CATS 26/01/2021 -
Address Date Sent Date Reconsulted Expiry Date
c/o ERNST & YOUNG LLP 1 MORE LONDON PLACE LONDON SE1 2AF 26/01/2021 - 26/01/2021
HANSON CEMENT TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6UF 26/01/2021 - 16/02/2021
Site or Press Description Display Date Expiry Date
S SITE NOTICE ONLY 19/02/2021 12/03/2021