R/2020/0797/CD

Planning Application Details - Official Consultation has expired.

Location
LAND AT WESTFIELD WAY HUMMERSEA HILLS LOFTUS
Proposal
DISCHARGE OF CONDITIONS 5; 8; 9; 14; 15; 18; 19; 20 & 22 ON PLANNING PERMISSION R/2011/0375/FFM AND VARIED BY R/2019/0738/VC
Application Type
Condition Discharge
Status
Approved
Parish(es)
Loftus CP
Applicant
ESH CONSTRUCTION LTD
Applicant's Address
MR R WILKINSON UNIT 17B ASTLEY WAY INDUSTRIAL ESTATE SWILLINGTON LEEDS LS26 8XT
Agent
Nicol Thomas
Agent's Address
RUTH WALKER HEYSIDE HOUSE BLACKSHAW LANE ROYTON OLDHAM OL2 6NS
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
21/12/2020
Date Valid
21/12/2020
Expiry
15/02/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
07/05/2021
Decision Level
-

Conditions table
# Condition Details
1 (5) Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
2 (8) Details of materials to be used for all hard surfaces (the use of porous/SUDs type drainage systems is recommended)shall be submitted to and approved in writing by the Local Planning Authority, prior to the commencement of the development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
3 (9) Notwithstanding the submitted landscaping scheme a revised landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority prior to the occupation of any of the dwellings hereby approved. The details shall include size, type and species of plant and indicate the proposed layout and surfacing of all open areas together with the final treatments to the retaining walls. The use of Prunus species should be avoided. Reference should be made to BS 5837 and the extent of the planting beds and species mix reviewed. A programme of work should also be submitted and implemented in accordance with the approved details. REASON: To reserve the rights of the Local Planning Authority with regard to these matters.
4 (14) No construction works approved by this permission shall be commenced until a scheme for the provision and implementation of a surface water drainage and regulation system (including a Surface Water Management Plan) based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented prior to the construction of any impermeable surfaces draining to the system. REASON: To ensure satisfactory drainage at this site.
5 (15) Notwithstanding the boundary treatment details submitted prior to the commencement of any development relating to boundary walls/fences and retaining walls details of those new boundary walls/fences and retaining walls shall have been submitted to the Local Planning Authority for approval. The approved details shall include type of materials and be implemented prior to the occupation of any of the dwellings at this site. REASON: In the interests of visual and residential amenity.
6 (18) Prior to the commencement of development details of a contractor’s compound shall be submitted for approval in writing by the Local Planning Authority. The approved details shall be fully implemented prior to commencement of works and remain until completion of construction/building works at this site. REASON: In the interests of highway safety.
7 (19) Prior to the commencement of development details of a scheme to prevent the deposit of mud/debris onto the highway shall have been submitted to the Local Planning Authority for approval in writing. The approved details shall be fully implemented prior to the commencement of works and be retained for the period of construction/building works. REASON: In the interests of highway safety.
8 (20) Prior to the commencement of works details of a traffic management plan shall be submitted to the Local Planning Authority for approval in writing. The approved scheme shall be implemented fully prior to the commencement of the works and shall be retained for the duration of construction/building works. REASON: In the interests of highway safety.
9 (22) Prior to the commencement of construction of any of the dwellings hereby approved full details of existing and proposed ground levels together with finished floor levels for each of the buildings shall have first been submitted to the Local Planning Authority for approval in writing. The approved details shall be implemented in their entirety. REASON: To ensure a satisfactory form of development.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 167 kb 21/12/2020
Consultee Responses
Consultee response - Northumbrian Water 373 kb 25/01/2021
Consultee response - Engineering Team (Highways) 46 kb 05/02/2021
Consultee response - Engineers (Local Lead Flood Authority) 456 kb 11/02/2021
Consultee response - Engineering Team (Highways) 50 kb 09/03/2021
Decision
Decision Notice R/2011/0375 41 kb 21/12/2020
Compliance Decision Notice 279 kb 07/05/2021
Officer Report
Officer Report 287 kb 07/05/2021
Superseded
Condition No. 15; 22 - External Works Plan 1 of 4 971 kb 21/12/2020
Condition No. 15; 22 - External Works Plan 3 of 4 1016 kb 21/12/2020
Condition No. 15; 22 - External Works Plan 2 of 4 2042 kb 21/12/2020
Condition No. 5; 8; 15 - External Works Sheet 4 3576 kb 21/12/2020
Condition No. 5; 8; 15 - External Works Sheet 1 3862 kb 21/12/2020
Condition No. 5; 8; 15 - External Works Sheet 2 4943 kb 21/12/2020
Condition No. 5; 8; 15 - External Works Sheet 3 5548 kb 21/12/2020
Condition No. 14 - Drainage Plan 1 of 4 692 kb 21/12/2020
Condition No. 14 - Drainage Plan 4 of 4 504 kb 21/12/2020
Condition No. 14 - Drainage Plan 3 of 4 665 kb 21/12/2020
Condition No. 14 - Drainage Plan 2 of 4 1293 kb 21/12/2020
Condition No. 15; 22 - External Works Plan 4 of 4 874 kb 21/12/2020
Supporting Documentation
Condition No. 5 - Materials Schedule Westfield Way 14 kb 21/12/2020
Condition No. 5 - Westfield Way Materials Sheet Email 417 kb 21/12/2020
Condition No. 9 - 1798 01 (sheet 1 Of 2) Landscape Proposal 1142 kb 21/12/2020
Condition No. 9 - 1798 02 (sheet 2 Of 2) Landscape Proposal 1113 kb 21/12/2020
Condition No. 14 - C 52 00108 Flood Exceedance Plan 4 Of 4 Preliminary T03 510 kb 21/12/2020
Condition No. 14 - C 52 00105 Flood Exceedance Plan 1 Of 4 Preliminary T03 628 kb 21/12/2020
Condition No. 14 - C 52 00107 Flood Exceedance Plan 3 Of 4 Preliminary T03 650 kb 21/12/2020
Condition No. 14 - C 52 00106 Flood Exceedance Plan 2 Of 4 Preliminary T03 1249 kb 21/12/2020
Condition No. 14 - C 52 00130 Drainage Composite Plan Preliminary T02 1686 kb 21/12/2020
Condition No. 5; 15 - Retaining Wall Details 203 kb 21/12/2020
Condition No. 18: 19; 20 - Construction Environment Management Plan 340 kb 21/12/2020
Condition No. 5; 8; 15 - External Works Sheet 2 6935 kb 26/02/2021
Condition No. 5; 8 & 15 - External Works Sheet 1 - AMENDED 26 02 2021 5580 kb 26/02/2021
Condition No. 15; 22 - External Works Plan 1 of 4 - AMENDED 26 02 2021 1091 kb 26/02/2021
Condition No. 15; 22 - External Works Plan 2 of 4 - AMENDED 26 02 2021 3018 kb 26/02/2021
Condition No. 15; 22 - External Works Plan 4 of 4 - AMENDED 26 02 2021 874 kb 26/02/2021
Condition No. 22 - Block Setting Out Sheet 3 6043 kb 26/02/2021
Condition No. 22 - Block Setting Out Sheet 4 3634 kb 26/02/2021
Condition No. 18 - Site Management Plan 1114 kb 26/02/2021
Condition No. 5; 8 & 15 - External Works Sheet 3 - AMENDED 26 02 2021 7327 kb 26/02/2021
Condition No. 5; 8 & 15 - External Works Sheet 4 - AMENDED 26 02 2021 5069 kb 26/02/2021
Condition No. 14 - Drainage Plan 1 of 4 - AMENDED 26 02 2021 716 kb 26/02/2021
Condition No. 14 - Drainage Plan 2 of 4 - AMENDED 26 02 2021 2055 kb 26/02/2021
Condition No. 14 - Drainage Plan 3 of 4 - AMENDED 26 02 2021 808 kb 26/02/2021
Condition No. 14 - Drainage Plan 4 of 4 - AMENDED 26 02 2021 531 kb 26/02/2021
Condition No. 14 - Drainage Setting Out 1 of 3 - AMENDED 26 02 2021 593 kb 26/02/2021
Condition No. 14 - Drainage Setting Out 2 of 3 - AMENDED 26 02 2021 1152 kb 26/02/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 04/01/2021 -
Engineering Team (Highways) 05/03/2021 -
Engineers (Local Lead Flood Authority) 04/01/2021 -
Environmental Protection Team 04/01/2021 -
Northumbrian Water Ltd 04/01/2021 -