Location
LAND ALONG THE DOGGER BANK C AND SOFIA OFFSHORE WIND FARMS CABLE CORRIDOR BETWEEN LANDFALL NEAR MARSKE BY THE SEA AND LACKENBY NATIONAL GRID SUBSTATION
Proposal
DISCHARGE OF CONDITION 7 OF PLANNING PERMISSION R/2020/0355/FFM FOR INSTALLATION OF UNDERGROUND HIGH VOLTAGE ELECTRICAL CABLES AND ANCILLARY WORKS WITHIN FIVE AREAS TO CONNECT EXISTING APPROVED DOGGER BANK C AND SOFIA WIND OFFSHORE WIND FARMS AND LACKENBY SUBSTATION AND ASSOCIATED TEMPORARY CONSTRUC...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Saltburn, Marske and New Marske CP
Applicant
PROJCO 3 & SOWFL
Applicant's Address
1 FORBURY PLACE
43 FORBURY ROAD
READING
RG1 3JH
Agent
ARCUS CONSULTANCY SERVICES LTD
Agent's Address
MR TIM WHEELER
SUITE 1C
SWINEGATE COURT EAST
3 SWINEGATE
YORK
YO1 8AJ
Agent's work phone
Agent's email
Case Officer
Mrs T Spence
Case Officer Telephone
01287 612341
Case Officer Email
Teri.Spence@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
18/12/2020
Date Valid
18/12/2020
Expiry
12/02/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
09/02/2021
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | (1) No stage may commence until written details of the surface and (if any) foul water drainage system (including means of pollution control) for that stage have, following consultation with the relevant sewerage and drainage authorities and the Environment Agency, been submitted to and approved by the local planning authority. (2) The surface water drainage system works must restrict surface water discharge to no more than the greenfield run-off rate (16.2 litres per second). (3) The submitted details for each stage must— (a) provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site (surface water drainage scheme); (b) include a timetable for implementation (foul and surface water schemes); and (c) provide a management and maintenance plan for the lifetime of the proposed schemes (foul and surface water management). (4) The surface and foul water drainage systems must be constructed, managed and maintained in accordance with the approved details. (5) For the avoidance of doubt, each set of submitted details approved under paragraph (1) of this condition may cover one or more stages. REASON: To ensure the development is supported by a suitably designed surface/foul water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to drainage details which are often the first works on site and relate to site preparation. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Covering Letter | 614 kb | 18/12/2020 | |
| Application Form | 1163 kb | 18/12/2020 | |
| Consultee Responses | |||
| Consultee response - Engineers (Local Lead Flood Authority) | 457 kb | 20/01/2021 | |
| Consultee response - Northumbrian Water | 377 kb | 21/01/2021 | |
| Decision | |||
| Compliance Decision Notice Sofia | 1021 kb | 09/02/2021 | |
| Compliance Decision Notice Shared | 1021 kb | 09/02/2021 | |
| Compliance Decision Notice Dogger | 1021 kb | 09/02/2021 | |
| Officer Report | |||
| Compliance Officer Report R20200791cd | 123 kb | 28/04/2021 | |
| Supporting Documentation | |||
| Surface and Foul Water Drainage Scheme | 779 kb | 18/12/2020 | |
| Surface and Foul Water Drainage Scheme - Appendices Part 1 | 9657 kb | 18/12/2020 | |
| Surface and Foul Water Drainage Scheme - Appendices Part 2 | 7094 kb | 18/12/2020 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineers (Local Lead Flood Authority) | 21/12/2020 | - |
| Northumbrian Water Ltd | 21/12/2020 | - |