R/2020/0779/CD

Planning Application Details - Official Consultation has expired.

Location
LAND EAST OF PHEASANT FIELDS LANE SKELTON
Proposal
DISCHARGE OF CONDITIONS 4; 8; 9; 10; 11 & 12 OF PLANNING PERMISSION R/2020/0070/FFM FOR ERECTION OF TRADE COUNTER UNITS (USE CLASS B8) AND BUILDERS' MERCHANT (SUI GENERIS) WITH ASSOCIATED PARKING AND SERVICE AREA; ENGINEERING WORKS INCLUDING RELEVELLING, NEW ACCESS LANDSCAPING
Application Type
Condition Discharge
Status
Approved
Parish(es)
Skelton and Brotton CP
Applicant
CARNWORTH (SIX) LIMITED
Applicant's Address
. C/O BRADBURY & CO 34 MIDDLE STREET DRIFFIELD YO25 6PS
Agent
LICHFIELDS
Agent's Address
MISS EMILY THOMSON ST NICHOLAS BUILDING ST NICHOLAS STREET NEWCASTLE UPON TYNE NE1 1RF
Agent's work phone
Agent's email
Case Officer
Mr A Miller
Case Officer Telephone
01287 612454
Case Officer Email
Adrian.Miller@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
14/12/2020
Date Valid
14/12/2020
Expiry
08/02/2021
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
25/01/2021
Decision Level
-

Conditions table
# Condition Details
1 Prior to the commencement of the development, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Plan shall be adhered to throughout the construction period. The CEMP shall provide details of the following; (i) The parking of vehicles for site operatives and visitors; (ii) Loading and unloading of plant and material (iii) Storage of plant and materials used in constructing the development (iv) The erection and maintenance of security hoarding including decorative displays (v) Wheel washing facilities (vi) Measures to control the emission of noise dust and vibration during the construction period (vii) Measures for recycling/disposing of waste resulting from demolition and construction works. REASON: To protect the amenity of nearby commercial residents and in the interests of highway safety. REASON FOR PRE-COMMENCEMENT: The CEMP is required to be approved in advance of the commencement of development as the information required relates to mitigating the environmental impact of the development relating the commencement of engineering works.
2 Development shall not commence until a detailed scheme for the disposal of foul and surface water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water and the Lead Local Flood Authority. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage infrastructure which is required to be installed as part of the preliminary phase of the development.
3 (1)Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30-year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100-year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100-year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
4 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to drainage details which are often the first works on site and relate to site preparation.
5 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short- and long-term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
6 Unless otherwise agreed by the Local Planning Authority in writing, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts (a) to (c) have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until condition (e) has been complied with in relation to that contamination. (a) Site Characterisation An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to: • human health, • property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, • adjoining land, • groundwaters and surface waters, • ecological systems, • archeological sites and ancient monuments; (iii) an appraisal of remedial options, and proposal of the preferred option(s). This must be conducted in accordance with Environment Agency’s Land Contamination Risk Management Guidance (b) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (c) Implementation of Approved Remediation Scheme The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. (d) Reporting of Unexpected Contamination In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. (e) Long Term Monitoring and Maintenance A monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation over a period of 10 years, and the provision of reports on the same must be prepared, both of which are subject to the approval in writing of the Local Planning Authority. Following completion of the measures identified in that scheme and when the remediation objectives have been achieved, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be produced, and submitted to the Local Planning Authority. This must be conducted in accordance with Environment Agency’s Land Contamination Risk Management Guidance REASON : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site it relates to land contamination details which are often the first works on site and relate to site preparation.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Covering Letter 168 kb 14/12/2020
Application Form 167 kb 14/12/2020
Consultee Responses
Consultee response - Environmental Protection (Contaminated Land) 191 kb 05/01/2021
Consultee response - Environmental Protection (Nuisance) 239 kb 05/01/2021
Consultee response - Northumbrian Water 127 kb 15/01/2021
Consultee response - Engineers (Local Lead Flood Authority) 47 kb 18/01/2021
Decision
Decision Notice 472 kb 25/01/2021
Officer Report
Officer Report 430 kb 25/01/2021
Plans
Site Plan 1571 kb 14/12/2020
Supporting Documentation
Site Environmental Management Plan 1275 kb 14/12/2020
Sustainable Drainage Strategy 389 kb 14/12/2020
Drainage Outline Layout Plan (Sheet 2) 437 kb 14/12/2020
Drainage Outline Layout Plan (Sheet 1) 357 kb 14/12/2020
Topographical Layout Plan as Existing 1 680 kb 14/12/2020
Drainage Catchment Areas Plan as Existing 770 kb 14/12/2020
Topographical Layout Plan as Existing 2 651 kb 14/12/2020
Northumbrian Water Pre-application Advice 546 kb 14/12/2020
Northumbrian Water Plan 1385 kb 14/12/2020
Private Drainage Outfall Plan (Site 2) 667 kb 14/12/2020
Private Drainage Outfall Plan (Site 3) 334 kb 14/12/2020
Drainage Outline Layout Plan (Sheet 3) 2741 kb 14/12/2020
Private Drainage Outfall Plan (Site 1) 1416 kb 14/12/2020
Drainage Calculations 5001 kb 14/12/2020
Flood Risk Assessment 5192 kb 14/12/2020
Phase 2 Site Investigation Report 7982 kb 14/12/2020
Consultation Response 195 kb 11/01/2021
Gas Monitoring Addendum Report 516 kb 11/01/2021
Skelton Boundary Fencing 1441 kb 14/01/2021
Main Construction Build Skelton Welfare 481 kb 14/01/2021
Site Environmental Management Plan(1) 1286 kb 14/01/2021
Welfare And Access Enabling Works 563 kb 14/01/2021
Consultee Name Date Letter Sent Consultation Expiry Date
Condition Discharge - Adrian Miller 17/12/2020 -
Engineering Team (Highways) 17/12/2020 -
Engineers (Local Lead Flood Authority) 17/12/2020 -
Environmental Protection Team 17/12/2020 -
Environmental Protection Team 17/12/2020 -
Northumbrian Water Ltd 17/12/2020 -