R/2020/0465/FFM

Planning Application Details - Official Consultation has expired.

Location
LAND AT METALS RECOVERY AREA NORTH WEST OF PD PORTS; NORTH EAST OF SEMBCORP PIPELINE CORRIDOR AND TEES DOCK ROAD SOUTH EAST OF FORMER SLEM WASTE MANAGEMENT FACILITY AND SOUTH WEST OF HIGHFIELD ENVIRONMENTAL FACILITY SOUTH BANK
Proposal
DEMOLITION OF EXISTING BUILDINGS/STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED WITH GROUND REMEDIATION AND PREPARATION OF LAND FOR DEVELOPMENT
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
SOUTH TEES DEVELOPMENT CORPORATION
Applicant's Address
-
Agent
LICHFIELDS
Agent's Address
THE ST. NICHOLAS BUILDING ST. NICHOLAS STREET NEWCASTLE UPON TYNE NE1 1RF
Agent's work phone
0191 261 5685
Agent's email
heather.overhead@lichfields.uk
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
22/09/2020
Weekly List Expiry Date
-
Date Received
25/08/2020
Date Valid
18/09/2020
Expiry
18/12/2020
Consultation Expiry
03/11/2020
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
12/11/2020
Decision Level
Delegated

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Site Location Plan (Dwg No STDC-SIZ-LF-PLA-0001) received by the Local Planning Authority on 25/08/2020 Existing Ground Spot Levels (Dwg No STDC-SIZ-LF-PLA-0002) received by the Local Planning Authority on 25/08/2020 REASON: To accord with the terms of the planning application.
3 No phase of development shall take place until a Construction Environmental Management Plan (CEMP) for that phase of the development has been submitted to and approved in writing by the Local Planning Authority. The approved CEMP shall be adhered to throughout the construction period of that phase. The CEMP shall include details of any phasing of the approved works across the site and shall demonstrate how the mitigation measures set out in the submitted Habitats Regulations Assessment, Arup, dated 14 August 2020 have been incorporated in to the construction methods and how they will be implemented. The CEMP shall also include the following details: • The method to be used to control the emission of dust, noise and vibration from construction works, including any details of any mitigation measures required; • Measures to control the deposit of mud and debris on adjoining public highways; • Site fencing and security; • Temporary contractors’ buildings, plant, storage of materials, lighting and parking for site operatives; • The use of temporary generators; • The arrangement or turning of vehicles within the site so that they may enter and leave in forward gear; • A risk assessment of construction activities with potentially damaging effects on local ecological receptors including any measures to protect those receptors during construction; • Roles and responsibilities for the implementation of the CEMP requirements and measures; and • Measures to control invasive plant species. REASON: In the interest of neighbour amenity, highways safety and protection of sites of ecological value in accordance with policies SD4 and N4 of the Redcar and Cleveland Local Plan. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to construction details which are often the first works on site and relate to site preparation.
4 No phase of development hereby approved shall take place until further details which are based upon the recommendations set out in the Phase 2 Environmental Site Assessment (Shallow Soils), Arcadis, August 2020 and the Outline Remediation Strategy, Wood, June 2019 have been submitted to and approved by the Local Planning Authority. These details shall include: • An assessment of deep soils, ground and surface water to further assess the risks to Controlled Waters at the site, and the risks to human health from the vapour intrusion pathway; • A further assessment of the risk to identified surface water receptors from concentrations of CoC identified in groundwater; and • A remediation options appraisal for the loose asbestos fibres identified in the Made Ground on the site. Additional data collection may be needed to support the associated risk assessment/remediation design. REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. REASON FOR PRE-COMMENCEMENT: The information is required prior to any works commencing on site as it relates to earth works which are often the first works on site and relate to site preparation.
5 The development hereby approved shall be carried out in accordance with the mitigation measures as set out in the submitted Habitats Regulations Assessment, Arup, dated 14 August 2020, and shall be implemented in full. REASON: In order to ensure that the development does not have an adverse effect on the integrity of the Teesmouth and Cleveland Coast Special Protection Area (SPA) and does not damage or destroy the interest features of the Teesmouth and Cleveland Coast Site of Special Scientific Interest (SSSI).
6 The development hereby approved shall be considerate of the sustainable use of materials already existing on the site where technically and financially feasible. REASON: In the interests of sustainable development.
7 There shall be no site vegetation clearance between March to the end of August unless the project ecologist has first undertaken a checking survey immediately prior to the clearance and confirms in writing to the Local Planning Authority that no active nests are present. REASON: To conserve protected species and their habitat in accordance with policy N4 of the Local Plan.
8 The finished levels of the site following completion of the works hereby approved shall generally be no higher than 8.8m AOD unless agreed in writing with the local planning authority. REASON: To ensure a satisfactory relationship between the site and surrounding development in accordance with policy SD4 of the Local Plan.
9 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 292 kb 25/08/2020
Consultee Responses
Consultee response - Natural Heritage Manager 449 kb 24/09/2020
Consultee Response - Business Growth Team 48 kb 07/10/2020
Consultee response - Northumbrian Water 377 kb 12/10/2020
Consultee response - Environmental Protection (Contaminated Land) 207 kb 13/10/2020
Consultee response - Environmental Protection (Nuisance) 200 kb 13/10/2020
Consultee response - Cleveland Police 450 kb 13/10/2020
Consultee response - Engineers (Local Lead Flood Authority) 451 kb 14/10/2020
Consultee response - Archaeological Consultant 150 kb 14/10/2020
Consultee response - Natural England 123 kb 20/10/2020
Consultee response - Engineering Team (Highways) 46 kb 29/10/2020
Decision
Decision Notice 124 kb 12/11/2020
Officer Report
Officer Report 148 kb 12/11/2020
Supporting Documentation
Covering letter 211 kb 25/08/2020
Desk Based Heritage Assessment 10976 kb 25/08/2020
Remediation Strategy 24691 kb 25/08/2020
Phase 2 Environmental Site Assessment 60069 kb 25/08/2020
Habitat Regulations Assessment 2031 kb 25/08/2020
Ecological Impact Assessment and Biodiversity Net Gain Assessment 2173 kb 25/08/2020
APPROVED PLAN
Location Plan 934 kb 25/08/2020
Existing Ground Levels 777 kb 25/08/2020
Consultee Name Date Letter Sent Consultation Expiry Date
Asset Management - Brian Masterton 22/09/2020 -
Asset Management - Chris Black 22/09/2020 -
Asset Management Team Fao Guy Allen 22/09/2020 -
Business Growth Team 22/09/2020 -
Cleveland Police ALO - Steve Cranston 22/09/2020 -
Councillor S Jeffrey (SOUTH BANK) 22/09/2020 -
Councillor Sandra Smith (SOUTH BANK) 22/09/2020 -
Engineering Team (Highways) 22/09/2020 -
Engineers (Local Lead Flood Authority) 22/09/2020 -
Environmental Protection Team 22/09/2020 -
Environmental Protection Team 22/09/2020 -
Natural England 22/09/2020 -
Natural Heritage Manager 22/09/2020 -
NEAR Ltd (Archaeological Services) 22/09/2020 -
Northumbrian Water Ltd 22/09/2020 -
Place Investment Team 22/09/2020 -
Address Date Sent Date Reconsulted Expiry Date
HECKETT MULTISERVE (UK) LTD TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6TN 22/09/2020 - 13/10/2020
ALBADEN SERVICES LTD TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6UE 22/09/2020 - 13/10/2020
OFFICIAL RECEIVER & LIQUIDATOR FOR SAHAVIRIYA STEEL 2ND FLOOR 3 PICCADILLY PLACE MANCHESTER M1 3BN 22/09/2020 - 13/10/2020
17-27 QUEENS SQUARE MIDDLESBROUGH TS2 1AH 22/09/2020 - 13/10/2020
TEES R E P BIOMASS POWER STATION TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6AF 22/09/2020 - 13/10/2020
TEESPORT LANDFILL SITE TRUNK ROAD SOUTH BANK MIDDLESBROUGH TS6 8JD 22/09/2020 - 13/10/2020
TARMAC WORKS TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6UF 22/09/2020 - 13/10/2020
P D TEESPORT DOCK OFFICE TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6UD 22/09/2020 - 13/10/2020
Site or Press Description Display Date Expiry Date
S ARTICLE 15 13/10/2020 03/11/2020
P ARTICLE 15 25/09/2020 16/10/2020