R/2020/0459/CD

Planning Application Details - Official Consultation has expired.

Location
LAND BETWEEN WILTON INTERNATIONAL AND BRAN SANDS REDCAR
Proposal
PARTIAL DISCHARGE OF CONDITIONS 04; 07; 08; 11; 12; 13; 14; 15; 16 AND 17 OF OUTLINE PERMISSION R/2017/0906/OOM FOR AN OVERHEAD CONVEYOR AND ASSOCIATED STORAGE FACILITIES IN CONNECTION WITH THE YORK POTASH PROJECT (PHASE 1A GROUND REMEDIATION WORKS)
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
ANGLO AMERICAN WOODSMITH LTD
Applicant's Address
MR ROBERT STANILAND C/O AGENT LICHFIELDS 15 ST PAUL'S STREET LEEDS LS1 2JG
Agent
LICHFIELDS
Agent's Address
MR JAMES COX 15 ST PAUL'S STREET LEEDS LS1 2JG
Agent's work phone
Agent's email
Case Officer
Mrs C Griffiths
Case Officer Telephone
01287 612629
Case Officer Email
claire.griffiths@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
24/08/2020
Date Valid
24/08/2020
Expiry
19/10/2020
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
19/10/2020
Decision Level
-

Conditions table
# Condition Details
1 No development is to commence until a phasing plan detailing the number of phases of construction. Prior to the commencement of each new phase of construction, a plan setting out the proposed development and associated temporary operations during that phase, shall be submitted to and agreed in writing by the Local Planning Authority. The phasing plan shall be adhered to at all times. REASON: For the avoidance of doubt.
2 The details submitted pursuant to Condition 1 of the permission shall include details of both the positions and protection of the network of ground gas water monitoring boreholes at the landfill site at Bran Sands. REASON: In the interests of environmental protection
3 -
4 Prior to the commencement of each new phase of development written details of vegetation to be retained, established and created and the provision of bird and bat boxes to be installed shall be submitted to the Local Planning Authority for approval in writing. The approved details shall be implemented prior to the completion of the development and thereafter maintained. REASON: In the interests of habitat protection and enhancement.
5 Prior to the commencement of each new phase of the development a Construction Traffic Management Plan (“CTMP”) has been submitted to the Local Planning Authority for approval in writing by the Local Planning Authority. The provisions of the approved CTMP must be observed at all times during the construction of the authorised development. REASON: In the interests of highway safety.
6 Prior to the commencement of each new phase of development but excluding ecological mitigation works, until a Construction Environmental Management Plan (“CEMP”) for that phase of the development has been submitted to the Local Planning for approval in writing by the Local Planning Authority. The plan must include details of the following: (a) a stakeholder communications plan; (b) details of the methods to control noise and vibration arising from construction activities (including temporary acoustic fencing); (c) details of the methods to be used to control dust and other emissions from the site including a Dust Management Plan; (d) details of all temporary fencing, temporary buildings, compound areas and parking areas including arrangements for their removal following completion of construction; (e) details of areas to be used for the storage of plant and construction materials and waste; (f) details of the facilities to be provided for the storage of fuel, oil and other chemicals, including measures to prevent pollution; (g) details of any temporary lighting arrangements. (h) measures to ensure that construction vehicles do not deposit mud on any highway; (i) details of mitigation measures to protect biodiversity interests within the site and adjacent to it during the construction phases; (j) advisory signage at public access points advising of possible hazards including the potential for sudden noise; (k) asbestos management strategy (if needed); (l) a materials management plan (to include a scheme for recycling/disposing of waste resulting from demolition and construction works); and (m) a protocol for dealing with invasive species All construction works must be carried out in accordance with the CEMP as approved from time to time. REASON: In the interests of biodiversity, public health and public and highway safety.
7 Prior to the commencement of each new phase of development, a programme of archaeological work (a WSI) shall be submitted to and approved by the Local Planning Authority. The approved WSI shall thereafter be carried out in its entirety. REASON: In the interests of heritage.
8 No phase of the approved development is to commence until written ecological management plans for any ecological mitigation or enhancement measures included in the environmental statement for that phase have been submitted to and approved by the Local Planning Authority in consultation with Natural England and the Environment Agency. REASON: To ensure the mitigation/enhancement measure are delivered in a timely manner.
9 Prior to the commencement of each phase of development requiring surface water drainage, a surface water drainage scheme, based on sustainable drainage principles and an assessment of the hydrological and hydro geological context of the development, shall be submitted to and approved in writing by the Local Planning Authority. The surface water drainage strategy shall demonstrate the surface water run-off rates from the impermeable areas of the site for that phase and shall demonstrate that run-off is suitable for discharge to the River Tees/Bran Sands Lagoon. The scheme shall be implemented in accordance with the approved details and thereafter be maintained. REASON: Required to prevent the increased risk of flooding, both on and off site from the outset of the project.
10 Prior to the commencement of each phase a Surface Water Drainage Management Plan shall be submitted to the Local Planning Authority for approval in writing. The Management Plan shall include, where relevant: (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process. The development shall be carried out in accordance with the approved Management Plan. REASON: To minimise the risk of increased flooding and contamination of the surface water drainage system during the construction process.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 169 kb 24/08/2020
Consultee Responses
Consultee response - Natural Heritage Manager 45 kb 02/09/2020
Consultee response - Northumbrian Water 373 kb 22/09/2020
Consultee response - Environmental Protection (Contaminated Land) 195 kb 23/09/2020
Consultee response - Environmental Protection (Nuisance) 241 kb 23/09/2020
Consultee response - Engineers (Local Lead Flood Authority) 460 kb 24/09/2020
Decision
Decision Notice - R/2017/0906/OOM 84 kb 24/08/2020
Decision Notice 526 kb 19/10/2020
Officer Report
Officer Report 360 kb 19/10/2020
Supporting Documentation
Covering Letter and Construction Method Statement - details all conditions as stated 989 kb 24/08/2020
Phase 1A - Bran Sands Capping Earthworks Cross Section 492 kb 24/08/2020
Condition No 16; 17 - Capping Earth Works Surface Water Management Plan 1350 kb 24/08/2020
Condition No 13; 14 - Construction Environmental Management Plan 1892 kb 24/08/2020
Condition No 04; 16; 17 - Phasing Plan - General Arrangement 758 kb 24/08/2020
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 01/09/2020 -
Engineers (Local Lead Flood Authority) 01/09/2020 -
Environmental Protection Team 01/09/2020 -
Environmental Protection Team 01/09/2020 -
Natural Heritage Manager 01/09/2020 -
NEAR Ltd (Archaeological Services) 01/09/2020 -
Northumbrian Water Ltd 01/09/2020 -