R/2020/0381/CD

Planning Application Details - Official Consultation has expired.

Location
LAND TO THE WEST OF FLATTS LANE NORMANBY
Proposal
DISCHARGE OF CONDITION 23 OF PLANNING PERMISSION R/2016/0326/OOM GRANTED ON APPEAL REFERENCE: APP/V0728/W/16/3158336 FOR OUTLINE APPLICATION FOR RESIDENTIAL DEVELOPMENT INCLUDING NEW VEHICULAR AND PEDESTRIAN ACCESSES, INFRASTRUCTURE, OPEN SPACE AND LANDSCAPING (ALL MATTERS RESERVED EXCEPT FOR ACCES...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
MILLER HOMES
Applicant's Address
MR ANDREW WALL CENTRAL BUILDING 26 CARLBURY ROAD AYCLIFFE BUSINESS PARK NEWTON AYCLIFFE DL5 6BH
Agent
MILLER HOMES
Agent's Address
MR ANDREW WALL CENTRAL BUILDING 26 CARLBURY ROAD AYCLIFFE BUSINESS PARK NEWTON AYCLIFFE DL5 6BH
Agent's work phone
Agent's email
Case Officer
Mrs C Griffiths
Case Officer Telephone
01287 612629
Case Officer Email
claire.griffiths@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
-
Date Received
21/07/2020
Date Valid
21/07/2020
Expiry
15/09/2020
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
14/09/2020
Decision Level
Delegated

Conditions table
# Condition Details
1 No development (except for site preparation works and the formation of a site compound) within any phase of the development shall take place until a scheme to dispose of, maintain and manage surface water from each phase has been submitted to, and approved in writing by the local planning authority. The development of each phase shall be implemented and thereafter managed and maintained in accordance with the approved details. The scheme shall include but not be restricted to providing the following details; i. Detailed design of the surface water management system a) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm b) The method used for calculation of the existing greenfield run- off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property without overflowing into drains, local highways or watercourses c) Full Micro Drainage design files (mdx files) including a catchment plan d) The flow path of flood waters for the site as a result of a 1 in 100 year event plus climate change. ii. A build program and timetable for the provision of the critical surface water drainage infrastructure iii. A management plan detailing how surface water runoff from the site will be managed during construction phase iv. Details of adoption responsibilities and management plan for the surface water drainage scheme and any maintenance and funding arrangement.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 168 kb 21/07/2020
Consultee Responses
Consultee response - Engineers (Local Lead Flood Authority) 461 kb 28/07/2020
Decision
Decision Notice 543 kb 14/09/2020
Officer Report
Officer Report 313 kb 14/09/2020
Supporting Documentation
Condition No 23 - SuDS Supporting Information 979 kb 21/07/2020
Condition No 23 - Drainage documentation 3530 kb 21/07/2020
Consultee Name Date Letter Sent Consultation Expiry Date
Engineers (Local Lead Flood Authority) 27/07/2020 -