R/2020/0050/FFM

Planning Application Details - Official Consultation has expired.

Location
LAND AT TILBURY ROAD SOUTH BANK
Proposal
BLOCK OF 3 WORKSHOPS AND 2 DETACHED WELFARE CONTAINERS (1 TWO STOREY WELFARE CONTAINER) WITH ASSOCIATED NEW VEHICULAR AND PEDESTRIAN ACCESSES INCLUDING HARD STANDING AREAS FOR STORAGE OF SHIPPING CONTAINERS , 2.5M HIGH PERIMETER FENCING AND GATES, SUB STATION AND LANDSCAPE BUND (PART RETROSPECTIVE)
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
CLEVELAND CONTAINERS LTD
Applicant's Address
MR JOHNATHAN BULMER CLEVELAND CONTAINERS ESTON ROAD, GRANGETOWN MIDDLESBROUGH TS6 6UA
Agent
FOCUS ARCHITECTURE & SURVEYING
Agent's Address
MR PETER WILSON SUITE 2B KINGS COURT, TEAM VALLEY GATESHEAD NE11 0SH
Agent's work phone
Agent's email
Case Officer
Mrs H Conti
Case Officer Telephone
01287 612340
Case Officer Email
helen.conti@redcar-cleveland.gov.uk
Consultation Start
29/01/2020
Weekly List Expiry Date
04/02/2020
Date Received
27/01/2020
Date Valid
28/01/2020
Expiry
28/04/2020
Consultation Expiry
21/02/2020
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
19/03/2020
Decision Level
-

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: - Drawing no: 2000-002 Rev 04 (Site plan – site arrangements) received by the Local Planning Authority on 5th March 2020 - Drawing No. 210-005 Rev 01 (Proposed screening landscaping works) received by the Local Planning Authority on 17th February 2020 - Drawing No. 300-001 Rev 02 (Workshop Block – ground floor general arrangement) received by the Local Planning Authority on 27th January 2020 - Drawing No. 400-001 Rev 02 (Workshop – general arrangement elevations) received by the Local Planning Authority on 27th January 2020 - Drawing No. 300-002 Rev 02 (Workshop block – roof general arrangements) received by the Local Planning Authority on 27th January 2020 - Drawing No. 500-001 Rev 02 (Workshop – general sections) received by the Local Planning Authority on 27th January 2020 - Drawing No. 200-007 Rev 01 received by the Local Planning Authority on 28 January 2020 - Drawing No. 003 (Drainage Layout) received by the Local Planning Authority on 19th March 2020 - 32” x 10” stacked units ground floor canteen plan received by the Local Planning Authority on 31st January 2020 - 32” x 10” stacked units GA received by the Local Planning Authority on 31st January 2020 - 32' x 10' stacked units ground floor gatehouse internal sections received by the Local Planning Authority on 31st January 2020 REASON: To accord with the terms of the planning application.
3 In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of condition 1, and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of condition 2, which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with condition 3. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological
4 The applicant shall adhere to para 9 recommendations in the combined Phase I and Phase II Environmental Site Investigation and Risk Assessment Reference: 191120.01.R.002. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
5 The working hours for all construction activities on this site are limited to between 08:00 and 18:00 Mondays to Friday and 08:00 to 13:00 Saturdays and not at all on a Sunday or Public Holiday. REASON: To ensure that the any activity during the construction development would not have a significant adverse impact in relation to noise and disturbance in accordance with policy SD4 of the Local Plan.
6 Prior to installation of the lighting scheme, details of the height, type, position, angle and spread of any external lighting shall be submitted to and approved in writing by the Local Planning Authority. The external lighting shall be erected and maintained in accordance with the approved details to minimise light spillage and glare outside the designated area. REASON: In the interests of the amenities of the area and to minimise unnecessary light spillage above and outside the development site
7 Foul Water Discharge The foul flows can discharge without restriction into the 225mm combined public sewer which crosses the site via manhole 9801 or alternatively into the combined public sewer to the west of the site via manhole 8803. Surface Water Discharge No surface water flow from the proposed development will be allowed to connect into the existing public sewerage system unless it is proven that the alternative options which are listed within Part H of the Building Regulations 2003 are not available: Rainwater from a system provided pursuant to sub-paragraphs (1) or (2) shall discharge to one of the following, listed in order of priority – (a) an adequate soakaway or some other adequate infiltration system; or, where that is not reasonably practicable, (b) a watercourse; or, where that is not reasonably practicable, (c) a sewer. If the more sustainable options prove to be unfeasible, a restricted surface water flow of 3.5 l/sec would be permitted to discharge into the following: 225mm diameter combined public sewer which crosses the site via manhole 9801 or alternatively 225mm diameter surface water sewer to the east of the site via manholes 9823 or 9824 Any excess in flows must be attenuated on site. REASON: To ensure sufficient drainage within the site.
8 Prior to the construction of the workshop building details of landscaping measures within the site both for the soil bund and land adjacent to the southern boundary of the site with the A66 should be submitted and approved in writing by the Local Planning Authority. REASON: To ensure the visual impact of the site is limited in accordance with Local Plan Policy SD4.
9 Prior to the construction of the workshop building an acoustic assessment should be submitted and approved in writing by the Local Planning Authority. REASON: To protect the amenity of nearby residential occupiers in accordance with Local Plan Policy SD4
10 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 548 kb 28/01/2020
Consultee Responses
Consultee response - Health & Safety Executive 250 kb 29/01/2020
Consultee response - Environmental Protection (Contaminated Land) 18 kb 03/02/2020
Consultee response - Environmental Protection (Nuisance) 16 kb 03/02/2020
Consultee response - Northumbrian Water 63 kb 04/02/2020
Decision
Decision Notice 54 kb 19/03/2020
Location Plan
Location Plan 204 kb 27/01/2020
Superseded
Site Layout Plan - SUPERSEDED 4522 kb 27/01/2020
Site Plan - Site arrangements SUPERSEDED 4548 kb 05/03/2020
Plans
Site Plan 4522 kb 27/01/2020
Roof Plan of Workshops 259 kb 27/01/2020
Ground Floor Layout Plan of Workshops 101 kb 27/01/2020
Sections of Workshops 526 kb 27/01/2020
3D Image Plan 1096 kb 27/01/2020
Elevations of Workshops 985 kb 27/01/2020
Elevations of Perimeter Fencing and Gates 3053 kb 28/01/2020
Plans and Elevations of Welfare Containers 285 kb 28/01/2020
Site Plan - Site arrangements showing tarmac areas AMENDED 05 03 2020 2907 kb 05/03/2020
ISU Kiosk plans and elevations 306 kb 07/02/2020
Plans and Elevations - Gatehouse option - new welfare 1848 kb 31/01/2020
Elevations - New Welfare Building Elevations 1292 kb 31/01/2020
Plans and Elevations - New Welfare Canteen Option 1467 kb 31/01/2020
Drainage Layout 995 kb 18/03/2020
Supporting Documentation
Design and Access Statement 4087 kb 27/01/2020
Flood Risk Assessment 1611 kb 27/01/2020
Land Contamination Assessment 7597 kb 27/01/2020
Planning Statement 818 kb 27/01/2020
Statement of Community Involvement 1052 kb 27/01/2020
Transport Assessment - Appendix D 2093 kb 27/01/2020
Transport Assessment - Appendix E 2613 kb 27/01/2020
Transport Assessment 9956 kb 27/01/2020
Updated Ground Risk Assessment 707 kb 07/02/2020
Pre Planning Enquiry Response NWL 371 kb 16/03/2020
Pre Planning Enquiry response NWL 483 kb 18/03/2020
Consultee Name Date Letter Sent Consultation Expiry Date
Business Growth Team 29/01/2020 -
Cleveland Police ALO - Steve Cranston 29/01/2020 -
Councillor S Jeffrey (SOUTH BANK) 29/01/2020 -
Councillor Sandra Smith (SOUTH BANK) 29/01/2020 -
Engineering Team (Highways) 29/01/2020 -
Engineers (Local Lead Flood Authority) 29/01/2020 -
Environmental Protection Team 29/01/2020 -
Health & Safety-Food (Food Team) 29/01/2020 -
Health and Safety Executive 29/01/2020 -
Northumbrian Water Ltd 29/01/2020 -
Place Investment Team 29/01/2020 -
Address Date Sent Date Reconsulted Expiry Date
SCRAPYARD 2 OLD STATION ROAD SOUTH BANK MIDDLESBROUGH TS6 6AD 29/01/2020 - 19/02/2020
TRADE CARS SCRAPYARD OLD STATION ROAD SOUTH BANK MIDDLESBROUGH TS6 6AD 29/01/2020 - 19/02/2020
TOTAL HOUSE OLD STATION ROAD SOUTH BANK MIDDLESBROUGH TS6 6AD 29/01/2020 - 19/02/2020
S K CHILLED FOODS LTD NELSON STREET SOUTH BANK MIDDLESBROUGH TS6 6BJ 29/01/2020 - 19/02/2020
BAKETIME LTD 1 IMPERIAL AVENUE SOUTH BANK MIDDLESBROUGH TS6 6BA 29/01/2020 - 19/02/2020
MINSTER SELF DRIVE OLD STATION ROAD SOUTH BANK MIDDLESBROUGH TS6 6AD 29/01/2020 - 19/02/2020
MILLBANK GARAGE OLD STATION ROAD SOUTH BANK MIDDLESBROUGH TS6 6AD 29/01/2020 - 19/02/2020
ADJACENT TO MILLBANK GARAGE OLD STATION ROAD SOUTH BANK MIDDLESBROUGH TS6 6AD 29/01/2020 - 19/02/2020
OLD STATION ARMS 18 OLD STATION ROAD SOUTH BANK MIDDLESBROUGH TS6 6HA 29/01/2020 - 19/02/2020
SIGMA PLANTFINDER LTD MIDDLESBROUGH ROAD SOUTH BANK TS6 6LZ 29/01/2020 - 19/02/2020
Site or Press Description Display Date Expiry Date
B ARTICLE 15 31/01/2020 21/02/2020