R/2019/0455/CD

Planning Application Details - Official Consultation has expired.

Location
LAND OFF GYPSY LANE NUNTHORPE
Proposal
DISCHARGE OF CONDITIONS 4, 6, 8, 9, 11, 12 & 13 ON RESERVED MATTERS APPLICATION OF OUTLINE PLANNING PERMISSION R/2016/0489/OOM FOR 10 4/5 BEDROOMED DWELLINGS WITH ASSOCIATED GARAGES AND NEW ACCESS (AMENDED SCHEME)
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
NORTH RIDING DEVELOPMENTS LTD
Applicant's Address
MR JOHN KING
Agent
PRISM PLANNING LTD
Agent's Address
MR ROD HEPPLEWHITE MILBURN HOUSE 17 WOODLAND ROAD DARLINGTON DL3 7BJ
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
31/07/2019
Date Received
12/07/2019
Date Valid
12/07/2019
Expiry
06/09/2019
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
05/09/2019
Decision Level
Delegated

Conditions table
# Condition Details
1 Prior to the first occupation of the development boundary walls and fences shall have been erected in accordance with a scheme that has first been agreed in writing with the Local Planning Authority and shall thereafter be maintained. REASON: In the interests of visual and residential amenity.
2 A landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority prior to the commencement of development. The details shall include size, type and species of plant and indicate the proposed layout and surfacing of all open areas. The scheme shall also include details of the proposed landscaping buffer proposed at the west of the site adjacent to the railway line. A programme of work shall also be submitted and implemented in accordance with the approved details. REASON: To reserve the rights of the Local Planning Authority with regard to these matters.
3 Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
4 Details of materials to be used for all hard surfaces shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of the development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
5 Details submitted pursuant to condition 1 shall include existing and proposed ground levels together with finished floor levels for the development. The levels shall be demonstrated by sections through the site. The development shall be carried out in accordance with the approved details REASON: To reserve the rights of the Local Planning Authority with regard to these matters and ensure a satisfactory form of development with regard to neighbouring dwellings.
6 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus 30% climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus 30% Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality.
7 . Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 313 kb 12/07/2019
Consultee Responses
Consultee response - Engineers (Local Lead Flood Authority) 40 kb 19/07/2019
Consultee response - Engineering Team (Highways) 34 kb 24/07/2019
Consultee response - Northumbrian Water 58 kb 30/07/2019
Decision
Decision Notice 109 kb 05/09/2019
Location Plan
Location Plan 123 kb 12/07/2019
Supporting Documentation
Condition No. 04 - Site Layout Plan (Boundary Treatment) 318 kb 12/07/2019
Condition No. 04; 08; 11 - Site Sections/Elevations 392 kb 12/07/2019
Covering Letter 117 kb 12/07/2019
Condition No. 11 - Topographical Survey 458 kb 12/07/2019
Condition No. 06 - Landscaping Specification 58 kb 12/07/2019
Condition No. 06 - Landscape Maintenance 48 kb 12/07/2019
Condition No. 09 - External Works Construction Details 250 kb 12/07/2019
Condition No. 09 - Hard Surfacing Plan and kerbung 520 kb 12/07/2019
Condition No. 12 & 13 - Private Drainage Construction Details 326 kb 12/07/2019
Condition No. 09 - Road Markings 204 kb 12/07/2019
Condition No. 09 - Section 38 & 278 Agreement Plan 522 kb 12/07/2019
Condition No. 09 - Road Construction Details 194 kb 12/07/2019
Condition No. 12 & 13 - Microdrainage Storm Water Sewers 72 kb 12/07/2019
Condition No. 12 & 13 - Longitudinal Sections 132 kb 12/07/2019
Condition No. 12 & 13 - Drainage Engineering Stategy 517 kb 12/07/2019
Condition No. 12 & 13 - Drainage Section 104 Ageement Plan 487 kb 12/07/2019
Consultee Name Date Letter Sent Consultation Expiry Date
Condition Discharge - David Pedlow 18/07/2019 -
Engineering Team (Highways) 18/07/2019 -
Engineers (Local Lead Flood Authority) 18/07/2019 -
Northumbrian Water Ltd 18/07/2019 -