R/2019/0442/CD

Planning Application Details - Official Consultation has expired.

Location
LAND NORTH OF WOODCOCK WOOD AND WEST OF FLATTS LANE NORMANBY
Proposal
DISCHARGE OF CONDITIONS 1, 2, 6 14, 23, 24 & 25 OF PLANNING APPLICATION R/2016/0326/OOM GRANTED ON APPEAL APP/V0728/W/16/3158336 FOR OUTLINE APPLICATION FOR RESIDENTIAL DEVELOPMENT INCLUDING NEW VEHICULAR AND PEDESTRIAN ACCESSES, INFRASTRUCTURE, OPEN SPACE AND LANDSCAPING (ALL MATTERS RESERVED EXCEP...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
THEAKSTON ESTATES LTD
Applicant's Address
C/O AGENT
Agent
LICHFIELDS
Agent's Address
THE ST. NICHOLAS BUILDING ST. NICHOLAS STREET NEWCASTLE UPON TYNE NE1 1RF
Agent's work phone
0191 261 5685
Agent's email
neil.westwick@lichfields.uk
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
31/07/2019
Date Received
08/07/2019
Date Valid
12/07/2019
Expiry
11/10/2019
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
10/10/2019
Decision Level
Delegated

Conditions table
# Condition Details
1 Details of the appearance, landscaping, layout, and scale, (hereinafter called "the reserved matters") shall be submitted to and approved in writing by the local planning authority before any development takes place and the development shall be carried out as approved.
2 Application for approval of the reserved matters shall be made to the local planning authority not later than 3 years from the date of this permission.
3 No development (except for site preparation works and the formation of a site compound) shall take place until a scheme of phasing for the dwellings, highways, and drainage infrastructure and associated open space/green infrastructure has been submitted to and approved in writing by the local planning authority. Development shall be carried out in accordance with the approved details.
4 Prior to the commencement of the first dwelling within each phase, a scheme for the provision, maintenance and management of areas of green infrastructure/open space and play space (excluding private gardens) for each phase shall be submitted to and approved in writing by the local planning authority. Details to be submitted shall include: i. Measures to conserve great crested newts including any trapping out under licence; ii. Details of planting, grass cutting, weeding and pruning; iii. Inspection, repair and maintenance of all hard landscaping and structures; iv. Management, monitoring and operational restrictions; v. Maintenance and planting replacement programme for the establishment period of landscaping together with future management and maintenance; and vi. Trees, hedges and shrubs planted in accordance with the scheme shall not be removed within five years. Any planting which dies, fails to flourish or is removed within a period of 5 years from the substantial completion of the development shall be replaced in the next planting season with others of similar size and species. The development of each phase shall thereafter be carried out, maintained and managed in accordance with the approved details.
5 No development (except for site preparation works and the formation of a site compound) within any phase of the development shall take place until a scheme to dispose of, maintain and manage surface water from each phase has been submitted to, and approved in writing by the local planning authority. The development of each phase shall be implemented and thereafter managed and maintained in accordance with the approved details. The scheme shall include but not be restricted to providing the following details; i. Detailed design of the surface water management system a) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm b) The method used for calculation of the existing greenfield run- off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property without overflowing into drains, local highways or watercourses c) Full Micro Drainage design files (mdx files) including a catchment plan d) The flow path of flood waters for the site as a result of a 1 in 100 year event plus climate change. ii. A build program and timetable for the provision of the critical surface water drainage infrastructure iii. A management plan detailing how surface water runoff from the site will be managed during construction phase iv. Details of adoption responsibilities and management plan for the surface water drainage scheme and any maintenance and funding arrangement.
6 Prior to the commencement of the construction of the first dwelling, a detailed noise mitigation strategy in relation to residential amenity from the A174 shall be submitted to and approved in writing by the local planning authority for the development. The development shall be implemented in accordance with the approved mitigation strategy and the mitigation measures shall be retained throughout the lifetime of the development.
7 Prior to the commencement of the first dwelling within each phase, details of the finished floor levels shall be submitted to and approved in writing by the local planning authority for each phase. The development shall be carried out in accordance with the approved details.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 403 kb 08/07/2019
Covering Letter 197 kb 08/07/2019
Consultee Responses
Consultee response - Natural Heritage Manager 37 kb 18/07/2019
Consultee response - Environmental Protection (Nuisance) 15 kb 27/08/2019
Consultee response - Engineers (Local Lead Flood Authority) 37 kb 11/09/2019
Consultee response - Engineers (Local Lead Flood Authority) 39 kb 10/10/2019
Decision
Compliance Decision Notice 80 kb 10/10/2019
Supporting Documentation
Condition 06 - Phasing Plan Rev B 1614 kb 08/07/2019
Condition 14 - Landscape Masterplan Rev A 1176 kb 08/07/2019
Condition 01 - Engineering Layout 1 of 2 Rev B 1418 kb 08/07/2019
Condition 01 - External Works Sheet 3 Rev B 732 kb 08/07/2019
Condition 01 - External Works Sheet 4 Rev A 633 kb 08/07/2019
Condition 25 - Longsections Sheet 2 157 kb 08/07/2019
Condition 25 - Longsections Sheet 1 152 kb 08/07/2019
Condition 14 - Landscape Masterplan 1235 kb 08/07/2019
Condition 01 - Engineering Layout 1 of 2 1444 kb 08/07/2019
Condition 01 - Engineering Layout 2 of 2 1627 kb 08/07/2019
Condition 01 - External Works Sheet 1 692 kb 08/07/2019
Condition 01 - External Works Sheet 2 753 kb 08/07/2019
Condition 01 - External Works Sheet 3 763 kb 08/07/2019
Condition 01 - External Works Sheet 4 633 kb 08/07/2019
Condition 01 - External Works Sheet 5 607 kb 08/07/2019
Condition 24 - Noise Assessment 4055 kb 08/07/2019
Condition 01 - Planning Compliance Statement 671 kb 08/07/2019
Condition 23 - Micro Drainange Foul Water 130 kb 08/07/2019
Condition 23 - Micro Drainage Surface Water 257 kb 08/07/2019
Location Plan 580 kb 08/07/2019
Condition 06 - Phasing Plan 1591 kb 08/07/2019
Condition 14 - General Maintenance Operations 236 kb 08/07/2019
Condition 14 - Landscape Management 2233 kb 08/07/2019
Condition 25 - Longsections Sheet 3 2491 kb 08/07/2019
Consultee Name Date Letter Sent Consultation Expiry Date
Aboricultural Officer 17/07/2019 -
Condition Discharge - Claire Griffiths 17/07/2019 -
Engineers (Local Lead Flood Authority) 17/07/2019 -
Environmental Protection Team 17/07/2019 -
Natural Heritage Manager 17/07/2019 -