R/2019/0427/FFM

Planning Application Details - Official Consultation has expired.

Location
LAND AT FORMER SOUTH BANK WORKS; GRANGETOWN PRAIRIE; BRITISH STEEL AND WARRENBY AREA
Proposal
DEMOLITION OF STRUCTURES AND ENGINEERING OPERATIONS ASSOCIATED WITH GROUND PREPARATION AND TEMPORARY STORAGE OF SOILS AND ITS FINAL USE IN THE REMEDIATION AND PREPARATION OF LAND FOR REGENERATION AND DEVELOPMENT
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
SOUTH TEES DEVELOPMENT CORPORATION
Applicant's Address
C/o AGENT
Agent
LICHFIELDS
Agent's Address
MRS HEATHER OVERHEAD 3RD FLOOR ST. NICHOLAS BUILDING ST. NICHOLAS STREET NEWCASTLE UPON TYNE NE1 1RF
Agent's work phone
0191 261 5685
Agent's email
heather.overhead@lichfields.uk
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
09/07/2019
Weekly List Expiry Date
17/07/2019
Date Received
01/07/2019
Date Valid
02/07/2019
Expiry
01/10/2019
Consultation Expiry
19/08/2019
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
27/09/2019
Decision Level
Delegated

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Drawing No. STDC-SCW-XX-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SCW-XX-PLA-0002 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-NEZ-WA-PLA-0006 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-MR-PLA-0004 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0007 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-NEZ-WA-PLA-0005 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-LA-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-SB-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0006 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-NEZ-WA-PLA-0004 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-NEZ-WA-PLA-0003 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0005 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0004 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0003 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-MR-PLA-0003 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-WA-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-MR-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0001 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-WA-PLA-0002 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-MR-PLA-0002 received by the Local Planning Authority on 01/07/19 Drawing No. STDC-SIZ-GP-PLA-0002 received by the Local Planning Authority on 01/07/19 REASON: To accord with the terms of the planning application.
3 With the exception of soils used to level ground required to host the temporary storage mounds hereby approved, all soils placed into the temporary storage mounds shall be used in operations associated with ground preparation and remediation works within 10 years of the date of planning permission. REASON: In the interests of amenity
4 The work will be carried out in accordance with the submitted flood risk assessment and drainage strategy (June 2019, wood) and consistent with the layout identified in STDC-SCW-XX-PLA-0002 Materials Storage Site Location Plan with mounds. ? The storage mounds must be sited exclusively in Flood Zone 1 REASON: To prevent flood flows from being displaced and prevent increased risk of flooding elsewhere.
5 The works carried out will be in accordance with the Flood Risk Assessment and Drainage Strategy Doc ref. 41825-WOOD-XX-XX-RP-OW-0001_A_P01 including all appendices dated 01/07/2019. REASON: To prevent increased risk of flooding
6 The approved remediation scheme must be carried out in accordance with its terms unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a validation report that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
7 In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where remediation is necessary a remediation scheme must be prepared and submitted to and approved in writing to the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a validation report must be prepared, which is subject to the approval in writing of the Local Planning Authority. REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. and part d conditions onto any planning permission which may be granted:
8 None of the soils placed into the temporary storage mounds hereby approved shall be transported upon the public highway network unless an assessment of the impacts of transporting soils upon the public highway network is prepared, submitted to and approved by the Local Planning Authority. Any such assessment shall include a transportation management scheme that identifies mitigation measures required to manage the movement of soils on the public highway network. Thereafter, any such transportation on the public highway shall be carried out in accordance with the approved transport management scheme. REASON: In order to ensure no adverse impacts arise on local amenity or the safe and effective operation of the public highway.
9 Prior to the final use of the soils in the implementation of this planning permission, further Ecological Assessment(s) shall be carried out and submitted to the Local Planning Authority in respect of those areas where the soils are to be used for ground preparation and remediation works. The Assessmen (s) shall include up-to-date surveys that identify any priority habitats, ecological networks or protected and priority species. If significant harm to biodiversity cannot be avoided as a result of the final use of the soils, appropriate mitigation including by way of on or off-site compensatory provision, shall be identified in the Ecological Assessment and carried out within the timescales set out in the approved Assessment. REASON: In the interests of conserving biodiversity.
10 Prior to the deposition of earth in any area that has been identified in the Ecology report (ID: INCA 201920) as supporting or potentially supporting reptiles, a reptile mitigation strategy should be prepared, submitted to and approved by the local planning authority and any necessary actions resulting from that implemented in accordance with the strategy. REASON: In the interests of preventing harm to protected species
11 Prior to commencement of the movement of earth associated with the formation of the approved temporary storage mounds or its final use, a Construction and Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved Plan shall be adhered to throughout the implementation of the permission. . The Plan shall provide details of the following; i) The parking of vehicles for site operatives and visitors; ii) Loading and unloading of plant and materials; iii) Storage of plant and materials used in constructing the temporary storage mounds; iv)Measures to control the spread of dirt and debris on the private road network; v) Methods of demolition of any structures to be demolished in order to form the approved temporary storage mounds; vi) Measures to control the emission of noise, dust and vibration during the formation of the temporary storage mounds. . vii) A scheme for recycling/disposing of waste resulting from demolition works that are required to form the approved temporary storage mounds. REASON: In the interests of neighbour amenity and maintaining good Air Quality
12 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form - kb 01/07/2019
Covering Letter - kb 01/07/2019
Consultee Responses
Consultee response - Business & Employment Growth - kb 05/07/2019
Consultee response - Northern Gas Networks - kb 17/07/2019
Consultee response - Natural England - kb 23/07/2019
Consultee response - Network Rail - kb 25/07/2019
Consultee response - Engineering Team (Highways) - kb 30/07/2019
Consultee response - Environmental Protection (Contaminated Land) - kb 06/08/2019
Consultee response - Environmental Protection (Nuisance) - kb 06/08/2019
Consultee response - Environment Agency - kb 08/08/2019
Consultee response - Engineers (Local Lead Flood Authority) - kb 23/08/2019
Decision
Decision Notice - kb 27/09/2019
Location Plan
Location Plan - kb 01/07/2019
Officer Report
Officer Report pdf - kb 26/09/2019
Representations
Neighbour Comments - Kellas Midstream (CATS) - kb 19/07/2019
Neighbour Comments - British Steel Limited - kb 12/08/2019
Superseded
Outline Remediation Strategy SUPERSEDED - kb 01/07/2019
Plans
Details and Sections for Material Storage for Stockpile Site 1A - kb 01/07/2019
Details and Sections for Material Storage for Stockpile Site 1B - kb 01/07/2019
Details and Sections for Material Storage for Stockpile Site 1C - kb 01/07/2019
Typical Exisitng Spot Levels for Grangetown Prairie - kb 01/07/2019
Site Plan for Grangetown Prairie - kb 01/07/2019
Typical Spot Levels for Lackenby Area - kb 01/07/2019
Existing Site Levels Contours and Long Section for Metals Recovery - kb 01/07/2019
Existing Site Levels / Cross Sections for Metals Recovery - kb 01/07/2019
Contours and Sections for Metals Recovery for Stockpile Site 2 - kb 01/07/2019
Site Plan for Metals Recovery - kb 01/07/2019
Typical Existing Spot Levels for South Bank - kb 01/07/2019
Existing Site Levels Contours and Long Section for Warrenby - kb 01/07/2019
Existing Site Levels / Cross Sections for Warrenby - kb 01/07/2019
Details and Sections for Material Storage for Stockpile Site 3A - kb 01/07/2019
Details and Sections for Material Storage for Stockpile Site 3B - kb 01/07/2019
Typical Spot Levels for Warrenby - kb 01/07/2019
Site Plan for Warrenby - kb 01/07/2019
Location Plan showing Storage Mounds - kb 01/07/2019
Existing Site Levels Contours and Long Section for Grangetown Prairie - kb 01/07/2019
Existing Site Levels / Cross Sections for Grangetown Prairie - kb 01/07/2019
Supporting Documentation
NQMS Declaration of Document Adequacy - kb 01/07/2019
Ecology Report - kb 01/07/2019
Planning Statement - kb 01/07/2019
Technical Note - kb 01/07/2019
Outline Remediation Strategy - Appendix A1 Former South Bank Works - kb 01/07/2019
Outline Remediation Strategy - Appendix A2 Geo Insight Report - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Maps - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 1 - 1 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 1 - 2 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 2 - 1 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 2 - 2 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 1:1250 Scale Grid Index - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 1 - 1 to 1 - 3 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 1 - 4 to 2 - 3 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 2 - 4 to 3 - 4 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 3 - 5 to 4 - 2 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 4 - 3 to 5 - 2 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 5 - 3 to 5 - 5 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 6 - 2 to 6 - 4 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 1:2500 Scale Grid Index - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 1 - 1 to 2 - 1 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 2 - 2 to 2 - 4 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 3 - 1 to 3 - 4 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 4 - 1 to 4 - 3 - kb 01/07/2019
Outline Remediation Strategy - Appendix A3 Section 4 - 4 to 5 - 3 - kb 01/07/2019
Outline Remediation Strategy - Appendix B1 Grangetown Prairie - kb 01/07/2019
Outline Remediation Strategy - Appendix B2 Geo Insight Report - kb 01/07/2019
Outline Remediation Strategy - Appendix B3 Maps - kb 01/07/2019
Outline Remediation Strategy - Appendix C1 Plate Mill - kb 01/07/2019
Outline Remediation Strategy - Appendix C2 Geo Insight Report - kb 01/07/2019
Outline Remediation Strategy - Appendix C3 Maps - kb 01/07/2019
Outline Remediation Strategy - Appendix C3 Section 1 - 1 to 1 - 2 - kb 01/07/2019
Outline Remediation Strategy - Appendix C3 Section 2 - 1 to 2 - 3 - kb 01/07/2019
Outline Remediation Strategy - Appendix C3 Section 2 - 4 to 3 - 1 - kb 01/07/2019
Outline Remediation Strategy - Appendix C3 Section 3 - 2 to 3 - 4 - kb 01/07/2019
Outline Remediation Strategy - Appendix C3 Section 1:1250 Scale Maps - kb 01/07/2019
Outline Remediation Strategy - Appendix D1 Coatham Marsh & Warrenby Landfill - kb 01/07/2019
Outline Remediation Strategy - Appendix D2 Geo Insight Report - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 Maps - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 Section 1 - 1 - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 Section 1 - 3 to 2 - 2 - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 Section 2 - 3 to 2 - 5 - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 Section 3 - 1 to 3 - 3 - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 Section 3 - 4 to 4 - 5 - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 1:2500 Scale Grid Index Section 1 - 4 - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 Section 2 - 1 to 2 - 4 - kb 01/07/2019
Outline Remediation Strategy - Appendix D3 Section 3 - 1 to 3 - 4 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix A Figure A1 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix A Figure A2 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix A Figure A3 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix B 1 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix B 2 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix B 3 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix B 4 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix D Management & Maintenance Plan - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix B 5 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix B 6 - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix C Network Design Table for Grangetwon Prairie - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix C Network Design Table for Metals Recovery - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix C Network Design Table for Warrenby 3A - kb 01/07/2019
Flood Risk Assessment and Drainage Strategy - Appendix C Network Design Table for Warrenby B - kb 01/07/2019
Outline Remediation Strategy Amended 24.7.2019 - kb 24/07/2019
Consultee Name Date Letter Sent Consultation Expiry Date
Business Growth Team 04/07/2019 -
Cleveland Police ALO - Steve Cranston 04/07/2019 -
Councillor S Jeffrey (SOUTH BANK) 04/07/2019 -
Councillor Sandra Smith (SOUTH BANK) 04/07/2019 -
Engineering Team (Highways) 04/07/2019 -
Engineers (Local Lead Flood Authority) 04/07/2019 -
Environment Agency 09/07/2019 -
Environmental Protection Team 04/07/2019 -
Health & Safety-Food (Food Team) 04/07/2019 -
Natural England 04/07/2019 -
Network Rail 04/07/2019 -
Northern Gas Network 04/07/2019 -
Place Investment Team 04/07/2019 -
Address Date Sent Date Reconsulted Expiry Date
c/o ERNST & YOUNG LLP 1 MORE LONDON PLACE LONDON SE1 2AF - - -
CATS NORTH SEA LIMITED 7TH FLOOR THE SILVER FIN BUILDING 455 UNION STREET ABERDEEN AB11 6DB - - -
MARSH FARM HOUSE TOD POINT ROAD WARRENBY REDCAR TS10 5BE 09/07/2019 - 30/07/2019
STEEL HOUSE LACKENBY WORKS TRUNK ROAD REDCAR 09/07/2019 - 30/07/2019
REDCAR BULK TERMINAL LTD LACKENBY WORKS TRUNK ROAD REDCAR TS6 7RP 09/07/2019 - 30/07/2019
C H BRIGGS PLANT LTD TOD POINT ROAD WARRENBY REDCAR TS10 5BE 09/07/2019 - 30/07/2019
1 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 09/07/2019 - 30/07/2019
UNIT 5 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 09/07/2019 - 30/07/2019
UNIT 4 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BJ 09/07/2019 - 30/07/2019
D&A SYSTEMS UNIT 6 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 09/07/2019 - 30/07/2019
TRUCK TECH LTD STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 09/07/2019 - 30/07/2019
UNIT 2 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 09/07/2019 - 30/07/2019
UNIT 3 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 09/07/2019 - 30/07/2019
BRITANNIA HOUSE JOHN BOYLE ROAD SOUTH BANK MIDDLESBROUGH TS6 6TY 09/07/2019 - 30/07/2019
TITAN TRAILERS HOLDEN CLOSE GRANGETOWN MIDDLESBROUGH TS6 7AL 09/07/2019 - 30/07/2019
EVERGREEN HOUSE JOHN BOYLE ROAD SOUTH BANK MIDDLESBROUGH TS6 6TY 09/07/2019 - 30/07/2019
L AND C SECURITY STORAGE SMITHS DOCK ROAD SOUTH BANK MIDDLESBROUGH TS6 6UJ 09/07/2019 - 30/07/2019
L AND C SKIP HIRE SMITHS DOCK ROAD SOUTH BANK MIDDLESBROUGH TS6 6UJ 09/07/2019 - 30/07/2019
NET 3 GROUND FLOOR CLEVELAND HOUSE ESTON ROAD GRANGETOWN MIDDLESBROUGH TS6 6UA 09/07/2019 - 30/07/2019
FIRST FLOOR CLEVELAND HOUSE ESTON ROAD GRANGETOWN MIDDLESBROUGH TS6 6UA 09/07/2019 - 30/07/2019
A AND P DOCKSIDE ROAD SOUTH BANK MIDDLESBROUGH TS6 6UZ 09/07/2019 - 30/07/2019
PICKERINGS PLANT LTD JOHN BOYLE ROAD SOUTH BANK MIDDLESBROUGH TS6 6TY 09/07/2019 - 30/07/2019
TEES R E P BIOMASS POWER STATION TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6AF 09/07/2019 - 30/07/2019
MBH LTD TRUCK TECH LTD STAPYLTON STREET GRANGETOWN 09/07/2019 - 30/07/2019
CM PRESTON TRUCK TECH LTD STAPYLTON STREET GRANGETOWN 09/07/2019 - 30/07/2019
TARMAC J PARKER TRUCK TECH LTD STAPYLTON STREET GRANGETOWN 09/07/2019 - 30/07/2019
G AND S RENTALS TRUCK TECH LTD STAPYLTON STREET GRANGETOWN 09/07/2019 - 30/07/2019
HERRING LTD TRUCK TECH LTD STAPYLTON STREET GRANGETOWN 09/07/2019 - 30/07/2019
DAVID FOX TRANSPORT JOHN BOYLE ROAD SOUTH BANK TS6 6TY 09/07/2019 - 30/07/2019
1D VAUGHAN COURT GRANGETOWN MIDDLESBROUGH TS6 7BJ 09/07/2019 - 30/07/2019
CITY ELECTRICAL FACTORS UNIT 7 AND 9 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 09/07/2019 - 30/07/2019
ARIA FOODS LTD 2A VAUGHAN COURT GRANGETOWN MIDDLESBROUGH TS6 7BJ 09/07/2019 - 30/07/2019
VANTECH POCHIN ROAD GRANGETOWN MIDDLESBROUGH TS6 7AT 09/07/2019 - 30/07/2019
MATERIALS PROCESSING INSTITUTE TEESSIDE TECHNOLOGY CENTRE ESTON ROAD GRANGETOWN MIDDLESBROUGH TS6 6US 09/07/2019 - 30/07/2019
CLEVELAND HOUSE ESTON ROAD GRANGETOWN MIDDLESBROUGH TS6 6UA 09/07/2019 - 30/07/2019
SCOTT BROS RECYCLING LTD HOLDEN CLOSE GRANGETOWN MIDDLESBROUGH TS6 7AH 09/07/2019 - 30/07/2019
TARMAC WORKS TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6UF 09/07/2019 - 30/07/2019
HANSON CEMENT TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6UF 09/07/2019 - 30/07/2019
TAM SERVICES TEES OFFSHORE BASE DOCKSIDE ROAD SOUTH BANK MIDDLESBROUGH TS6 6UZ 09/07/2019 - 30/07/2019
STONETECH CLEVELAND LTD UNIT 4 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 09/07/2019 - 30/07/2019
E WIRING NORTHERN LTD W S HOUSE STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BH 09/07/2019 - 30/07/2019
TOTAL BOLT SOLUTIONS LTD JOHN BOYLE ROAD SOUTH BANK MIDDLESBROUGH TS6 6TY 09/07/2019 - 30/07/2019
ABNORMAL LOAD ENGINEERING LTD TEESPORT COMMERCE PARK DOCKSIDE ROAD SOUTH BANK MIDDLESBROUGH TS6 6UZ 09/07/2019 - 30/07/2019
ALBADEN SERVICES LTD TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6UE 09/07/2019 - 30/07/2019
MR MORTON SMITHS DOCK ROAD SOUTH BANK MIDDLESBROUGH TS6 6UJ 09/07/2019 - 30/07/2019
CIVIC AMENITIES SITE TOD POINT ROAD WARRENBY REDCAR TS10 5BE 09/07/2019 - 30/07/2019
HECKETT MULTISERVE (UK) LTD TEESPORT TEES DOCK ROAD GRANGETOWN MIDDLESBROUGH TS6 6TN 09/07/2019 - 30/07/2019
I AND L SCRAPYARD SMITHS DOCK ROAD SOUTH BANK MIDDLESBROUGH TS6 6UJ 09/07/2019 - 30/07/2019
Site or Press Description Display Date Expiry Date
B ARTICLE 15 19/07/2019 09/08/2019
S ARTICLE 15 29/07/2019 19/08/2019