Location
LAND AT FORMER RYEHILLS SCHOOL SITE
REDCAR LANE
REDCAR
Proposal
DISCHARGE OF CONDITIONS 04; 05; 06; & 08 OF PLANNING PERMISSION R/2017/0728/FFM (GRANTED ON APPEAL) APPEAL REFERENCE NUMBER APP/V0728/W/18/3200383 FOR THE ERECTION OF 49 NO. 2, 3, AND 4 BEDROOM TWO-STOREY DWELLINGS AND ASSOCIATED WORKS
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
GLEESON HOMES
Applicant's Address
NORTH EAST SOUTH OFFICE
UNIT 2
CHAPPELL LANE
WYNYARD PARK
TEES VALLEY
TS22 5FG
Agent
GLEESON HOMES
Agent's Address
NORTH EAST SOUTH OFFICE
UNIT 2
CHAPPELL LANE
WYNYARD PARK
TEES VALLEY
TS22 5FG
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
15/02/2019
Date Received
01/02/2019
Date Valid
07/02/2019
Expiry
04/04/2019
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
03/04/2019
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | 4)Prior to the commencement of the development, details shall be submitted and approved by the local planning authority in writing of the surface water drainage scheme, and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include: (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm; (ii) The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses; (iii) Full Micro Drainage design files (mdx files) including a catchment plan, and; (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change. The discharge rate should be limited to 10l/s. |
| 2 | 5) Prior to the commencement of the development, details of a Surface Water Drainage Management Plan shall be submitted to and approved in writing by the local planning authority. The Management Plan shall include: (i) The timetable and phasing for construction of the drainage system; (ii) Details of any control structure(s); (iii) Details of surface water storage structures, and; (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process. The development shall be carried out in accordance with the approved Management Plan. |
| 3 | 6) The development hereby permitted shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the local planning authority. The plan shall include the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted, and; (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system. |
| 4 | 8) No development shall commence until an assessment of the risks posed by any contamination, carried out in accordance with British Standard BS 10175: Investigation of potentially contaminated sites - Code of Practice and the Environment Agency’s Model Procedures for the Management of Land Contamination (CLR 11) (or equivalent British Standard and Model Procedures if replaced), shall have been submitted to and approved in writing by the local planning authority. If any contamination is found, a report specifying the measures to be taken, including the timescale, to remediate the site to render it suitable for the approved development shall be submitted to and approved in writing by the local planning authority. The site shall be remediated in accordance with the approved measures and timescale and a verification report shall be submitted to and approved in writing by the local planning authority. If, during the course of development, any contamination is found which has not been previously identified, work shall be suspended and additional measures for its remediation shall be submitted to and approved in writing by the local planning authority. The remediation of the site shall incorporate the approved additional measures and a verification report for all the remediation works shall be submitted to the local planning authority within 45 days of the report being completed and approved in writing by the local planning authority. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Consultee Responses | |||
| Consultee response - Environmental Protection (Contaminated Land) | 16 kb | 19/02/2019 | |
| Consultee response - Northumbrian Water | 289 kb | 22/03/2019 | |
| Consultee response - Engineers (Drainage LLFA) | 39 kb | 02/04/2019 | |
| Decision | |||
| Compliance Decision Notice | 106 kb | 03/04/2019 | |
| Supporting Documentation | |||
| Condition No. 04 - Micro Drainage Files | 97 kb | 01/02/2019 | |
| Condition No. 04 - Engineering Layout | 751 kb | 01/02/2019 | |
| Condition No. 06 - Surface Water Maintenance Plan | 1275 kb | 01/02/2019 | |
| Condition No. 05 - Construction Phase Surface Water Management Plan | 1361 kb | 01/02/2019 | |
| Condition No. 08 - Geoenvironmental Appraisal | 17914 kb | 07/02/2019 | |
| Condition No. 08 - Remediation Strategy | 5037 kb | 07/02/2019 | |
| Application Documents | |||
| Appeal Decision - R/2017/0728/FFM | 124 kb | 01/02/2019 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineers (Local Lead Flood Authority) | 07/02/2019 | - |
| Environmental Protection Team | 07/02/2019 | - |
| Northumbrian Water Ltd | 15/03/2019 | - |