Location
LAND AT FORMER ROSECROFT SCHOOL
ROSECROFT LANE
LOFTUS
Proposal
DISCHARGE OF CONDITIONS 5; 6; AND 7 ON PLANNING PERMISSION R/2018/0293/FFM FOR RESIDENTIAL DEVELOPMENT OF 69 UNITS INCLUDING NEW VEHICULAR AND PEDESTRIAN ACCESSES
Application Type
Condition Discharge
Status
Approved
Parish(es)
Loftus CP
Applicant
GLEESON REGENERATION LTD
Applicant's Address
MR PETER URWIN
Agent
GLEESON
Agent's Address
MR PETER URWIN
UNIT 2
CHAPELL LANE,
WYNYARD PARK
TS22 5FG
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
07/11/2018
Date Received
31/10/2018
Date Valid
31/10/2018
Expiry
26/12/2018
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
21/12/2018
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
| 2 | Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. |
| 3 | The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 313 kb | 31/10/2018 | |
| Consultee Responses | |||
| Consultee response - Engineers (Drainage LLFA) | 73 kb | 20/12/2018 | |
| Decision | |||
| Decision Notice - R/2018/0293/FFM | 55 kb | 31/10/2018 | |
| Compliance Decision Notice | 103 kb | 21/12/2018 | |
| Supporting Documentation | |||
| Condition No. 05; 06; 07 - Engineering Plan | 4270 kb | 31/10/2018 | |
| Condition No. 05; 06; 07 - Surface Water Calculations | 173 kb | 31/10/2018 | |
| Condition No. 05; 06; 07 - Surface Water Calculations | 157 kb | 31/10/2018 | |
| Condition No. 05; 06; 07 - Surface Water Calculations | 208 kb | 31/10/2018 | |
| Condition No. 05; 06; 07 - Surface Water Calculations | 214 kb | 31/10/2018 | |
| Condition No. 05; 06; 07 - Section 104 Plan | 3343 kb | 31/10/2018 | |
| Condition No. 05; 06; 07 - Construction Phase Surface Water Plan | 1325 kb | 31/10/2018 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineers (Local Lead Flood Authority) | 05/11/2018 | - |
| Northumbrian Water Ltd | 14/12/2018 | - |