R/2018/0602/CD

Planning Application Details - Official Consultation has expired.

Location
KIRKLEATHAM WALLED GARDEN PLANTATION ROAD KIRKLEATHAM REDCAR
Proposal
DISCHARGE OF CONDITIONS 3; 4; 10; 13; 14; 19 & 20 OF PLANNING PERMISSION R/2017/0253/CAM FOR CONTEMPORARY WALLED GARDEN, CATERING ACADEMY WITH RESTAURANT AND SHOP, HORTICULTURAL ACADEMY WITH GLASSHOUSE, EVENTS MARQUEE, NEW VEHICLULAR ACCESS AND ASSOCIATED CAR PARKING AND LANDSCAPING
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
MACKINGS
Applicant's Address
KYMEL TRADING LIMITED 7 WHITNEY WAY BOLDON BUSINESS PARK
Agent
ID PARTNERSHIP
Agent's Address
ST JUDES BARKER STREET NEWCASTLE UPON TYNE NE2 1AS
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
23/10/2018
Date Received
09/10/2018
Date Valid
16/10/2018
Expiry
31/01/2019
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
29/01/2019
Decision Level
Delegated

Conditions table
# Condition Details
1 Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development unless otherwise agreed by the Local Planning Authority in writing. Details shall include; rainwater gutters and pipes, windows and doors, to be used in the external elevations and for the roof and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials and to safeguard the special character of the listed building and the conservation area and the setting of adjacent listed buildings.
2 Details of materials to be used for all hard surfaces shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of the development , unless otherwise agreed by the Local Planning Authority in writing, and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials in the interests of the visual amenity and character of the area
3 Unless otherwise agreed by the Local Planning Authority in writing, no development shall commence until a detailed scheme for the disposal of foul water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF and to ensure the development is supported by adequate foul drainage infrastructure.
4 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality.
5 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.
6 No development shall take place until a detailed acoustic assessment on the existing noise climate at the development site has been submitted to and been approved in writing by the Local Planning Authority. The report shall include a scheme of noise attenuation measures for the development. The noise attenuation measures shall be designed to achieve noise insulation to a standard that nuisance will not be caused to the occupiers of residential accommodation from musical events within the marquee and late night activities including traffic movements and public dispersal and also any external noise emitting mechanical plant including ventilation equipment. REASON: In the interest of mitigating the impact of the development on the residential amenities of the nearest occupiers.
7 Unless otherwise agreed by the Local Planning Authority in writing, no development shall take place until a scheme the external lighting of the development has been submitted and approved by the Local Planning Authority and the development shall be completed in accordance with the approved scheme and maintained in the approved manner. REASON; In order that the Local Planning Authority can exercise appropriate control over the use of external lighting to minimise the impact of light spillage and pollution and the interests of the amenity of the area and the setting of heritage assets.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form - SUPERSEDED 1726 kb 08/10/2018
Application Form - AMENDED 18 10 2018 1722 kb 16/10/2018
Consultee Responses
Consultee response - Northumbrian Water 57 kb 31/10/2018
Consultee response - Environmental Protection (Nuisance) 13 kb 12/11/2018
Consultee response - Development Engineers 81 kb 22/11/2018
Consultee response - Strategic Planning (Conservation) 221 kb 10/12/2018
Consultee response - Engineers (Drainage LLFA) 28 kb 10/12/2018
Consultee response - Planning Officer 14 kb 19/12/2018
Consultee response - Engineers (Drainage LLFA) 73 kb 19/12/2018
Consultee response Condition 03 - Planning Officer A Miller 30 kb 20/12/2018
Decision
Compliance Decision Notice 109 kb 29/01/2019
Supporting Documentation
Condition 20 - External Lighting 751 kb 08/10/2018
Condition 19 - Noise Assessment 1714 kb 08/10/2018
Condition 04 - Hard Surfaces 2918 kb 08/10/2018
Condition No.'s 10; 13 & 14 - Drainage Details SUPERSEDED 696 kb 16/10/2018
Condition No. 03 - External Materials 733 kb 16/10/2018
Condition No. 03 - External Materials 226 kb 16/10/2018
Condition No. 03 - External Materials 113 kb 16/10/2018
Condition No. 03 - External Materials 108 kb 16/10/2018
Condition No. 03 - External Materials 109 kb 16/10/2018
Condition No. 03 - External Materials 230 kb 16/10/2018
Condition No. 03 - External Materials 389 kb 16/10/2018
Condition No. 03 - External Materials 102 kb 16/10/2018
Condition No. 03 - External Materials 543 kb 16/10/2018
R/2017/0253/CAM Decision Notice 74 kb 16/10/2018
Condition No. 13 & 14 - Surface Water Drainage Scheme 532 kb 30/10/2018
Condition No. 13 & 14 - Surface Water Drainage Scheme 703 kb 30/10/2018
Condition No. 10; 13 & 14 - Drainage Detail (Amended) 772 kb 12/11/2018
Condition 03 - Summary Materials Document - SUPERSEDED 2104 kb 19/12/2018
Condition No. 03 - External Materials - Birtley Olde English 1007 kb 25/01/2019
Condition No. 03 - External Materials - Birtley Olde English 2114 kb 25/01/2019
Condition No. 03 - Summary Materials Document - AMENDED 25 01 2019 2380 kb 25/01/2019
Consultee Name Date Letter Sent Consultation Expiry Date
Condition Discharge - Adrian Miller 17/10/2018 -
Condition Discharge - Adrian Miller 17/10/2018 -
Engineers (Local Lead Flood Authority) 17/10/2018 -
Engineers (Local Lead Flood Authority) 13/11/2018 -
Environmental Protection Team 22/10/2018 -
Northumbrian Water Ltd 17/10/2018 -
Strategic Planning Team (CA & LB) 28/01/2019 -
Strategic Planning Team (CA & LB) 10/12/2018 -