Location
GISBOROUGH HALL
WHITBY LANE
GUISBOROUGH
Proposal
DISCHARGE OF CONDITIONS 3, 4, 5 & 6 OF PLANNING PERMISSION R/2017/0686/CAM FOR CONSTRUCTION OF NEW SPA RESORT WITHIN EXISTING WOODLAND INCLUDING SWIMMING POOL, HYDRO POOL, SPA TREATMENT ROOMS, GYM AND CHANGING FACILITIES
Application Type
Condition Discharge
Status
Approved
Parish(es)
Guisborough CP
Applicant
GUISBOROUGH HOTELS LTD
Applicant's Address
GUISBOROUGH HOTELS LTD
GISBOROUGH HALL, WHITBY LANE
GUISBOROUGH
TS14 6PT
Agent
MR MARTIN STEVENS
Agent's Address
ARCHAUS
PETERBOROUGH ROAD
WANSFORD
PE8 6JN
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
14/08/2018
Date Received
01/08/2018
Date Valid
02/08/2018
Expiry
30/11/2018
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
30/11/2018
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials. |
| 2 | Details of materials to be used for all hard surfaces shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of the development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials. |
| 3 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
| 4 | Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - Claire Griffiths | 02/08/2018 | - |
| Engineering Team (Highways) | 02/08/2018 | - |
| Engineers (Local Lead Flood Authority) | 02/08/2018 | - |
| Strategic Planning Team (CA & LB) | 02/08/2018 | - |