Location
GUISBOROUGH GENERAL HOSPITAL
NORTHGATE
GUISBOROUGH
TS14 6HZ
Proposal
DISCHARGE OF CONDITIONS 3 AND 4 OF PLANNING PERMISSION R/2017/0217/FF INTERNAL & EXTERNAL ALTERATIONS TO EXISTING COMMUNITY HOSPITAL WORKS TO INCLUDE DEMOLITION OF A LINK CORRIDOR; MORTUARY AND CHAPEL REPLACE WITH SINGLE STOREY ENTRANCE WITH STATEMENT END FACADE; SINGLE STOREY EXTENSION AT FRONT AS ...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Guisborough CP
Applicant
NHS PROPERTY SERVICES LTD PETER TODD
Applicant's Address
NHS PROPERTY SERVICES LTD
PRIMARY CARE CENTRE
BRINKBURN CRESCENT
HOUGHTON LE SPRING
DH4 5HB
Agent
MR RYAN DORAN
Agent's Address
7 MERCHANT COURT
KOPPPERS WAY
MONKTON BUSINESS PARK SOUTH
HEBBURN
NE31 2EX
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
02/05/2018
Date Received
23/04/2018
Date Valid
24/04/2018
Expiry
19/06/2018
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
18/06/2018
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | Prior to the installation of the new door shown on Drawing No. A_MA_749_XX_116 within the Listed Building, details of the proposed door frame, method of installation and materials shall be submitted to and approved in writing by the Local Planning Authority. REASON: To preserve the character and appearance of the Listed Building |
| 2 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme in so far as it relates to the hard landscaping and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change. Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 314 kb | 23/04/2018 | |
| Consultee Responses | |||
| Consultee response - Northumbrian Water | 40 kb | 30/04/2018 | |
| LLFA comments | 82 kb | 17/05/2018 | |
| Conservation response | 59 kb | 17/05/2018 | |
| Consultee response | 85 kb | 18/06/2018 | |
| Decision | |||
| Decision Notice - R/2017/0217/FF | 34 kb | 24/04/2018 | |
| Compliance Decision Notice | 103 kb | 18/06/2018 | |
| Plans | |||
| Condition 4 - Below Ground Drainage Layout | 949 kb | 23/04/2018 | |
| Condition 3 - New Entrance Door To Listed Building | 37 kb | 23/04/2018 | |
| Condition 4 - Below Ground Drainage Construction 1 | 565 kb | 23/04/2018 | |
| Condition 4 - Below Ground Drainage Construction 2 | 222 kb | 23/04/2018 | |
| Condition 4 - Below Ground Drainage Catchment Plan | 557 kb | 23/04/2018 | |
| Supporting Documentation | |||
| Condition 4 - Drainage Documentation Manhole Schedule | 378 kb | 23/04/2018 | |
| Application Documents | |||
| Revised drawing - Conservation comments | 29 kb | 18/06/2018 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineers (Local Lead Flood Authority) | 26/04/2018 | - |
| Northumbrian Water Ltd | 26/04/2018 | - |
| Strategic Planning Team (CA & LB) | 26/04/2018 | - |