Location
UPSALL HALL
MIDDLESBROUGH ROAD
NUNTHORPE
TS7 0PG
Proposal
DISCHARGE OF CONDITIONS (B) 1, 9, 10 & 11 ON PLANNING PERMISSION R/2017/0546/FF FOR THE CONVERSION AND CHANGE OF USE OF VACANT EDUCATIONAL CENTRE INTO DWELLINGHOUSE; CONVERSION OF VACANT TRAINING WORKSHOPS (FORMER STABLES) INTO DWELLINGHOUSE AND OUTLINE APPLICATION FOR DEMOLITION OF EXISITNG WALLED ...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Guisborough CP
Applicant
MR HOGG
Applicant's Address
Agent
ELG PLANNING
Agent's Address
GATEWAY HOUSE
55 CONISCLIFFE ROAD
DARLINGTON
DL3 7EH
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
02/05/2018
Date Received
05/04/2018
Date Valid
09/04/2018
Expiry
18/06/2018
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
18/06/2018
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | Prior to the construction of any of the six new build plots, the following work shall have either been undertaken or a contract signed by the developer committing to the provision of such works. The works shall include the following items: • All works to the roofs and rainwater goods on the Hall and stables • Repair/Replacement of external windows and doors, as approved; • Repair works to Octagonal Building in accordance with an approved method statement • Removal of incongruous external features from Hall (including ramp/external stairs/extractor fans/ventilation ducts/metal security gates) in accordance with an approved method statement • Repair to stone walls and gate piers in accordance with an approved method statement • Repair to external walls of hall and stables in accordance with an apprvoed method statement • Removal on modern pipework and repair of cornices and ceilings • Joinery repairs to timber panelling in billiard room & library in accordance with and approved method statement • Removal of perspex glazing and fire doors and repair of plasterwork in stairwell; • Demolition of café building and outbuildings within stable yard |
| 2 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
| 3 | Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. |
| 4 | The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system Reason - To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 313 kb | 05/04/2018 | |
| Consultee Responses | |||
| Consultee response | 133 kb | 03/05/2018 | |
| NWL Consultee response | 75 kb | 15/06/2018 | |
| LLFA consultee response | 94 kb | 18/06/2018 | |
| Decision | |||
| Compliance Decision Notice | 107 kb | 18/06/2018 | |
| Supporting Documentation | |||
| Condition 1 - Intermediate Building Contract | 2482 kb | 04/04/2018 | |
| Conditions 9, 10 & 11 - Drainage Statement | 5016 kb | 04/04/2018 | |
| Decision Notice - R/2017/0546/FF | 70 kb | 05/04/2018 | |
| Application Documents | |||
| Drainage Maintenance Plan | 4437 kb | 30/05/2018 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 11/04/2018 | - |
| Engineers (Local Lead Flood Authority) | 11/04/2018 | - |
| Northumbrian Water Ltd | 04/06/2018 | - |