Location
MORTON GRANGE FARM
NUNTHORPE
TS7 0PE
Proposal
DEMOLITION OF A BARN AND CREATION OF TWO DETACHED DWELLINGS
Application Type
Full
Status
Approved
Parish(es)
Guisborough CP
Applicant
MR & MRS WOODALL
Applicant's Address
Agent
PRISM PLANNING LTD
Agent's Address
1ST FLOOR
11 HIGH ROW
DARLINGTON
DL3 7QQ
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
18/04/2018
Weekly List Expiry Date
02/05/2018
Date Received
28/03/2018
Date Valid
17/04/2018
Expiry
12/06/2018
Consultation Expiry
18/05/2018
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
12/06/2018
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2 | The development hereby permitted shall be carried out in accordance with the following approved plans: Drg No. 1881/P/LP 'O' received by the Local Planning Authority on 27/03/18 Proposed Site Plan received by the Local Planning Authority on 27/03/18 Proposed Floor Plans received by the Local Planning Authority on 27/03/18 Proposed Elevations received by the Local Planning Authority on 27/03/18 REASON: To accord with the terms of the planning application. |
| 3 | Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials. |
| 4 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
| 5 | Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. |
| 6 | The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system Reason - To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality. |
| 7 | In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken, and where remediation is necessary a remediation scheme must be prepared which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority Following completion of the development a report must be submitted confirming that unexpected contamination was not encountered during the development. Reason : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors |
| 8 | Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Engineering Team (Highways) | 18/04/2018 | - |
| Engineers (Local Lead Flood Authority) | 18/04/2018 | - |
| Environmental Protection Team | 18/04/2018 | - |
| Environmental Protection Team | 18/04/2018 | - |
| Housing Area Services | 18/04/2018 | - |
| Northumbrian Water Ltd | 18/04/2018 | - |
| Strategic Planning Team (Policy) | 18/04/2018 | - |
| Address | Date Sent | Date Reconsulted | Expiry Date |
|---|---|---|---|
| Morton Carr Farm Nunthorpe TS7 0PE | - | - | - |
| MORTON GRANGE FARM COTTAGE NUNTHORPE MIDDLESBROUGH TS7 0PE | 18/04/2018 | - | 09/05/2018 |
| THE GRANARY MORTON GRANGE FARM NUNTHORPE MIDDLESBROUGH TS7 0PE | 18/04/2018 | - | 09/05/2018 |
| IRISHMANS COTTAGE MORTON GRANGE FARM NUNTHORPE MIDDLESBROUGH TS7 0PE | 18/04/2018 | - | 09/05/2018 |
| MORTON GRANGE FARM NUNTHORPE MIDDLESBROUGH TS7 0PE | 18/04/2018 | - | 09/05/2018 |
| Site or Press | Description | Display Date | Expiry Date |
|---|---|---|---|
| B | DEPARTURE | 27/04/2018 | 18/05/2018 |