DISCHARGE OF CONDITION 5, 6, 10, 11, 12, 13, 15 & 16 ON PLANNING APPROVAL R/2016/0489/OOM FOR OUTLINE APPROVAL FOR 10 4/5 BEDROOMED DWELLINGS WITH ASSOCIATED GARAGES AND NEW ACCESS ( AMENDED SCHEME)
Application Type
Condition Discharge
Status
Part Approved / Part Refused
Parish(es)
Applicant
NORTH RIDING DEVELOPMENTS
Applicant's Address
8 WESTWOOD DRIVE
NORMANBY
MIDDLESBROUGH
TS60NB
Agent
AJ RILEY ARCHITECTS
Agent's Address
24 BEDFORD ROAD
NUNTHORPE
MIDDLESBROUGH
TS7 0BZ
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
05/04/2018
Date Received
21/03/2018
Date Valid
27/03/2018
Expiry
27/07/2018
Consultation Expiry
-
associated_bldreg
-
Decision
PART REFUSED/ PART GRANTED
Decision Date
27/07/2018
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | Prior to the commencement of development, details shall be submitted to and agreed in writing by the Local Planning Authority, of proposals to provide contractors car parking and material storage within the site. The details approved shall be retained for use until completion of the development unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highway safety. |
| 2 | A landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority prior to the commencement of development. The details shall include size, type and species of plant and indicate the proposed layout and surfacing of all open areas. The scheme shall also include details of the proposed landscaping buffer proposed at the west of the site adjacent to the railway line. A programme of work shall also be submitted and implemented in accordance with the approved details. REASON: To reserve the rights of the Local Planning Authority with regard to these matters. |
| 3 | Details submitted pursuant to condition 1 shall include a method statement that sets out how the listed boundary stone shall be protected during and post construction. The development shall then be carried out in accordance with the approved method statement. REASON: To ensure the protection of the heritage asset |
| 4 | Details submitted pursuant to condition 1 shall include existing and proposed ground levels together with finished floor levels for the development. The levels shall be demonstrated by sections through the site. The development shall be carried out in accordance with the approved details REASON: To reserve the rights of the Local Planning Authority with regard to these matters and ensure a satisfactory form of development with regard to neighbouring dwellings. |
| 5 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus 30% climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus 30% Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
| 6 | . Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. |
| 7 | Development shall not commence until a detailed scheme for the disposal of foul and surface water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. |
| 8 | Prior to the commencement of development a combined Stage1 and Stage 2 Road Safety Audit shall be submitted to and approved in writing by the Local Planning Authority. The Audit shall be carried out in accordance with DMRB HD 19/03 and the development shall be carried out in accordance with the approved documents. REASON: In the interest of highway safety. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 28/03/2018 | - |
| Engineering Team (Highways) | 28/03/2018 | - |
| Engineering Team (Highways) | 29/06/2018 | - |
| Engineers (Local Lead Flood Authority) | 14/06/2018 | - |
| Engineers (Local Lead Flood Authority) | 28/03/2018 | - |
| Local Lead Flood Authority (MBC) | 14/06/2018 | - |
| Northumbrian Water Ltd | 14/06/2018 | - |
| Northumbrian Water Ltd | 28/03/2018 | - |
| Strategic Planning Team (CA & LB) | 28/03/2018 | - |