Location
WARD RECYCLING LTD
PUDDLERS ROAD
SOUTH BANK
TS6 6TX
Proposal
DEMOLITION OF EXISTING BUILDING NO. 2 AND REPLACE WITH TWO STOREY BUILDING INCLUDING OFFICE ACCOMMODATION; RELOCATION OF EXISTING WEIGHBRIDGE AND ASSOCIATED OFFICE BUILDING AND INSTALLATION OF NEW WEIGHBRIDGE
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
WARD RECYCLING LTD.
Applicant's Address
PUDDLERS ROAD
SOUTH BANK
REDCAR AND CLEVELAND
TS6 6TX
Agent
ROBSONS ARCHITECTURAL SERVICES
Agent's Address
MR LEE ROBSON
12 COTHERSTONE CLOSE
EAGLESCLIFFE
STOCKTON-ON-TEES
TD16 0GD
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
26/04/2018
Weekly List Expiry Date
02/05/2018
Date Received
25/01/2018
Date Valid
25/04/2018
Expiry
25/07/2018
Consultation Expiry
08/06/2018
associated_bldreg
R/2018/0054/SB
Decision
GRANT PLANNING PERMISSION
Decision Date
25/07/2018
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2 | The development hereby permitted shall be carried out in accordance with the following approved plans: Drawing No. 53/P300 Rev P3 (Proposed Site Plan) received by the Local Planning Authority on 29/01/18 Drawing No. 53/P301 Rev P2 (Proposed Floor Plan) received by the Local Planning Authority on 31/01/18 Drawing No. 53/P310 Rev P2 (Proposed Elevations Sheet 1) received by the Local Planning Authority on 25/01/18 Drawing No. 53/P311 Rev P2 (Proposed Elevations Sheet 2) received by the Local Planning Authority on 25/01/18 REASON: To accord with the terms of the planning application. |
| 3 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
| 4 | Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. |
| 5 | The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system Reason - To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality. |
| 6 | Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary. |
| 7 | Informative Note: The application site is on/close to land that has been identified as having a history of potential contamination. It is not considered that the development proposed will give rise to 'significant risk' to health or pollution of controlled waters. It is recommended, however, that the attention of the applicant be drawn to the risk of contaminants in, on or under the site. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Business Growth Team | 26/04/2018 | - |
| Cleveland Police ALO - Steve Cranston | 26/04/2018 | - |
| Councillor I Jeffrey (SOUTH BANK) | 26/04/2018 | - |
| Councillor N Bendelow (SOUTH BANK) | 26/04/2018 | - |
| Councillor S Jeffrey (SOUTH BANK) | 26/04/2018 | - |
| Engineering Team (Highways) | 26/04/2018 | - |
| Engineers (Local Lead Flood Authority) | 26/04/2018 | - |
| Environmental Protection Team | 26/04/2018 | - |
| Environmental Protection Team | 26/04/2018 | - |
| Executive Management Team | 26/04/2018 | - |
| Health & Safety-Food (Food Team) | 26/04/2018 | - |
| Health and Safety Executive (HSC) | 02/05/2018 | - |
| Network Rail | 26/04/2018 | - |
| Northumbrian Water Ltd | 26/04/2018 | - |
| Place Investment Team | 26/04/2018 | - |
| Public Rights of Way | 26/04/2018 | - |
| Ramblers Association | 26/04/2018 | - |
| South Tees Development Company | 26/04/2018 | - |
| Address | Date Sent | Date Reconsulted | Expiry Date |
|---|---|---|---|
| FORMER ECM VEHICLE DELIVERY SERVICE PUDDLERS ROAD SOUTH BANK MIDDLESBROUGH TS6 6TX | 26/04/2018 | - | 17/05/2018 |
| GARAGE TILBURY ROAD SOUTH BANK MIDDLESBROUGH TS6 6AW | 26/04/2018 | - | 17/05/2018 |
| UNIT 2 1 NORMANBY ROAD SOUTH BANK MIDDLESBROUGH TS6 6AR | 26/04/2018 | - | 17/05/2018 |
| UNIT 1 1 NORMANBY ROAD SOUTH BANK MIDDLESBROUGH TS6 6AR | 26/04/2018 | - | 17/05/2018 |
| UNIT 3 1 NORMANBY ROAD SOUTH BANK MIDDLESBROUGH TS6 6AR | 26/04/2018 | - | 17/05/2018 |
| J GUNN SCAFFOLDING SMITHS DOCK ROAD SOUTH BANK MIDDLESBROUGH TS6 6UJ | 26/04/2018 | - | 17/05/2018 |
| WILSON HOUSE PUDDLERS ROAD SOUTH BANK MIDDLESBROUGH TS6 6TX | 26/04/2018 | - | 17/05/2018 |
| JENTONE FREIGHT 1-5 PUDDLERS ROAD SOUTH BANK MIDDLESBROUGH TS6 6TX | 26/04/2018 | - | 17/05/2018 |
| 1-4 PUDDLERS ROAD SOUTH BANK MIDDLESBROUGH TS6 6TX | 26/04/2018 | - | 17/05/2018 |
| Site or Press | Description | Display Date | Expiry Date |
|---|---|---|---|
| B | ARTICLE 15 | 18/05/2018 | 08/06/2018 |