Location
LAND AT HIGH FARM, NORMANBY
OFF SKIPPERS LANE
NORMANBY
Proposal
DISCHARGE OF CONDITIONS 5, 6, 8, 10, 11 & 12 ON PLANNING PERMISSION R/2014/0716/FFM FOR AMENDED SITE LAYOUT TO ALTER THE MIX AND INCREASE NUMBER OF RESIDENTIAL UNITS FROM 62 TO 116 DWELLINGS ON PART OF LAND PREVIOUSLY APPROVED UNDER OUTLINE PLANNING PERMISSION R/2007/1220/OOM AND RESERVED MATTERS AP...
Application Type
Condition Discharge
Status
Withdrawn
Parish(es)
Applicant
KEEPMOAT HOMES
Applicant's Address
MERCHANT HOUSE
12 MERCHANT COURT
MONKTON BUSINESS PARK SOUTH
HEBBURN
NE31 2EX
Agent
KEEPMOAT HOMES
Agent's Address
MERCHANT HOUSE
12 MERCHANT COURT
MONKTON BUSINESS PARK SOUTH
HEBBURN
NE31 2EX
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
26/01/2018
Date Received
08/01/2018
Date Valid
15/01/2018
Expiry
12/03/2018
Consultation Expiry
-
associated_bldreg
-
Decision
WITHDRAWN
Decision Date
01/02/2018
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | Prior to the commencement of development, details shall be submitted to and agreed in writing by the Local Planning Authority, of proposals to provide contractors car parking and material storage within the site. The details approved shall be retained for use until completion of the development unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highway safety. |
| 2 | A landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority prior to the commencement of development. The details shall include size, type and species of plant and indicate the proposed layout and surfacing of all open areas. A programme of work shall also be submitted and implemented in accordance with the approved details. REASON: To reserve the rights of the Local Planning Authority with regard to these matters. |
| 3 | Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials. |
| 4 | The development permitted by this planning permission shall only be carried out in accordance with the approved Flood Risk Assessment (FRA) Addendum 1 dated January 2015 and the following mitigation measures detailed within the FRA: Restricting the overall surface water discharge of the site to 20 l/s. Any additional surface water, generated by the increase in impermeable area as a result of additional dwellings, will be managed on site through increased attenuation so as to not increase the risk of flooding off site. The detailed drainage design shall be submitted to the Local Planning Authority for approval in writing prior to any development taking place. The approved scheme measures shall be fully implemented prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the scheme, or within any other period as may be agreed, in writing, by the Local Planning Authority. REASON: To prevent flooding by ensuring the satisfactory storage of/disposal of surface water from the site and to reduce the risk of flooding to the proposed development and future occupants. |
| 5 | Drainage from parking areas that will discharge to a surface watercourse must be first passed through an oil interceptor. Drainage to soakaway from car parking areas for greater than 50 spaces should be passed through an oil interceptor before discharging to ground. REASON: To prevent pollutants to ground and/or surface waters. |
| 6 | A minimum of 10% of the sites energy requirements shall be provided by embedded renewable energy, unless otherwise first agreed in writing with the Local Planning Authority. REASON: In the interests of sustainability. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Form | |||
| Application Form | 314 kb | 08/01/2018 | |
| Consultee Responses | |||
| Consultee response - Northumbrian Water | 56 kb | 01/02/2018 | |
| Application Documents | |||
| Condition 12 - Sustainability Statement | 82 kb | 08/01/2018 | |
| Condition 5 - Compound Layout/ Build Route | 864 kb | 08/01/2018 | |
| Condition 8 - Highway Details | 250 kb | 08/01/2018 | |
| Condition 5 - Compound Layout | 322 kb | 08/01/2018 | |
| Condition 6 - Landscape Proposal (Sheet 1 of 2) | 596 kb | 08/01/2018 | |
| Condition 6 - Landscape Proposal (Sheet 2 of 2) | 416 kb | 08/01/2018 | |
| Condition 8 - External Materials | 1412 kb | 08/01/2018 | |
| Condition 10 - Flood Risk Assessment | 3819 kb | 08/01/2018 | |
| Condition 11 - Drainage | 2790 kb | 08/01/2018 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - Claire Griffiths | 16/01/2018 | - |
| Condition Discharge - Policy | 16/01/2018 | - |
| Engineering Team (Highways) | 16/01/2018 | - |
| Engineers (Local Lead Flood Authority) | 16/01/2018 | - |
| Northumbrian Water Ltd | 16/01/2018 | - |