Location
LAND BOUNDED BY ORMESBY BANK
GUISBOROUGH ROAD & ROTHESAY GROVE
NUNTHORPE
Proposal
DISCHARGE OF CONDITION 9 OF PLANNING PERMISSION OF R/2016/0142/FFM FOR DETAILED APPLICATION FOR THE DEVELOPMENT OF 128 DWELLINGS INCLUDING ASSOCIATED ACCESS; INFRASTRUCTURE AND OPEN SPACE
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
BELLWAY HOMES NORTH EAST
Applicant's Address
BELLWAY HOUSE
KINGS PARK
KINGSWAY NORTH
GATESHEAD
NE11 0JH
Agent
BELLWAY HOMES NORTH EAST
Agent's Address
BELLWAY HOUSE
KINGS PARK
KINGSWAY NORTH
GATESHEAD
NE11 0JH
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
25/09/2017
Date Received
13/09/2017
Date Valid
13/09/2017
Expiry
08/11/2017
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
07/11/2017
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates to 32.5 l/s with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii) The design shall also ensure that storm water resulting from a 1 in 100 year event, plus 30% climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus 30% REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Application Documents | |||
| Detention Basin | 2030 kb | 10/05/2017 | |
| Longsections Sheet 1 | 2983 kb | 10/05/2017 | |
| Longsections Sheet 2 | 1597 kb | 10/05/2017 | |
| Adoptable Drainage Details | 2139 kb | 10/05/2017 | |
| Hydrobrake Detail | 294 kb | 10/05/2017 | |
| SuDS Headwall Details | 1258 kb | 10/05/2017 | |
| Section 104 | 7338 kb | 10/05/2017 | |
| Engineering Layout | 6045 kb | 10/05/2017 | |
| Flood Route | 6017 kb | 10/05/2017 | |
| External Works Sheet 1 | 6079 kb | 10/05/2017 | |
| External Works Sheet 2 | 7580 kb | 10/05/2017 | |
| External Works Sheet 3 | 5616 kb | 10/05/2017 | |
| PDF compliance Decision Noitce | 60 kb | 07/11/2017 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - Claire Griffiths | 03/10/2017 | - |
| Engineers (Local Lead Flood Authority) | 13/09/2017 | - |