R/2017/0546/FF

Planning Application Details - Official Consultation has expired.

Location
UPSALL HALL MIDDLESBROUGH ROAD GUISBOROUGH TS7 0PG
Proposal
HYBRID APPLICATION FOR CONVERSION AND CHANGE OF USE OF VACANT EDUCATIONAL CENTRE INTO DWELLINGHOUSE; CONVERSION OF VACANT TRAINING WORKSHOPS (FORMER STABLES) INTO DWELLINGHOUSE AND OUTLINE APPLICATION FOR DEMOLITION OF EXISITNG WALLED GARDEN; GLASSHOUSES AND CAFE AND DEVELOPMENT OF 6 DETACHED DWELLI...
Application Type
Major Application
Status
Approved
Parish(es)
Guisborough CP
Applicant
MR HOGG
Applicant's Address
Agent
ELG PLANNING
Agent's Address
GATEWAY HOUSE 55 CONISCLIFFE ROAD DARLINGTON DL3 7EH
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
12/09/2017
Weekly List Expiry Date
15/09/2017
Date Received
01/08/2017
Date Valid
04/09/2017
Expiry
04/12/2017
Consultation Expiry
06/10/2017
associated_bldreg
R/2017/0482/SB
Decision
GRANT PLANNING PERMISSION
Decision Date
04/12/2017
Decision Level
Delegated

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Drawing No. 1585-16-108 received by the Local Planning Authority on 31/07/17 Drawing No. 1585-16-109 received by the Local Planning Authority on 31/07/17 Drawing No. 1585-16-110 received by the Local Planning Authority on 31/07/17 Drawing No. 1585-16-111 Rev A received by the Local Planning Authority on 14/08/17 Drawing No. 1585-16-112 received by the Local Planning Authority on 31/07/17 REASON: To accord with the terms of the planning application.
3 Prior to the construction of any of the six new build plots, the following work shall have either been undertaken or a contract signed by the developer committing to the provision of such works. The works shall include the following items: • All works to the roofs and rainwater goods on the Hall and stables • Repair/Replacement of external windows and doors, as approved; • Repair works to Octagonal Building in accordance with an approved method statement • Removal of incongruous external features from Hall (including ramp/external stairs/extractor fans/ventilation ducts/metal security gates) in accordance with an approved method statement • Repair to stone walls and gate piers in accordance with an approved method statement • Repair to external walls of hall and stables in accordance with an apprvoed method statement • Removal on modern pipework and repair of cornices and ceilings • Joinery repairs to timber panelling in billiard room & library in accordance with and approved method statement • Removal of perspex glazing and fire doors and repair of plasterwork in stairwell; • Demolition of café building and outbuildings within stable yard
4 The development hereby permitted shall be begun not later than the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last of the reserved matters to be approved, whichever is later. REASON: Required to be imposed pursuant to Sections 91 and 92 of the Planning & Compulsory Purchase Act 2004.
5 Details of the appearance, landscaping, layout and scale, (hereinafter called "the reserved matters") shall be submitted to and approved in writing by the Local Planning Authority before the expiration of three years from the date of this permission. REASON: To reserve the rights of the Local Planning Authority with regard to these matters and required to be imposed pursuant to Sections 91 and 92 of the Planning & Compulsory Purchase Act 2004.
6 Prior to the first occupation of the development boundary walls and fences shall have been erected in accordance with a scheme that has first been agreed in writing with the Local Planning Authority and shall thereafter be maintained. The submitted scheme should ensure that the boundary wall of the walled garden is retained and included within any schme. REASON: In the interests of visual and residential amenity.
7 Unless otherwise agreed by the Local Planning Authority in writing, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts (a) to (c) have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until condition (e) has been complied with in relation to that contamination. (a) Site Characterisation An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to: • human health, • property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, • adjoining land, • groundwaters and surface waters, • ecological systems, • archeological sites and ancient monuments; (iii) an appraisal of remedial options, and proposal of the preferred option(s). This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’. (b) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (c) Implementation of Approved Remediation Scheme The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. (d) Reporting of Unexpected Contamination In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. (e) Long Term Monitoring and Maintenance A monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation over a period of 10 years, and the provision of reports on the same must be prepared, both of which are subject to the approval in writing of the Local Planning Authority. Following completion of the measures identified in that scheme and when the remediation objectives have been achieved, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be produced, and submitted to the Local Planning Authority. This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’ REASON : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
8 Prior to the commencement of development details of the existing and proposed ground levels together with finished floor levels shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory form of development.
9 Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
10 Details of materials to be used for all hard surfaces shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of the development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
11 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality.
12 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.
13 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system Reason - To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
14 A landscaping scheme shall be submitted to, and approved in writing by, the Local Planning Authority prior to the commencement of development. The details shall include size, type and species of plant and indicate the proposed layout and surfacing of all open areas. A programme of work shall also be submitted and implemented in accordance with the approved details. REASON: To reserve the rights of the Local Planning Authority with regard to these matters.
15 All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the occupation of the dwellings or the completion of the development, whichever is sooner, and any trees or plants which within a period of ten years from the completion of the development die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. REASON: To ensure the satisfactory implementation of the approved scheme in the interests of the visual amenities of the locality.
16 The working hours for all construction activities on this site are limited to between 08:00 and 18:00 Mondays to Friday and 08:00 to 13:00 Saturdays and not at all on a Sunday or Bank Holidays. REASON: In the interest of neighbour amenity.
17 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 342 kb 24/08/2017
Consultee Responses
Consultee response - Parish/Town Council 524 kb 13/09/2017
Consultee response - Environmental Protection (Contaminated Land) 17 kb 13/09/2017
Consultee response - Environmental Protection (Nuisance) 15 kb 15/09/2017
Consultee response - Natural England 70 kb 21/09/2017
Consultee response - Archaeological Consultant 86 kb 28/09/2017
Consultee response - Northumbrian Water 55 kb 02/10/2017
Consultee response - Development Engineers 13 kb 12/10/2017
Consultee response - Engineers (Drainage LLFA) 36 kb 27/10/2017
Decision
Decision Notice 67 kb 04/12/2017
Location Plan
Site Plans as Existing 81 kb 14/08/2017
Officer Report
Officer Report 208 kb 04/12/2017
Plans
Existing First and Second Floor Plan 49 kb 01/08/2017
Historic Site Plan 1308 kb 01/08/2017
Existing Stable Block Floor Plans 43 kb 01/08/2017
Existing Stable Block Elevations 43 kb 01/08/2017
Existing Basement and Ground Floor Plan 49 kb 01/08/2017
Existing Elevations 59 kb 01/08/2017
Proposed Basement and Ground Floor Plan 69 kb 01/08/2017
Proposed First and Second Floor Plan 62 kb 01/08/2017
Proposed Elevations 59 kb 01/08/2017
Proposed House Type One 682 kb 01/08/2017
Proposed House Type Two 570 kb 01/08/2017
Proposed Stable Block Elevations 47 kb 01/08/2017
Site Plan as Proposed 225 kb 14/08/2017
Proposed Stable Block Floor plans 61 kb 14/08/2017
Supporting Documentation
Covering letter 198 kb 01/08/2017
Statement of Community Involvement 856 kb 01/08/2017
Design Code 1028 kb 01/08/2017
Heritage Impact Assessment 2214 kb 01/08/2017
Ecological Appraisal 6164 kb 01/08/2017
Design and Access Statement 984 kb 01/08/2017
Planning Statement 1669 kb 01/08/2017
Flood Risk Assessment 1677 kb 01/08/2017
Landscaping Details 37817 kb 17/08/2017
Bat Survey Report 4528 kb 24/08/2017
Land Contamination Phase 1 Report 14228 kb 04/09/2017
Consultee Name Date Letter Sent Consultation Expiry Date
Aboricultural Officer 11/09/2017 -
Engineering Team (Highways) 11/09/2017 -
Engineers (Local Lead Flood Authority) 11/09/2017 -
Engineers (Local Lead Flood Authority) 24/10/2017 -
Environmental Protection Team 11/09/2017 -
Environmental Protection Team 11/09/2017 -
Guisborough Town Council 11/09/2017 -
Housing Area Services 11/09/2017 -
Natural England 11/09/2017 -
NEAR Ltd (Archaeological Services) 11/09/2017 -
Northumbrian Water Ltd 11/09/2017 -
Strategic Planning Team (CA & LB) 11/09/2017 -
Strategic Planning Team (Policy) 11/09/2017 -
Address Date Sent Date Reconsulted Expiry Date
UPSALL WARREN MIDDLESBROUGH ROAD GUISBOROUGH MIDDLESBROUGH TS7 0PG 12/09/2017 - 03/10/2017
UPSALL HOUSE RESIDENTIAL HOMES LTD UPSALL HOUSE MIDDLESBROUGH ROAD GUISBOROUGH MIDDLESBROUGH TS7 0LD 12/09/2017 - 03/10/2017
Site or Press Description Display Date Expiry Date
B DEPARTURE 15/09/2017 06/10/2017
B LISTED BUILDING SEC 67 15/09/2017 06/10/2017