R/2017/0524/CD

Planning Application Details - Official Consultation has expired.

Location
SPRING WOOD ROAD GUISBOROUGH
Proposal
DISCHARGE OF CONDITIONS 3; 4; 5; 6; 7; 8; 9; 10 & 12 OF PLANNING PERMISSION R/2016/0612/FFM FOR ERECTION OF 20 BUNGALOWS
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
RYEDALE ESTATES LTD
Applicant's Address
3 GREENS PARK WARKWORTH NORTHUMBERLAND NE65 0GY
Agent
STRINGER & JONES ARCHITECTS
Agent's Address
THE WHITE HOUSE PINCHINTHORPE GUISBOROUGH TS14 8HE
Agent's work phone
01287 619751
Agent's email
tony@stringerjones.com
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
14/08/2017
Date Received
24/07/2017
Date Valid
24/07/2017
Expiry
18/09/2017
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
11/09/2017
Decision Level
Delegated

Conditions table
# Condition Details
1 Prior to the commencement of development, details shall be submitted to and agreed in writing by the Local Planning Authority, of proposals to provide contractors car parking and material storage within the site. The details approved shall be retained for use until completion of the development unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highway safety.
2 Prior to the commencement of development details of the existing and proposed ground levels together with finished floor levels shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory form of development.
3 Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
4 Details of materials to be used for all hard surfaces shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of the development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
5 A minimum of 10% of the sites energy requirements shall be provided by embedded renewable energy, unless otherwise first agreed in writing with the Local Planning Authority. REASON: In the interests of sustainability.
6 Prior to the commencement of development a (traffic management/travel/transport*) plan shall be submitted to and agreed in writing with the Local Planning Authority. The scheme hereby approved shall then be implemented in accordance with the (traffic management/travel/transport*) plan unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highways safety. (*Delete as appropriate)
7 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus 30% climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus 30% Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality.
8 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.
9 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system Reason - To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
10 Development shall not commence until a detailed scheme for the disposal of foul and surface water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Consultee Responses
Consultee response - Northumbrian Water 41 kb 09/08/2017
Supporting Documentation
Condition No. 3; 8 - Contractors Parking / Material Storage 653 kb 24/07/2017
Condition No. 9; 10; 12 - Surface Water / Foul Drainage 2605 kb 24/07/2017
Condition No. 5 - External Materials (Roof Tile) 220 kb 24/07/2017
Condition No. 7 - Energy Statement 209 kb 24/07/2017
Condition No. 4; 9; 12 - Finshed Floor Levels and Drainage 1386 kb 24/07/2017
Condition No. 12 - Surface / Foul Drainage 40 kb 24/07/2017
Condition No. 5 - External Materials (Facing Brick) 1447 kb 24/07/2017
R/2016/0612/FFM Decision Notice 40 kb 24/07/2017
Application Documents
PDF Compliance Decision Notice 67 kb 11/09/2017
Consultee Name Date Letter Sent Consultation Expiry Date
Condition Discharge - David Pedlow 28/07/2017 -
Engineering Team (Highways) 28/07/2017 -
Engineers (Local Lead Flood Authority) 28/07/2017 -
Northumbrian Water Ltd 28/07/2017 -