R/2017/0481/CD

Planning Application Details - Official Consultation has expired.

Location
LAND NORTH OF NEWBURY ROAD BROTTON
Proposal
DISCHARGE OF CONDITIONS 9, 10 & 11 OF PLANNING PERMISSION R/2017/0133/FFM FOR THE ERECTION OF 25 EXTRA CARE BUNGALOWS WITH ASSOCIATED ACCESS, LANDSCAPING AND PARKING (AMENDED SCHEME)
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
MR GRAHAM RAILTON
Applicant's Address
-
Agent
LOGIC ARCHITECTURE
Agent's Address
BOHO ONE BRIDGE STREET WEST MIDDLESBROUGH TS2 1AE FAO MR A MAYFIELD
Agent's work phone
-
Agent's email
mike@logicarchitecture.com
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
21/07/2017
Date Received
10/07/2017
Date Valid
10/07/2017
Expiry
04/09/2017
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
14/08/2017
Decision Level
Delegated

Conditions table
# Condition Details
1 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus 30% climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus 30% Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality.
2 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. Reason - To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.
3 3. The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system Reason - To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Consultee Responses
Consultee response - Northumbrian Water 41 kb 09/08/2017
Decision
PDF compliance decision notice 62 kb 14/08/2017
Plans
Condition 9 - External Works Layout 966 kb 10/07/2017
Condition 9 - Flood Route Strategy 968 kb 10/07/2017
Condition 10 - Hydrobrake Manhole Detail 323 kb 10/07/2017
Supporting Documentation
Condition 9 - Brotton Adoptable SW 61 kb 10/07/2017
Section 104 Agreement 932 kb 10/07/2017
Condition 9 - Brotton Private SW 72 kb 10/07/2017
Application Documents
Decision Notice R/2017/0133/FFM 38 kb 10/07/2017
Consultee Name Date Letter Sent Consultation Expiry Date
Engineers (Local Lead Flood Authority) 04/08/2017 -
Northumbrian Water Ltd 04/08/2017 -