R/2017/0372/FF

Planning Application Details - Official Consultation has expired.

Location
FORMER PETROL FILLING STATION ROSEBERRY ROAD REDCAR
Proposal
ERECTION OF 4 SINGLE STOREY RETAIL UNITS (CLASS A1) WITH ASSOCIATED ACCESS; CAR PARKING; SERVICE ACCESS; LANDSCAPING & BOUNDARY TREATMENTS
Application Type
Full
Status
Approved
Parish(es)
Applicant
MR KEVIN CONWAY
Applicant's Address
6 DE BRUS PARK NUNTHORPE MIDDLESBROUGH TS89RZ
Agent
AJ RILEY ARCHITECTS
Agent's Address
24 BEDFORD ROAD NUNTHORPE MIDDLESBROUGH TS7 0BZ
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
12/07/2017
Weekly List Expiry Date
21/07/2017
Date Received
31/05/2017
Date Valid
11/07/2017
Expiry
08/09/2017
Consultation Expiry
08/08/2017
associated_bldreg
R/2017/0365/SB
Decision
GRANT PLANNING PERMISSION
Decision Date
08/09/2017
Decision Level
Delegated

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan received by the Local Planning Authority on 31/05/17 Proposed Site Layout received by the Local Planning Authority on 31/05/17 Proposed Plans and Elevations received by the Local Planning Authority on 31/05/17 REASON: To accord with the terms of the planning application.
3 Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
4 Details of materials to be used for all hard surfaces shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of the development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
5 Unless otherwise agreed by the Local Planning Authority in writing, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts (a) to (c) have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until condition (e) has been complied with in relation to that contamination. (a) Site Characterisation An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to: • human health, • property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, • adjoining land, • groundwaters and surface waters, • ecological systems, • archeological sites and ancient monuments; (iii) an appraisal of remedial options, and proposal of the preferred option(s). This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’. (b) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (c) Implementation of Approved Remediation Scheme The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. (d) Reporting of Unexpected Contamination In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. (e) Long Term Monitoring and Maintenance A monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation over a period of 10 years, and the provision of reports on the same must be prepared, both of which are subject to the approval in writing of the Local Planning Authority. Following completion of the measures identified in that scheme and when the remediation objectives have been achieved, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be produced, and submitted to the Local Planning Authority. This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’ REASON : To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
6 Prior to the commencement of development, details shall be submitted to and agreed in writing by the Local Planning Authority, of proposals to provide contractors car parking and material storage within the site. The details approved shall be retained for use until completion of the development unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highway safety.
7 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii) The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus climate change REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimis the risk flooding in the locality.
8 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process. The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.
9 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system Reason - To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
10 Details of any external lighting shall be submitted to and approved in writing by the Local Planning Authority before the use hereby permitted commences and the premises used. The details shall include a plan which identifies the location of lighting along with lighting levels that will be provided at the development and at the facades of neighbouring premises. The construction and use of the lighting shall be carried out in accordance with the approved details. REASON: In the interest of residential amenities of the area.
11 Servicing and deliveries to the site shall not take place outside of the hours 0700 to 1900 hours on any day. REASON; To protect the amenities of adjoining residential properties.
12 The premises shall not be open to customers outside the hours of 07:00 and 22:00 on any day. REASON: To safeguard the amenities of residential properties.
13 Development shall be implemented in line with the drainage scheme contained within the submitted document entitled “Surface Water Management Plan”. The drainage scheme shall ensure that the surface water discharge rate to the combined sewer shall not exceed 5l/sec. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF.
14 The working hours for all construction activities on this site are limited to between 08:00 and 18:00 Mondays to Friday and 08:00 to 13:00 Saturdays and not at all on a Sunday or Bank Holidays. REASON: In the interest of neighbour amenity.
15 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted did not meet with the local policies and guidance. Following discussions with the applicant / agent a satisfactory scheme has been negotiated.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 338 kb 31/05/2017
Consultee Responses
Consultee response - Petroleum Officer 67 kb 13/07/2017
Consultee response - Environmental Protection (Contaminated Land) 22 kb 17/07/2017
Consultee response - Environmental Protection (Nuisance) 8 kb 17/07/2017
Consultee response - Northumbrian Water 40 kb 26/07/2017
Consultee response - Engineers (Drainage LLFA) 80 kb 03/08/2017
Consultee response - Cleveland Police 83 kb 04/08/2017
Consultee response - Development Engineers 14 kb 25/08/2017
Decision
Decision Notice 60 kb 08/09/2017
Location Plan
Location Plan 113 kb 31/05/2017
Representations
Neighbour Comments - Turnbull S 295 kb 07/06/2017
Neighbour Comments - White C 26 kb 17/07/2017
Neighbour Comments - Turnbull 91 kb 26/07/2017
Plans
Site Layout 410 kb 31/05/2017
Floor Plans and Elevations 136 kb 31/05/2017
Supporting Documentation
Design and Access Statement 101 kb 31/05/2017
Statement of Community Involvement 27 kb 31/05/2017
Surface Water Management Plan 19 kb 31/05/2017
Contamination Assessment Report 3096 kb 31/05/2017
Contaminated Land - Site Assessment Report 634 kb 31/05/2017
Contaminated Land - Vapour DQRA Report 1597 kb 31/05/2017
Contaminted Land-Vapour Detailed Quantitive Assessment 618 kb 31/05/2017
Retail Assessment 843 kb 11/07/2017
Application Documents
File Documents Scanned 142 kb 24/10/2019
File Documents Scanned 36 kb 24/10/2019
Consultee Name Date Letter Sent Consultation Expiry Date
Cleveland Police ALO - Steve Cranston 18/07/2017 -
Councillor D Quigley (KIRKLEATHAM) 12/07/2017 -
Councillor K Firman (KIRKLEATHAM) 12/07/2017 -
Councillor Mrs B Forster (KIRKLEATHAM) 12/07/2017 -
Engineering Team (Highways) 12/07/2017 -
Engineers (Local Lead Flood Authority) 12/07/2017 -
Environmental Protection Team 12/07/2017 -
Health & Safety-Food (Food Team) 12/07/2017 -
Northumbrian Water Ltd 12/07/2017 -
Petroleum Officer 12/07/2017 -
Strategic Planning Team (Policy) 12/07/2017 -
Address Date Sent Date Reconsulted Expiry Date
7 Newton road - - -
46 ROSEBERRY ROAD REDCAR TS10 4EA 12/07/2017 - 02/08/2017
46 Roseberry Road, Redcar, TS10 4EA - - -
1 BRATHAY WALK REDCAR TS10 4FF 12/07/2017 - 02/08/2017
1 BROUGHTON GREEN REDCAR TS10 4NB 12/07/2017 - 02/08/2017
1 NEWTON ROAD REDCAR TS10 4LW 12/07/2017 - 02/08/2017
1 ROSEBERRY SHOPPING CENTRE ROSEBERRY ROAD REDCAR TS10 4NY 12/07/2017 - 02/08/2017
11 BROUGHTON GREEN REDCAR TS10 4NB 12/07/2017 - 02/08/2017
121 ROSEBERRY ROAD REDCAR TS10 4EG 12/07/2017 - 02/08/2017
123 ROSEBERRY ROAD REDCAR TS10 4EG 12/07/2017 - 02/08/2017
125 ROSEBERRY ROAD REDCAR TS10 4EG 12/07/2017 - 02/08/2017
127 ROSEBERRY ROAD REDCAR TS10 4EG 12/07/2017 - 02/08/2017
3 BROUGHTON GREEN REDCAR TS10 4NB 12/07/2017 - 02/08/2017
3 NEWTON ROAD REDCAR TS10 4LW 12/07/2017 - 02/08/2017
48 ROSEBERRY ROAD REDCAR TS10 4EA 12/07/2017 - 02/08/2017
5 BROUGHTON GREEN REDCAR TS10 4NB 12/07/2017 - 02/08/2017
5 NEWTON ROAD REDCAR TS10 4LW 12/07/2017 - 02/08/2017
50 AYTON DRIVE REDCAR TS10 4LR 12/07/2017 - 02/08/2017
50 ROSEBERRY ROAD REDCAR TS10 4EA 12/07/2017 - 02/08/2017
52 ROSEBERRY ROAD REDCAR TS10 4EA 12/07/2017 - 02/08/2017
54 ROSEBERRY ROAD REDCAR TS10 4EA 12/07/2017 - 02/08/2017
56 ROSEBERRY ROAD REDCAR TS10 4EA 12/07/2017 - 02/08/2017
7 BROUGHTON GREEN REDCAR TS10 4NB 12/07/2017 - 02/08/2017
7 NEWTON ROAD REDCAR TS10 4LW 12/07/2017 - 02/08/2017
9 BROUGHTON GREEN REDCAR TS10 4NB 12/07/2017 - 02/08/2017
9 NEWTON ROAD REDCAR TS10 4LW 12/07/2017 - 02/08/2017
Site or Press Description Display Date Expiry Date
S SITE NOTICE ONLY 18/07/2017 08/08/2017