Location
FORMER ESCO FOUNDARY SITE
RECTORY LANE
GUISBOROUGH
TS14 7DL
Proposal
DISCHARGE OF CONDITIONS 3 - 8 OF PLANNING APPROVAL R/2016/0485/RSM FOR REDEVELOPMENT OF VACANT SITE FOR 3 RETAIL UNITS (USE CLASS A1) AND 10 WORKSHOP UNITS (USE CLASS B2/B8) WITH ASSOCIATED CAR PARKING LAYOUT (277 SPACES) INCLUDING NEW VEHICULAR AND PEDESTRIAN ACCESSES AND LANDSCAPING (RESUBMISSION)
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
DKS ARCHITECTS
Applicant's Address
THE DESIGN STUDIO
ELLERBECK COURT
STOKESLEY BUSINESS PARK
STOKESLEY
TS9 5QT
Agent
DKS ARCHITECTS
Agent's Address
THE DESIGN STUDIO
ELLERBECK COURT
STOKESLEY BUSINESS PARK
STOKESLEY
TS9 5QT
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
19/01/2017
Date Received
04/01/2017
Date Valid
12/01/2017
Expiry
14/04/2017
Consultation Expiry
-
associated_bldreg
R/2017/0015/SB
Decision
CONDITION DISCHARGE GRANTED
Decision Date
13/04/2017
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | Details of the external materials to be used in the carrying out of this permission (including samples) shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials. |
| 2 | Details of materials to be used for all hard surfaces shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of the development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials. |
| 3 | Prior to the commencement of development, details shall be submitted to and agreed in writing by the Local Planning Authority, of proposals to provide contractors car parking and material storage within the site. The details approved shall be retained for use until completion of the development unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highway safety. |
| 4 | Prior to the commencement of development a traffic management plan shall be submitted to and agreed in writing with the Local Planning Authority. The scheme hereby approved shall then be implemented in accordance with the traffic management plan unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highways safety. |
| 5 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii) Measures to mitigate known surface water issues on the northwest corner of the site in order to mitigate the risk of increased flooding in this area (iii) The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus 30% climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iv) Full Micro Drainage design files (mdx files) including a catchment plan (v) The flow path of flood waters for the site as a result on a 1 in 100 year event plus 30% REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimis the risk flooding in the locality. |
| 6 | Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process. The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Decision | |||
| Compliance Decision Notice | 231 kb | 09/03/2017 | |
| Plans | |||
| Traffic Management and Site Drainage Plan | 1369 kb | 04/01/2017 | |
| Impermeable Area Plan | 1001 kb | 04/01/2017 | |
| Proposed Drainage | 906 kb | 04/01/2017 | |
| Flood Flow | 407 kb | 04/01/2017 | |
| Supporting Documentation | |||
| Outfall 1 | 123 kb | 04/01/2017 | |
| Outfall 2 | 123 kb | 04/01/2017 | |
| Application Documents | |||
| 113 kb | 04/01/2017 | ||
| Revised details Peter Dixon | 4244 kb | 31/03/2017 | |
| PDF - Compliance decision notice | 61 kb | 13/04/2017 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 19/01/2017 | - |
| Condition Discharge - Peter Armstrong | 19/01/2017 | - |
| Engineers (Local Lead Flood Authority) | 19/01/2017 | - |