R/2016/0768/CD

Planning Application Details - Official Consultation has expired.

Location
LAND BOUNDED BY ORMESBY BANK GUISBOROUGH ROAD & ROTHESAY GROVE NUNTHORPE (ROSEBERRY MANOR)
Proposal
DISCHARGE OF CONDITIONS 3, 4, 5, 7. 8, 9, 10, 11, 12, 13 & 14 OF PLANNING PERMISSION R/2016/0142/FFM FOR ERECTION OF 128 DWELLINGS
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
BELLWAY HOMES LTD
Applicant's Address
NORTH EAST DIVISION BELLWAY HOUSE KINGS PARK KINGSWAY NORTH TEAM VALLEY GATESHEAD NE11 0JH
Agent
BELLWAY HOMES LTD
Agent's Address
NORTH EAST DIVISION BELLWAY HOUSE KINGS PARK KINGSWAY NORTH TEAM VALLEY GATESHEAD NE11 0JH
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
19/12/2016
Date Received
05/12/2016
Date Valid
09/12/2016
Expiry
17/03/2017
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
17/03/2017
Decision Level
Delegated

Conditions table
# Condition Details
1 Notwithstanding the details submitted and prior to the first occupation of each dwelling boundary walls and fences (including details of retaining walls where applicable) associated with the plot shall have been erected in accordance with a scheme that has first been agreed in writing with the Local Planning Authority and shall thereafter be maintained. The details submitted to be agreed shall include details of any retaining walls which are to be installed on site. REASON: In the interests of visual and residential amenity.
2 Prior to the commencement of development, details shall be submitted to and agreed in writing by the Local Planning Authority, of proposals to provide contractors car parking and material storage within the site. The details approved shall be retained for use until completion of the development unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highway safety
3 Prior to the commencement of development details of the existing and proposed ground levels together with finished floor levels shall be submitted to and approved in writing by the Local Planning Authority. The development shall be completed in accordance with the approved details. REASON: To ensure a satisfactory form of development.
4 Details of materials to be used for all hard surfaces shall be submitted to, and approved in writing by the Local Planning Authority, prior to the commencement of the development and the development shall not be carried out except in accordance with the approved details. REASON: To ensure the use of satisfactory materials.
5 Prior to the commencement of development a traffic management plan shall be submitted to and agreed in writing with the Local Planning Authority. The scheme hereby approved shall then be implemented in accordance with the traffic management plan unless first agreed in writing with the Local Planning Authority. REASON: In the interest of highways safety.
6 Prior to the commencement of the development, or in such extended time that may be agreed with the Local Planning Authority, details of a Surface Water Drainage Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.
7 The development shall not be occupied until a Management & Maintenance Plan for the surface water drainage scheme has been submitted to and approved by the Local Planning Authority; the plan shall include details of the following; (i) A plan clearly identifying the sections of surface water system that are to be adopted (ii) Arrangements for the short and long term maintenance of the SuDS elements of the surface water system REASON: To ensure that the surface water drainage infrastructure is maintained to minimise the risk flooding in the locality.
8 Before any development is commenced a noise and vibration assessment shall be carried out to assess the likelihood of adverse impacts on nearby noise sensitive properties. Where adverse impacts are identified then a scheme of works detailing how the impacts will be reduced to acceptable levels shall be submitted for the prior approval in writing of the Local Planning Authority. The assessment should have due regard to the advice and guidance contained in British Standard BS5228:2009 Code of practice for noise and vibration control on construction and open sites. REASON: To protect the amenity of nearby residents.
9 Development shall not begin until the developer has prepared a scheme of works to deal with dust from the site that adequately takes into account the impact of site preparation and construction works. The scheme required shall be submitted to and approved in writing prior to works commencing. REASON: To protect the amenities of the occupiers of nearby dwellings.
10 No development shall take place until a scheme of ecological mitigation and enhancement, including a timetable for its implementation, to accord with the details set out in the Ecological Appraisal, received by the Local Planning Authority on 16.08.2016, has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in accordance with the approved details and timetable. REASON: To ensure that adequate ecological mitigation measures are installed on site.
11 Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates to 32.5 l/s with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii) The design shall also ensure that storm water resulting from a 1 in 100 year event, plus 30% climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus 30% REASON: To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 130 kb 08/12/2016
Covering Letter 488 kb 08/12/2016
Consultee Responses
Consultee response - Natural Heritage Manager 29 kb 14/12/2016
Consultee response - Middlesbrough Borough Council 86 kb 22/12/2016
Consultee response - Environmental Protection (Nuisance) 14 kb 03/01/2017
Consultee response - Environmental Protection (Nuisance) 13 kb 16/02/2017
Decision
Compliance Decision Notice 128 kb 17/03/2017
Location Plan
Location Plan 152 kb 08/12/2016
Plans
Site Layout Rev 1C 1337 kb 01/03/2017
Site Sections 9342 kb 01/03/2017
Longsections Sheet 1 REV C 2983 kb 01/03/2017
Section 38 REV B 6920 kb 01/03/2017
Road Construction Details REV F 2030 kb 01/03/2017
Supporting Documentation
Section 38 Agreement Letter of confirmation 169 kb 01/03/2017
Application Documents
Condition No. 07 - Kerb Notes & Surface Finishes Sheet 1 1856 kb 08/12/2016
Condition No. 05 & 09 - External Works Sheet 2 7471 kb 08/12/2016
Condition No. 05 & 09 - External Works Sheet 3 4547 kb 08/12/2016
Condition No. 05 & 09 - External Works Sheet 1 6007 kb 08/12/2016
Condition No. 03 - Retaining Walls 424 kb 08/12/2016
Condition No. 03 - Site Layout Plan 1269 kb 08/12/2016
Condition No. 05 & 09 - Engineering Layout 5973 kb 08/12/2016
Condition No. 04 - Material Storage 2190 kb 08/12/2016
Condition No. 14 - Ecological Enhancement Timetable 45 kb 08/12/2016
Condition No. 13 - Dust Management PLan 84 kb 08/12/2016
Condition No. 12 - Noise Assessment 6211 kb 08/12/2016
Condition No. 10 & 11 - Surface Water Management Plan 17069 kb 08/12/2016
Condition No. 09 - Section 104 7582 kb 08/12/2016
Condition No. 09 - Detention Basin GA 2080 kb 08/12/2016
Condition No. 07 - Kerb Notes & Surface Finishes Sheet 2 1885 kb 08/12/2016
Condition No. 08 - Traffic Management Plan 509 kb 08/12/2016
Condition No. 09 - Adoptable Drainage Details 2134 kb 08/12/2016
Condition No. 09 - Hydrobake Manhole S18 1349 kb 08/12/2016
Condition No. 09 - Flood Route Plan 6017 kb 08/12/2016
Condition No. 09 - Headwall Details 1246 kb 08/12/2016
Condition No. 09 - Longsections Sheet 2 1783 kb 08/12/2016
Condition No. 09 - Longsections Sheet 1 2861 kb 08/12/2016
Consultee Name Date Letter Sent Consultation Expiry Date
Condition Discharge - Claire Griffiths 13/12/2016 -
Condition Discharge - Peter Armstrong 13/12/2016 -
Engineers (Local Lead Flood Authority) 13/12/2016 -
Environmental Protection Team 13/12/2016 -
Natural Heritage Manager 13/12/2016 -
Planning and Regeneration Programme 13/12/2016 -