Location
FORMER CRODA SITE
WILTON INTERNATIONAL
REDCAR
Proposal
PROPOSED ANAEROBIC BIOGAS PRODUCTION FACILITY AND COMBINED HEAT AND POWER PLANT
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
CBRE
Applicant's Address
ST MARTIN'S COURT
10 PATERNOSTER ROW
LONDON
EC4M 7HP
Agent
ENJOY DESIGN LTD
Agent's Address
THE OLD BREWERY
HIGH COURT
LEEDS
LS2 7ES
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
10/08/2016
Weekly List Expiry Date
17/08/2016
Date Received
25/07/2016
Date Valid
05/08/2016
Expiry
04/11/2016
Consultation Expiry
09/09/2016
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
13/10/2016
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2 | The development hereby permitted shall be carried out in accordance with the following approved plans: Drawing No. (00)001 received by the Local Planning on 25/07/16 Drawing No. (20)005 received by the Local Planning on 25/07/16 Drawing No. (20)020 received by the Local Planning on 25/07/16 Drawing No. (20)018 received by the Local Planning on 25/07/16 Drawing No. (20)017 received by the Local Planning on 25/07/16 Drawing No. (20)010 received by the Local Planning on 25/07/16 Drawing No. (20)012 received by the Local Planning on 25/07/16 Drawing No. (20)014 received by the Local Planning on 25/07/16 Drawing No. (20)015 received by the Local Planning on 25/07/16 Drawing No. (20)016 received by the Local Planning on 25/07/16 Drawing No. (20)019 received by the Local Planning on 25/07/16 REASON: To accord with the terms of the planning application. |
| 3 | Prior to the commencement of the development, or in such extended time as may be agreed in writing with the Local Planning Authority, details shall be submitted and approved of the surface water drainage scheme and the development shall be completed in accordance with the approved scheme. The design of the drainage scheme shall include; (i) Restriction of surface water greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. (ii)The method used for calculation of the existing greenfield run-off rate shall be the ICP SUDS method. The design shall also ensure that storm water resulting from a 1 in 100 year event, plus 30% climate change surcharging the system, can be stored on site with minimal risk to persons or property and without overflowing into drains, local highways or watercourses. (iii) Full Micro Drainage design files (mdx files) including a catchment plan (iv) The flow path of flood waters for the site as a result on a 1 in 100 year event plus 30% Reason - To ensure the development is supported by a suitably designed surface water disposal infrastructure scheme and to minimise the risk flooding in the locality. |
| 4 | Development shall not commence until a detailed scheme for the disposal of foul water from the development hereby approved has been submitted to and approved in writing by the Local Planning Authority in consultation with Northumbrian Water. Thereafter the development shall take place in accordance with the approved details. REASON: To prevent the increased risk of flooding from any sources in accordance with the NPPF. |
| 5 | Informative Note: The application site is on/close to land that has been identified as having a history of potential contamination. It is not considered that the development proposed will give rise to 'significant risk' to health or pollution of controlled waters. It is recommended, however, that the attention of the applicant be drawn to the risk of contaminants in, on or under the site. |
| 6 | STATEMENT OF COOPERATIVE WORKING: The Local Planning Authority consider that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Cleveland Police ALO - Steve Cranston | 09/08/2016 | - |
| Councillor A D Brown (DORMANSTOWN) | 10/08/2016 | - |
| Councillor C Cawley (DORMANSTOWN) | 10/08/2016 | - |
| Councillor R Goddard (DORMANSTOWN) | 10/08/2016 | - |
| Engineering Team (Highways) | 09/08/2016 | - |
| Engineers (Local Lead Flood Authority) | 09/08/2016 | - |
| Environment Agency | 09/09/2016 | - |
| Environmental Protection - M Gent | 09/08/2016 | - |
| Environmental Protection Team | 21/09/2016 | - |
| Environmental Protection Team | 09/08/2016 | - |
| Executive Management Team | 09/08/2016 | - |
| Health & Safety-Food (Food Team) | 09/08/2016 | - |
| Health and Safety Executive (HSC) | 09/08/2016 | - |
| Natural England | 09/08/2016 | - |
| Northumbrian Water Ltd | 09/08/2016 | - |
| Place Investment Team | 09/08/2016 | - |
| Strategic Planning Team (Policy) | 09/08/2016 | - |
| Address | Date Sent | Date Reconsulted | Expiry Date |
|---|---|---|---|
| FABRICOM PICCADILLY BUILDINGS WILTON SITE LAZENBY MIDDLESBROUGH TS10 4RG | 10/08/2016 | - | 31/08/2016 |
| NALCO LTD PICCADILLY BUILDINGS WILTON SITE LAZENBY MIDDLESBROUGH TS10 4RG | 10/08/2016 | - | 31/08/2016 |
| OCEANEERING INTERNATIONAL PICCADILLY BUILDINGS WILTON SITE LAZENBY MIDDLESBROUGH TS10 4RG | 10/08/2016 | - | 31/08/2016 |
| SEMBCORP UTILITIES UK LTD P.O. BOX 1985 WILTON INTERNATIONAL SITE MIDDLESBROUGH TS90 8WS | 10/08/2016 | - | 31/08/2016 |
| SHELL CHEMICALS POLYMER OFFICES PICCADILLY BUILDINGS WILTON SITE LAZENBY MIDDLESBROUGH TS10 4RG | 10/08/2016 | - | 31/08/2016 |
| WILTON FIRE STATION WILTON SITE LAZENBY MIDDLESBROUGH TS10 | 10/08/2016 | - | 31/08/2016 |
| Site or Press | Description | Display Date | Expiry Date |
|---|---|---|---|
| B | ARTICLE 15 | 19/08/2016 | 09/09/2016 |