Location
LAND AT TEESPORT
TEES DOCK ROAD
GRANGETOWN
Proposal
DISCHARGE OF CONDITION 8 OF SECRETARY OF STATES CONSENT NOTICE R/2008/0671/EA FOR CONSTRUCTION OF 300 MWe BIOMASS FIRED POWER STATION
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
MGT TEESSIDE
Applicant's Address
-
Agent
MGT TEESSIDE
Agent's Address
-
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
04/08/2016
Date Received
14/07/2016
Date Valid
21/07/2016
Expiry
15/09/2016
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
28/07/2016
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | The commencement of the Development shall not take place until there has been submitted to, approved in writing by, and deposited with the Council a scheme which shall including provisions for the: i) details of the siting, design, external appearance of temporary buildings and structures, artificial lighting and fencing to be erected and used during the period of construction of the Development ii) details of temporary vehicular circulation roads, parking, hardstandings, laydown areas, loading and unloading facilities and turning facilities during the construction of the Development iii) phasing of works included in the scheme. Reason: to enable the Council to exercise reasonable and proper control over the temporary works associated with the Development. |
| 2 | The commencement of the main development shall not take place until there has been submitted to, approved in writing by, and deposited with the Council a scheme which shall including provisions for the: i) details of siting, design, dimensions, external appearance and floor levels of all buildings and structures which are to be retained following the completion of the construction of the development. ii) details of the colour, materials and surface finishes in respect of those buildings and structures referred to in i) above. iii) details of vehicular circulation roads, parking, hardstandings, loading and unloading facilities and turning facilities on the site iv) details of artificial lighting required during the operation of the development v) details of all new or modified permanent fencing and gates required on the site vi) details of any proposed landscaping on the site vii) details of fire suppression measures and access of sire appliances to all major buildings, structures and storage areas; and viii) phasing of works included in the scheme. |
| 3 | The commencement of the Development shall not take place until there has been submitted to, approved in writing by, and deposited with the Council, in consultation with the Environment Agency, a scheme showing the method and working of drainage facilities on the site. Such facilities shall be put in place in accordance with the approved scheme. |
| 4 | The scheme referred to in Condition 23 shall include: i) measures to ensure that no leachate or any contaminated surface water from the Site shall be allowed at any time to enter directly or indirectly into any watercourse or underground strata or onto adjoining land; ii) provision so as to ensure that all existing drainage systems continue to operate and that riparian owners upstream and downstream of the site are not adversely affected; iii) provision for trapped gullies in car parks, hardstandings and roadways; iv) measures to ensure that all foul sewage must drain to an approved foul sewerage and/or sewage disposal system; v) provisions to distinguish between temporary and permanent parts of the works; and vi) phasing of works. |
| 5 | The commencement of the Development shall not take place until a flood warning and evacuation plan has been submitted to, approved in writing by, and deposited with, the Council. The plan shall include details of how flood warnings will be obtained and disseminated throughout the site and the action to be taken. The plan shall be operated throughout the lifetime of the Development. |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Condition Discharge - David Pedlow | 26/07/2016 | - |