Proposal
DISCHARGE OF CONDITIONS 4 AND 5 OF PLANNING PERMISSION R/2015/0741/FFM FOR FLOOD ALLEVIATION SCHEME; WORKS TO INCLUDE A FLOOD STORAGE AREA; FLOOD BUNDS; DIVERSION OF THE WATERCOURSE RESPONSIBLE FOR THE FLOODING; AMENDMENTS TO EXISTING CULVERTS; PROVISION OF MAINTENANCE ACCESS FROM TROISDORF WAY AND...
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
HOMES & COMMUNITIES AGENCY
Applicant's Address
SAINT GEORGES HOUSE KINGSWAY TEAM VALLEY GATESHEAD TYNE & WEAR NE11 0NA
Agent
WYG ENGINEERING
Agent's Address
WYG ARNDALE HOUSE HEADINGLEY LEEDS WEST YORKSHIRE LS6 2UJ
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
09/05/2016
Date Received
19/04/2016
Date Valid
28/04/2016
Expiry
23/06/2016
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
05/05/2016
Decision Level
Delegated

Conditions table
# Condition Details
1 No development shall take place until a working method statement to cover channel and bank works is submitted to and agreed in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved scheme. It is expected that the method statement should cover the following requirements: (1) Timing of works (2) Methods used for all channel, bankside water margin works (3) Machinery (location and storage of plant, materials and fuel, access routes, access to banks etc.) (4) Protection of areas of ecological sensitivity and importance (5) Site supervision REASON: To ensure that during the construction phase of the development flood risk will not increase elsewhere.
2 Prior to the commencement of the development, details of a Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process. The removal of silt during operation should also be included. The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Supporting Documentation
Flood Alleviation Scheme - Tender Programme 4426 kb 21/04/2016
R/2015/0741/FFM Decision Notice 51 kb 21/04/2016
Flood Alleviation Scheme - Programme Commentary 977 kb 21/04/2016
Flood allevaition Scheme - RAMS 1975 kb 21/04/2016
Flood Alleviation Scheme - H & S Management 1155 kb 21/04/2016
Consultee Name Date Letter Sent Consultation Expiry Date
Engineers (Local Lead Flood Authority) 28/04/2016 -