R/2016/0088/CD

Planning Application Details - Official Consultation has expired.

Location
LAND AT STOKESLEY ROAD GUISBOROUGH
Proposal
DISCHARGE OF CONDITION 15 OF PLANNING PERMISSION R/2015/0393/RSM RESIDENTIAL DEVELOPMENT (118 DWELLINGS) WITH ASSOCIATED VEHICULAR AND PEDESTRIAN ACCESSES INCLUDING LANDSCAPING
Application Type
Condition Discharge
Status
Approved
Parish(es)
Guisborough CP
Applicant
BELLWAY (YORKS) LTD
Applicant's Address
2 DEIGHTON CLOSE WETHERBY WEST YORKSHIRE LS22 7GZ
Agent
Agent's Address
Agent's work phone
Agent's email
Case Officer
Mrs L Hall
Case Officer Telephone
01287 612343
Case Officer Email
Lyndsey.Hall@redcar-cleveland.gov.uk
Consultation Start
-
Weekly List Expiry Date
09/03/2016
Date Received
15/02/2016
Date Valid
11/02/2016
Expiry
07/04/2016
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
10/06/2016
Decision Level
-

Conditions table
# Condition Details
1 Surface water discharges from this site shall be flow regulated to ensure that flooding problems elsewhere in the catchment are not exacerbated. Final details of a surface water drainage solution shall be submitted to and approved by the Local Planning Authority prior to any dwelling being occupied on the site and the development shall be completed in accordance with the approved scheme. The discharge rates from the site shall be restricted to the existing greenfield run-off rates (QBAR value) with sufficient storage within the system to accommodate a 1 in 30 year storm. The method used for calculating existing greenfield run-off shall be the ICP SUDS method The design shall also ensure that storm water resulting from a 1 in 100 year event plus 30% climate change surcharging the drainage system can be stored on site without risk to people or property and without overflowing into drains, carriageways or watercourse. Full Micro Drainage design files (mdx files) including the catchment plan must to be submitted for approval. The flow path of flood waters for the site as a result of the 1 in 100 year event plus 30% climate change should also be provided. REASON: To ensure the development incorporates a drainage system that deals with surface water discharge form the site and minimises the additional flood risk to the locality.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 108 kb 15/02/2016
Supporting Documentation
Storm Sewer Design 277 kb 15/02/2016
CONDITION DISCHARGE APPLICATION
QD824-03-02-REV H 10421 kb 17/02/2016
(Word) Compliance Decision Notice 98 kb 10/06/2016
Consultee Name Date Letter Sent Consultation Expiry Date
Engineers (Local Lead Flood Authority) 17/02/2016 -