R/2015/0741/FFM

Planning Application Details - Official Consultation has expired.

Location
LAND AT KIRKLEATHAM BUSINESS PARK TROISDORF WAY KIRKLEATHAM REDCAR
Proposal
FLOOD ALLEVIATION SCHEME; WORKS TO INCLUDE A FLOOD STORAGE AREA; FLOOD BUNDS; DIVERSION OF THE WATERCOURSE RESPONSIBLE FOR THE FLOODING; AMENDMENTS TO EXISTING CULVERTS; PROVISION OF MAINTENANCE ACCESS FROM TROISDORF WAY AND ASSOCIATED WORKS
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
HOMES AND COMMUNITIES AGENCY
Applicant's Address
SAINT GEORGES HOUSE KINGSWAY TEAM VALLEY GATESHEAD TYNE AND WEAR NE11 0NA
Agent
WYG ENGINEERING
Agent's Address
WYG ARNDALE COURT HEADINGLEY LEEDS WEST YORKSHIRE LS6 2UJ
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
10/12/2015
Weekly List Expiry Date
22/12/2015
Date Received
30/11/2015
Date Valid
09/12/2015
Expiry
09/03/2016
Consultation Expiry
29/01/2016
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
09/03/2016
Decision Level
Delegated

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Drawing No SK-06 Rev A received by the Local Planning Authority on 30/11/15 Drawing No SK01 P2 received by the Local Planning Authority on 08/12/15 Drawing No SK07 P1 received by the Local Planning Authority on 08/12/15 REASON: To accord with the terms of the planning application.
3 All planting, seeding or turfing detailed within the application shall be carried out in the first planting and seeding season following the completion of the development, and any trees or plants which within a period of ten years from the completion of the development die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. REASON: To ensure the satisfactory implementation of the approved scheme in the interests of the visual amenities of the locality.
4 No development shall take place until a working method statement to cover channel and bank works is submitted to and agreed in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved scheme. It is expected that the method statement should cover the following requirements: (1) Timing of works (2) Methods used for all channel, bankside water margin works (3) Machinery (location and storage of plant, materials and fuel, access routes, access to banks etc.) (4) Protection of areas of ecological sensitivity and importance (5) Site supervision REASON: To ensure that during the construction phase of the development flood risk will not increase elsewhere.
5 Prior to the commencement of the development, details of a Management Plan shall be submitted and approved by the Local Planning Authority. The Management Plan shall include; (i) The timetable and phasing for construction of the drainage system (ii) Details of any control structure(s) (iii) Details of surface water storage structures (iv) Measures to control silt levels entering the system and out falling into any watercourse during the construction process. The removal of silt during operation should also be included. The development shall, in all respects, be carried out in accordance with the approved Management Plan. REASON: To ensure the development is supported by an appropriately designed surface water disposal infrastructure scheme and to minimise the risk of increased flooding and contamination of the system during the construction process.
6 In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and submitted to and approved in writing by the Local Planning Authority, and where remediation is necessary a remediation scheme must be prepared, which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. In order to minimise the environmental impact I would recommend the inclusion of the following conditions onto any planning permission which may be granted
7 Statement of Co-operative Working: The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 129 kb 01/12/2015
Consultee Responses
Consultee response - Environmental Protection (Contaminated Land) 15 kb 14/12/2015
Consultee response - Environment Agency 13 kb 23/12/2015
Consultee response - Environmental Protection (Nuisance) 12 kb 08/01/2016
Consultee response - Engineers (Drainage LLFA) 72 kb 04/03/2016
Decision
Decision Notice 47 kb 09/03/2016
Location Plan
Location Plan 1:5000 2345 kb 01/12/2015
Location Plan Ownership Boundary 1401 kb 01/12/2015
Location Plan (Red Line) 206 kb 01/12/2015
Plans
Proposed Profiles 85 kb 01/12/2015
Proposed Site Cross Section 142 kb 08/12/2015
Proposed General Arrangement 645 kb 08/12/2015
Supporting Documentation
Design and Access Statement 851 kb 30/11/2015
Grounds and Investigation Report 4042 kb 30/11/2015
Flood Risk Assessment 2081 kb 01/12/2015
Flood Risk Assessment Appendix D 3412 kb 01/12/2015
Flood Risk Assessment Appendix E 569 kb 01/12/2015
Flood Risk Assessment Appendix C 4820 kb 01/12/2015
Flood Risk Assessment Appendix A 478 kb 01/12/2015
Flood Risk Assessment Appendix B 2840 kb 01/12/2015
Flood Risk Assessment Appendix F 121 kb 01/12/2015
Application Documents
Public Notice 08 01 16 54 kb 12/01/2016
Consultee Name Date Letter Sent Consultation Expiry Date
Asset Management - Brian Masterton 10/12/2015 -
Asset Management - Chris Black 10/12/2015 -
Asset Management Team Fao Guy Allen 10/12/2015 -
Cleveland Police ALO - Steve Cranston 10/12/2015 -
Engineering Team (Highways) 10/12/2015 -
Environment Agency 10/12/2015 -
Environmental Protection Team 10/12/2015 -
Environmental Protection Team 10/12/2015 -
Executive Management Team 10/12/2015 -
Lyndsey Hall - SUDS Officer 10/12/2015 -
Place Investment Team 10/12/2015 -
Address Date Sent Date Reconsulted Expiry Date
7-9 DALARO COURT KIRKLEATHAM REDCAR TS10 5RT 10/12/2015 - 31/12/2015
REDCAR GARDEN MACHINERY AND PLANT HIRE TROISDORF WAY KIRKLEATHAM REDCAR TS10 5RX 10/12/2015 - 31/12/2015
BOB LITTLE AND CO LTD PROSPECT HOUSE TROISDORF WAY KIRKLEATHAM REDCAR TS10 5RX 10/12/2015 - 31/12/2015
PROVIDENT FINANCIAL PROSPECT HOUSE TROISDORF WAY KIRKLEATHAM REDCAR TS10 5RX 10/12/2015 - 31/12/2015
Site or Press Description Display Date Expiry Date
S SITE NOTICE ONLY 16/12/2015 06/01/2016
B ARTICLE 15 08/01/2016 29/01/2016