TEESPORT TEES DOCK ROAD GRANGETOWN
Proposal
OPERATIONAL WORKS - EXCAVATION OF AN EXISTING PIPE RUN INCLUDING SOIL AND REMEDIATION WORKS OF HISTORIC OIL SPILL
Application Type
Full
Status
Approved
Parish(es)
Applicant
MGT TEESSIDE LIMITED
Applicant's Address
1 BICKENHALL MANSIONS BICKENHALL STREET LONDON W1U 6BP
Agent
MGT TEESSIDE LIMITED
Agent's Address
1 BICKENHALL MANSIONS BICKENHALL STREET LONDON W1U 6BP
Agent's work phone
Agent's email
Case Officer
Mr D Pedlow
Case Officer Telephone
01287 612546
Case Officer Email
David.Pedlow@redcar-cleveland.gov.uk
Consultation Start
12/08/2015
Weekly List Expiry Date
-
Date Received
30/07/2015
Date Valid
30/07/2015
Expiry
24/09/2015
Consultation Expiry
07/09/2015
associated_bldreg
-
Decision
GRANT PLANNING PERMISSION
Decision Date
22/09/2015
Decision Level
Delegated

Conditions table
# Condition Details
1 The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 The development hereby permitted shall be carried out in accordance with the following approved plans: Drawing No 08/112A received by the Local Planning Authority on 30/07/15 Environmental Site Investigation and Risk Assessment received by the Local Planning Authority on 30/07/15 REASON: To accord with the terms of the planning application.
3 No occupation of any part of the permitted development shall take place until a verification report demonstrating completion of works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved, in writing, by the local planning authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met. It shall also include any plan (a "long-term monitoring and maintenance plan") for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action, as identified in the verification plan. The long-term monitoring and maintenance plan shall be implemented as approved. REASON: National Planning Policy Framework (NPPF) paragraph 109 states that the planning system should contribute to and enhance the natural and local environment by preventing both new and existing development from contributing to or being put at unacceptable risk from, or being adversely affected by unacceptable levels of water pollution. Government policy also states that planning policies and decisions should ensure that adequate site investigation information, prepared by a competent person, presented (NPPF, paragraph 121). Verification criteria have already been agreed as part of the neighbouring power station development.
4 If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until the developer has submitted a remediation strategy to the local planning authority detailing how this unsuspected contamination shall be dealt with and obtained written approval from the local planning authority. The remediation strategy shall be implemented as approved. REASON: National Planning Policy Framework (NPPF) paragraph 109 states that the planning system should contribute to and enhance the natural and local environment by preventing both new and existing development from contributing to or being put at unacceptable risk from, or being adversely affected by unacceptable levels of water pollution. Government policy also states that planning policies and decisions should ensure that adequate site investigation information, prepared by a competent person, is presented (NPPF, paragraph 121).
5 The Local Planning Authority considers that the application as originally submitted is a satisfactory scheme and therefore no negotiations have been necessary.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Form
Application Form 1008 kb 31/07/2015
Consultee Responses
Consultee response - Development Engineers 36 kb 13/08/2015
Consultee response - Environmental Protection (Nuisance) 12 kb 26/08/2015
Consultee response - Environmental Protection (Contaminated Land) 16 kb 26/08/2015
Consultee response - Environment Agency 27 kb 08/09/2015
Decision
Decision Notice 42 kb 22/09/2015
Location Plan
Location Plan 3802 kb 31/07/2015
Supporting Documentation
Environmental Site Investigation and Risk Assessment 1072 kb 31/07/2015
Planning Statement 215 kb 10/08/2015
Consultee Name Date Letter Sent Consultation Expiry Date
Engineering Team (Highways) 12/08/2015 -
Environment Agency 12/08/2015 -
Environmental Protection - M Gent 12/08/2015 -
Environmental Protection Team 12/08/2015 -
Health & Safety-Food 12/08/2015 -
Address Date Sent Date Reconsulted Expiry Date
WINCHESTER HOUSE 1 GREAT WINCHESTER STREET EC2N 2DB 12/08/2015 - 02/09/2015
26TH FLOOR PORTLAND HOUSE BRESSENDEN PLACE LONDON SW1E 5BG 12/08/2015 - 02/09/2015
17-27 QUEENS SQUARE MIDDLESBROUGH TS2 1AH 12/08/2015 - 02/09/2015
SABIC UK PETROCHEMICALS LTD TEESPORT TEES DOCK ROAD GRANGETOWN 12/08/2015 - 02/09/2015
Site or Press Description Display Date Expiry Date
S SITE NOTICE ONLY 17/08/2015 07/09/2015