R/2011/0101/FFM

Planning Application Details - Official Consultation has expired.

Location
SOUTH TEES ECO PARK, LAND OFF ESTON ROAD, GRANGETOWN, TS6 6UA
Proposal
RENEWAL OF EXTANT PERMISSION R/2007/0994/FFM FOR THE ERECTION OF WASTE AUTOCLAVE AND COMMUNITY RECYCLING FACILITIES; FOUR STOREY OFFICE ACCOMMODATION AND ASSOCIATED INFRASTRUCTURE
Application Type
Major Application
Status
Approved
Parish(es)
Applicant
GRAPHITE RESOURCES LIMITED
Applicant's Address
6 HIGHAM PLACE NEWCASTLE UPON TYNE TYNE & WEAR NE1 8AF
Agent
GRAPHITE RESOURCES LIMITED
Agent's Address
6 HIGHAM PLACE NEWCASTLE UPON TYNE TYNE & WEAR NE1 8AF
Agent's work phone
Agent's email
Case Officer
Mr P Robinson
Case Officer Telephone
-
Case Officer Email
-
Consultation Start
02/03/2011
Weekly List Expiry Date
-
Date Received
22/02/2011
Date Valid
22/02/2011
Expiry
24/05/2011
Consultation Expiry
28/03/2011
associated_bldreg
-
Decision
APPROVED
Decision Date
06/04/2011
Decision Level
Delegated

Conditions table
# Condition Details
1 (1) The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 (2) The development shall be carried out in accordance with the approved plans dated received 22/10/07 and the amended site layout plan received 04/01/08 (Drwg No 07036/03 Rev B) REASON: In order to comply with the terms of the application and to ensure development is carried out in accordance with the agreed details.
3 (3) The development shall comply with the following highways phasing works: (i) The development shall not be brought into use until the following highway works have been implemented to the satisfaction of the Local Planning Authority: • Eston Road / Western Access • Bolckow Estate / Staff Access (ii) The following works shall be completed within 2 years of the commencement of works for the development, to the satisfaction of the Local Planning Authority: • A66 / Cargo Fleet Lane • A66 / Middlesbrough Road (iii) The Tees Dock Road eastern access improvements shall be implemented to the satisfaction of the Local Planning Authority prior to the occupation of the separate anchor tenant (included as phase 3 in the application details). REASON: In order to ensure adequate access to the site for all users and in the interests of highway safety and the free flow of traffic.
4 (4) The development shall not be brought into use until the off-site highways works at the A66 / Tees Dock Road, A1085 / A1053 and A174 / A1053 junctions have been implemented to the satisfaction of the Local Planning Authority and the Highways Agency. REASON: In the interests of highway safety and the free flow of traffic.
5 (5) Prior to commencement of any development works on the site, (excluding site clearance) details of the proposed highway mitigation works as outlined in the submitted Transport Assessment shall be submitted to and approved in writing by the Local Planning Authority. The development shall be subject to a Stage 1 & 2 Road Safety Audit. The Audit shall be carried out in accordance with DMRB HD19/03 and shall be submitted to and approved in writing by the Local Planning Authority. REASON: In the interests of highway safety and the free flow of traffic.
6 (6) The above subsequently approved highway mitigation works shall completed to the satisfaction of the Local Planning Authority to the timescales outlined in conditions 3 & 4. The proposed works shall be subject to a Stage 3 (completion of construction) Road Safety Audit. The Audit shall be carried out in accordance with DMRB HD19 / 03 and shall be submitted to and approved in writing by the Local Planning Authority. REASON: In the interests of highway safety and the free flow of traffic.
7 (7) Prior to the occupation of the development approved a SustainableTravel Plan shall be submitted and approved in writing by the Local Planning Authority. The Plan shall include details of; measures to promote access to the site by sustainable transport means by both employees and visitors; objectives to achieve targeted modal split; mechanisms for monitoring of the effectivness of the plan and measures to be implemented where modal split targets are not achieved. The approved travel plan shall continue to operate so long as the development is occupied. REASON: To promote sustainable development and access to the site by sustainable means.
8 (8) Prior to the occupation of the development approved, secure cycle parking shall be provided for a minimum of 20 cycles within the site, the location and details of which shall be submitted to the Local Planning Authority and approved in writing. The development shall be completed in accordance with the approved details and maintained in like mannner. REASON: In order to ensure adequate cycle parking facilities are provided on site.
9 (9) All pedestrian and vehicular surfaces are to be sealed, surfaced and drained in accordance with details submitted to and approved in writing by the Local Planning Authority and the development completed and maintained in the approved manner. REASON: In the interests of highways safety.
10 (10) Prior to the commencement of the development hereby approved, details shall be submitted to and approved by the Local Planning Authority in writing, of proposals to provide the contractor car parking and the construction compound with in the site boundary for the duration of the works, the approved facilities shall be retained throughout the construction process unless otherwise agreed in writing with the Local Planning Authority. REASON: In the interests of highway safety and to ensure adequate provision is made on site for such acilities.
11 (11) Prior to the commencement of the development hereby approved, details shall be submitted to and approved by Local Planning Authority in writing, of proposals to prevent mud / debris from being deposited on the public highway for the duration of the construction process. REASON: In the interests of highway safety.
12 (12) Prior to the commencement of the development hereby approved, details shall be submitted to and approved by Local Planning Authority in writing, of a traffic management plan for the construction phase of the works.The development shall be completed in accordance with the approved plan unless otherwise agreed by the Local Planning Authority. REASON: In the interests of highway safety.
13 (13) Prior to the commencement of the development hereby approved, details of all external materials to be used on the proposed buildings and hard surfaces within the development shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in accordance with the approved details unless otherwise agreed in writing by the Local Planning Authority. REASON: In order to ensure a satisfactory appearance to the development.
14 (14) Any noise emitted from the development shall not contribute more than 3dB(A) to existing background noise levels, when measured at a distance of 1 metre from the façade of any adjacent dwelling and calculated as an Leq(A) of 10 minutes. REASON: In order to ensure no noise nuisance occurs in the interests of local amenity.
15 (15) Prior to the occupation of the development hereby approved, details of boundary treatment shall submitted to and approved in writing by the Local Planning Authority and the development carried out in accordance with the approved details. REASON: In the interests of local visual amenity.
16 (16) Prior to the commencement of the development hereby approved, details of shower and changing facilities within the development shall be submitted to and approved by the Local Planning Authority in writing and the development completed and maintined in the approved manner. REASON: In order to ensure adequate provision on site for such facilities in the interests of promoting sustainable development.
17 (17) Prior to the commencement of the development hereby approved details shall be submitted to and approved by the Local Planning Authority in writing, of a scheme of landscaping which shall include a survey of all existing trees and hedgerows on the land details of those to be retained and those to be removed, together with measures of protection of retnied trees and hedgerows in the course of the development. REASON: In order the secure appropriate landscaping to the site in the interests of local visual amenity and the secure the retention and protection, where appropriate, of exisitng trees and hedgerows.
18 (18) All planting, seeding or turfing comprised in the approved landscaping scheme shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever is sooner and any trees or plants which within a period of five years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. REASON: To ensure the satisfactory implementation of the approved scheme in the interests of the visual amenities of the locality.
19 (19) No development, including site clearance, shall take place within the application site until the applicant has secured the implementation of a programme of archaeological investigation in accordance with a written scheme which has been submitted to and approved in writing by the Local Planning Authority. REASON: The site is of archaeological interest and the condition is required to secure the investigation of the archaeological resource prior to construction operations.
20 (20) A minimum of 10% of the sites energy requirements shall be provided by embedded renewable energy, unless otherwise first agreed in writing with the Local Planning Authority. REASON: In order to ensure that the development complies with government objectives to generate 10% of energy from renewable sources and to comply with policy in the development plan.
21 (21) Prior to the commencement of the development hereby approved, details of a scheme to limit surface water run-off from the site shall been submitted to and approved in writing by the Local Planning Authority. The development shall be implemented in accordance with the approved details and maintained in the approved manner. REASON: To prevent the increased risk of flooding from surface water discharge.
22 (22) Prior to the commencement of the development hereby approved, details of the proposed Sustainable Urban Drainage System (SUDS) including a feasibility study and design methodology, shall be submitted to and approved in writing by the Local Planning Authority and the development completed in accordance with the approved details and maintained in the approved manner. REASON: In order to ensure adequate drainage on the site and to promote sustainable drainage provision as part of the development.
23 (23) Finshed floor levels shall be set at least 600mm above ordnance datum (AOD) REASON: To protect the development from flooding.
24 (24) There shall be no discharge of contaminated drainage from the site into either groundwater or any surface waters, whether direct or via soakaways. REASON: To prevent pollution of the water environment.
25 (25) All areas used for the washing of vehicles shall be contained and connected to foul sewers to prevent the discharge of contaminated drainage to underground strata or controlled waters. REASON: To prevent pollution of the water environment.
26 (26) No development approved by this permission shall be commenced until a scheme for the disposal of foul and surface waters has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented in accordance with the approved detailed and maintianed in the approved manner. REASON: To prevent pollution of the water environmenta and the ensure the development has adequate drainage infrastructure.
27 (27) Provision shall be made to ensure that no polluting discharge from haul roads and disturbed areas enter any watercourse. REASON: To prevent pollution of the water environment.
28 (28) Unless otherwise agreed by the Local Planning Authority in writing, development other than that required to be carried out as part of an approved scheme of remediation must not commence until parts (a) to (e) have been complied with. If unexpected contamination is found after development has begun, development must be halted on that part of the site affected by the unexpected contamination to the extent specified by the Local Planning Authority in writing until condition (e) has been complied with in relation to that contamination. (a) Site Characterisation An investigation and risk assessment, in addition to any assessment provided with the planning application, must be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme are subject to the approval in writing of the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to: • human health, • property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, • adjoining land, • groundwaters and surface waters, • ecological systems, • archeological sites and ancient monuments; (iii) an appraisal of remedial options, and proposal of the preferred option(s). This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’. (b) Submission of Remediation Scheme A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment must be prepared, and is subject to the approval in writing of the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (c) Implementation of Approved Remediation Scheme The approved remediation scheme must be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation, unless otherwise agreed in writing by the Local Planning Authority. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report (referred to in PPS23 as a validation report) that demonstrates the effectiveness of the remediation carried out must be produced, and is subject to the approval in writing of the Local Planning Authority. (d) Reporting of Unexpected Contamination In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of part (a) and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of part (b), which is subject to the approval in writing of the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority. (e) Long Term Monitoring and Maintenance A monitoring and maintenance scheme to include monitoring the long-term effectiveness of the proposed remediation over a period of 5 years, and the provision of reports on the same must be prepared, both of which are subject to the approval in writing of the Local Planning Authority. Following completion of the measures identified in that scheme and when the remediation objectives have been achieved, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be produced, and submitted to the Local Planning Authority. This must be conducted in accordance with DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’ REASON: The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection.
29 (29) Piling or any other foundation designs using penetrative methods will not be permitted other than with the express written consent of the Local Planning Authority. Consent will be given for those parts of the site where it has been demonstrated that there is no resultant unacceptable risk to groundwater. REASON: To protect controlled waters.
30 (30) The car parking spaces designated for car-sharers and disabled car users shall be provided and retained on-site in accordance with the details as set out in the submitted Travel Plan dated received 4th January 2008 unless otherwise approved in writing by the Local Planning Authority. REASON: In order to ensure compliance with the submitted Travel Plan measures for the site.
31 (31) Bat and bird boxes shall be erected at the site in accordance with the details contained in sections 13.5 and 13.7 of the ‘South Tees Eco-Park Non-Technical Summary’. REASON: In the interests of ecology and the promotion of biodiversity on the site.
32 (32) No demolition shall take place on site during the hibernation period for protected species. REASON: In the interests of ecology and to protect hiberbating species from disturbance.
33 (33) No development shall take place unless in accordance with the mitigation detailed within the protected species report ‘South Tees Eco-Park Non-Technical Summary’, including, but not restricted to, adherence to timing and spatial restrictions; provision of mitigation in advance; and, adherence to precautionary working methods. In addition, the existing building on the site shalll not be demolished until a checking survey has been carried out by an appropriately qualified person to confirm that no protected species are present. REASON: in the interests of protecting the ecology of the site.
34 (34) Notwithstanding the details shown on the approve drawings, the turning head between offices 1 and 2 shall be constructed so that turning legs of 16m in length are achieved. REASON: In the interests of highway safety.
35 REASON FOR DECISION: The site is within an area identified for industrial / warehousing purposes and the development is one that will provide a strategically important waste management facility which is set out as an objective under planning policy CS9(4) of the adopted LDF Core Strategy.The application was previously supported by an Environmental Assessment under the EIA Regulations which fully assessed the impact of the development on the environment and identified appropriate mitigation measures, along with other supporting information. This assessment remains valid and it is the view of the Local Planning Authority that there has been no material change in circumstances that indicate any supplementary information is required to inform the decision on this application.The design and siting of the development takes account of the principles set out in the Council’s supplementary planning guidance and planning policies adopted since the orginal application and it is considered the proposal accords with the Council’s adopted Development Plan.
36 NOTE: The following Development Plan Policies were relevant to this decision: Local Development Framework Policies CS1, CS2, CS3, CS4, CS8,CS9, CS20, CS24, CS26, DP1,DP2, DP3, DP4, DP6 & DP7.
37 INFORMATIVES 1.The Council has been advised that power to supply adjacent Corus sites is derived through the application site. It is recommended that the applicant should contact Corus Estates to discuss this matter further. 2. The Environment Agency have advised that surface water drainage from this site is required to be regulated so as not to exacerbate flooding problems downstream within the catchment. The discharge should be regulated to the greenfield run-off from a 1 in 1 year storm and sufficient storage at least to accommodate a 1 in 30 year storm. The design should also ensure that storm water resulting from a 1 in 100 year event and surcharging the drainage system can be stored on the site without risk to people or property and without overflowing into the watercourse. 3.The Environment Agency also encourage the use of SUDS where it is deemed appropriate. Guidance on the use of SUDS and appropriate levels of treatment is available from CIRIA. 4. Any activities involving the storage, treatment or disposal of waste may require a Waste Management Licence or a PPC permit. The applicant is advised to contact the Environment Agency at their earliest convenience to apply for any necessary permits. 5. Natural England have requested the developer take note of the following advice: •The applicant should be aware that planning permission does not remove the requirement to comply with the relevant law, including obtaining and complying with the terms and conditions of any licences required as described in Part IV B of ODPM Circular 06/2005 Biodiversity and Geological Conservation. •The developer may need to obtain a Natural England licence prior to the commencement of works. The developer should be advised by their ecologist with respect to this issue. • A demolition method statement should be written and passed to contractors working on the site on the demolition and construction phases of the development, in order to ensure the safety and habitat of protected species.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Decision
Decision Notice 54 kb 21/01/2014
Application Documents
Application Form.pdf 266 kb 02/03/2011
Address Date Sent Date Reconsulted Expiry Date
CORUS UK LTD STEEL HOUSE TRUNK ROAD REDCAR TS10 5QW 02/03/2011 - 23/03/2011
COLLEGE TRAILERS KINGSWAY HOLDEN CLOSE GRANGETOWN TS6 7AH 02/03/2011 - 23/03/2011
JWS RECYCLING SKIP HIRE HOLDEN CLOSE GRANGETOWN TS6 7AH 02/03/2011 - 23/03/2011
T N KELLY HAULAGE WEST LANE GRANGETOWN TS6 7AA 02/03/2011 - 23/03/2011
STAPYLTON JOINERY SERVICES 1D VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
1B VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
P & H SNACK DIRECT 1C VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
BULMER LOGISTICS (TEESSIDE) LTD MIDDLESBROUGH ROAD EAST MIDDLESBROUGH TS6 6TZ 02/03/2011 - 23/03/2011
THE OLD FIRE STATION MIDDLESBROUGH ROAD EAST GRANGETOWN MIDDLESBROUGH TS6 6TZ 02/03/2011 - 23/03/2011
UK RESOURCE MANAGEMENT HOLDEN CLOSE GRANGETOWN MIDDLESBROUGH TS6 7AL 02/03/2011 - 23/03/2011
CORUS RESEARCH DEVELOPMENT AND TECHNOLOGY TEESSIDE TECHNOLOGY CENTRE ESTON ROAD GRANGETOWN TS6 6UA 02/03/2011 - 23/03/2011
DAVID FOX TRANSPORT 1A BOLCKOW ROAD GRANGETOWN MIDDLESBROUGH TS6 7BN 02/03/2011 - 23/03/2011
12 ELGIN AVENUE GRANGETOWN MIDDLESBROUGH TS6 6TP 02/03/2011 - 23/03/2011
THE COTTAGE ELGIN AVENUE GRANGETOWN MIDDLESBROUGH TS6 6TP 02/03/2011 - 23/03/2011
FIXINGS TYNE TEES BURN ROAD HARTLEPOOL TS25 1PL 02/03/2011 - 23/03/2011
BRITANNIA SECURITY SOLUTIONS 5 TELFORD ROAD MIDDLESBROUGH TS3 8BL 02/03/2011 - 23/03/2011
PROGRESSIVE ENERGY LTD SWAN HOUSE BONDS MILL STONEHOUSE GLOUCESTERSHIRE GL10 3R 02/03/2011 - 23/03/2011
JARVIS ACCOMMODATION SERVICES THE INNOVATION CENTRE VIENNA COURT KIRKLEATHAM BUSINESS PARK REDCAR TS10 5SH 02/03/2011 - 23/03/2011
J P M TAXIS WEST LANE GRANGETOWN MIDDLESBROUGH TS6 7AA 02/03/2011 - 23/03/2011
BOLCKOW TYRES WEST LANE GRANGETOWN MIDDLESBROUGH TS6 7AA 02/03/2011 - 23/03/2011
KELLYS HAULAGE WEST LANE GRANGETOWN MIDDLESBROUGH TS6 7AA 02/03/2011 - 23/03/2011
ST. MARYS RC INFANT & JUNIOR SCHOOL TENNYSON AVENUE GRANGETOWN MIDDLESBROUGH TS6 7AD 02/03/2011 - 23/03/2011
NORTH EAST COUNTIES FIRE WEST LANE GRANGETOWN MIDDLESBROUGH TS6 7AA 02/03/2011 - 23/03/2011
CARGO PALLETS WEST LANE GRANGETOWN MIDDLESBROUGH TS6 7AA 02/03/2011 - 23/03/2011
ADULT TRAINING CENTRE WEST LANE GRANGETOWN MIDDLESBROUGH TS6 7AA 02/03/2011 - 23/03/2011
JOHN LANE CAR REPAIRS THE GARAGE WEST LANE GRANGETOWN MIDDLESBROUGH TS6 7AA 02/03/2011 - 23/03/2011
SIGNET JOINERY LAING CLOSE GRANGETOWN MIDDLESBROUGH TS6 7EA 02/03/2011 - 23/03/2011
P B S CONSTRUCTION (NORTH EAST) LTD LAING CLOSE GRANGETOWN MIDDLESBROUGH TS6 7EA 02/03/2011 - 23/03/2011
RINNEN UK LTD LAING CLOSE GRANGETOWN MIDDLESBROUGH TS6 7EA 02/03/2011 - 23/03/2011
STAPYLTON JOINERY SERVICES 1D VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
DOUBLEBLAZE LTD 2B VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
COACH & COACHABILITY LTD 2C VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
2A VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
C & M ELECTRICAL 2F VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
1B VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
P & H SNACK DIRECT 1C VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
UNIT 5 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 02/03/2011 - 23/03/2011
UNIT 4 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 02/03/2011 - 23/03/2011
D & A SYSTEMS UNIT 6 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 02/03/2011 - 23/03/2011
CITY ELECTRICAL FACTORS LTD UNIT 7-9 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 02/03/2011 - 23/03/2011
UNIT 8 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 02/03/2011 - 23/03/2011
UNIT 1-3 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 02/03/2011 - 23/03/2011
DAVE CLARK MOTORS UNIT 10-11 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 02/03/2011 - 23/03/2011
MASTER RADIATORS UNIT 12 STAPYLTON COURT GRANGETOWN MIDDLESBROUGH TS6 7BL 02/03/2011 - 23/03/2011
M C CONSTRUCTION 2D VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
B & W LIFTING 2E VAUGHAN COURT STAPYLTON STREET GRANGETOWN MIDDLESBROUGH TS6 7BJ 02/03/2011 - 23/03/2011
TRUCK TECH POCHIN ROAD GRANGETOWN MIDDLESBROUGH TS6 7AT 02/03/2011 - 23/03/2011
SHAW LIFTING CO LTD 22 POCHIN ROAD GRANGETOWN MIDDLESBROUGH TS6 7AT 02/03/2011 - 23/03/2011
1 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
MILLER HOUSE POCHIN ROAD GRANGETOWN MIDDLESBROUGH TS6 7AT 02/03/2011 - 23/03/2011
15-16 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
9 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
L A SERVICES 5-6 GRANGETOWN BESSEMER COURT MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
7 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
WARDEN CALL MAINTENANCE LTD 2 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
AQUAPROOF ROOFING SYSTEMS LTD 22 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
DUCKWORTH NEIL ENGINEERING UNIT 24 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
10 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
3 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
19-20 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
ELITE SHOPFITTERS LTD 13-14 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
23 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
KINGSMAN TECHNICAL SERVICES LTD 11-12 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
WROUGHT IRONWORK 24 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
BESSEMER CAFE 17 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
SWALES TRANSPORT 18 BESSEMER COURT GRANGETOWN MIDDLESBROUGH TS6 7EB 02/03/2011 - 23/03/2011
MIDDLESBROUGH ROAD EAST GRANGETOWN MIDDLESBROUGH TS6 6TZ 02/03/2011 - 23/03/2011
MIDDLESBROUGH ROAD EAST GRANGETOWN MIDDLESBROUGH TS6 6TZ 02/03/2011 - 23/03/2011
MIDDLESBROUGH ROAD EAST GRANGETOWN MIDDLESBROUGH TS6 6TZ 02/03/2011 - 23/03/2011
BURN ROAD HARTLEPOOL TS25 1PL 02/03/2011 - 23/03/2011
Site or Press Description Display Date Expiry Date
B ARTICLE 15 04/03/2011 25/03/2011
S ARTICLE 15 07/03/2011 28/03/2011