Location
LAND AT TEESPORT, TEES DOCK ROAD, GRANGETOWN
Proposal
CONSENT TO CONSTRUCT AND OPERATE AN ELECTRICITY GENERATING STATION PURSUANT TO S36 OF THE ELECTRICITY ACT 1989 AND DEEMED PLANNING PERMISSION PURSUANT TO TOWN & COUNTRY PLANNING ACT 1990.
ISSUED TO MGT TEESSIDE LIMITED
ORIGINAL DATED: 15 JULY 2009 (R/2011/0181/CL)
EXTENSION DATED 9 MARCH 2010 (01....
Application Type
Condition Discharge
Status
Approved
Parish(es)
Applicant
MGT TEESIDE LIMITED
Applicant's Address
16 OLD QUEEN STREET
LONDON
SW1H 9HP
Agent
MGT TEESIDE LIMITED
Agent's Address
16 OLD QUEEN STREET
LONDON
SW1H 9HP
Agent's work phone
Agent's email
Case Officer
-
Case Officer Telephone
-
Case Officer Email
-
Consultation Start
-
Weekly List Expiry Date
-
Date Received
27/06/2012
Date Valid
27/06/2012
Expiry
22/08/2012
Consultation Expiry
-
associated_bldreg
-
Decision
CONDITION DISCHARGE GRANTED
Decision Date
29/06/2012
Decision Level
-
| # | Condition Details |
|---|---|
| 1 | The commencement of the Development shall not take place until a scheme to deal with the risks associated with contamination of the Site has been submitted to, approved in writing by, and deposited with the Council. The scheme shall include details of the following matters: (a) a desk study identifying all previous uses potential contaminants associated with those uses a conceptual model of the Site indicating sources, pathways and receptors potentially unacceptable risks arising from contamination at the Site; (b) a Site investigation scheme based on (a) to provide information for an assessment of the risk to all receptors that may be affected, including those off Site; and (c ) the results of the Site investigation and risk assessment pursuant to (b) and a method statement based on those results giving full details of the remediation measures required and how they are to be undertaken. |
| 2 | The measures approved pursuant to Condition (35) shall be adhered to during the construction of the Development. unless any variation has been approved in writing by the Council in consultation with the Environment Agency. |
| 3 | If. during construction of the Development, Contamination not previously identified is found to be present at the Site then no further work shall be carried out until there has been submitted to, approved in writing by. and deposited with. the Council an amendment of the method statement approved pursuant to Condition (35) detailing how this unsuspected contamination shall be dealt with. |
| 4 | Contaminated material arising from the construction of the Development shall be treated on the Site in accordance with a scheme to be submitted to. approved in writing by. and deposited with, the Council. in consultation with the Environment Agency. or shall be disposed of to licensed disposal facilities. |
| 5 | Prior to the commissioning of the Development the Company shall provide a verification report on completion of the works set out in Condition (35)(c) confirming the remediation measures that have been undertaken in accordance with the method statement and setting out measures for maintenance. further monitoring and reporting. |
| 6 | The commencement of the Development shall not take place until there has been submitted to, approved in writing by, and deposited with the Council a scheme for the provision of wheel cleansing facilities for heavy commercial vehicles and any other vehicle which has an operating weight exceeding three tonnes. Such approved facilities shall be installed in accordance with a timescale to be approved in writing by the Council and shall be maintained throughout the period of the construction of the Development unless any variation has been approved in writing by the Council. |
| 7 | The demolition of existing buildings and structures on the site shall not take place until there has been submitted to, approved in writing by, and deposited with the Council a scheme employing the best practicable means for the suppresion of dust during the period of demolition of existing buildings and structures on the site and the construction of the Development. the measures approved in the sceheme shall be employed throughout the period of construction unless any variation has been approved in writing by the Council. |
| 8 | The commencement of the Development shall not take place until there has been submitted to, approved in writing by, and deposited with the Council a scheme which shall including provisions for the: i) details of the siting, design, external appearance of temporary buildings and structures, artifical lighting and fencing to be erected and used during the period of construction of the Development ii) details of temporary vehicular circulation roads, parking, hardstandings, laydown areas, loading and unloading facilities and turning facilities during the construction of the Development iii) phasing of works included in the scheme. Reason: to enable the Council to exercise reasonable and proper control over the temporary works associated with the Development. |
| 9 | The commencement of the main development shall not take place until there has been submitted to, approved in writing by, and deposited with the Council a scheme which shall including provisions for the: i) details of siting, design, dimensions, external appearance and floor levels of all buildings and structures which are to be retained following the completion of the construction of the development. ii) details of the colour, materials and surface finishes in respect of those buildings and structures referred to in i) above. iii) details of vehicular circulation roads, parking, hardstandings, loading and unloading facilities and turning facilities on the site iv) details of artificial lighting required during the operation of the development v) details of all new or modified permanent fencing and gates required on the site vi) details of any proposed landscaping on the site vii) details of fire suppression measures and access of sire appliances to all major buildings, structures and storage areas; and viii) phasing of works included in the scheme. |
| 10 | The commencement of the Development shall not take place until there has been submitted to, approved in writing by and deposited with the Council a scheme for the monitoring of noise generated during the demolition of existing buildings and structures on the site and construction of the Development. |
| 11 | The commencement of the Development shall not take place until there has been submitted to, approved in writing by and deposited with the Council a scheme for impact pile, or other means of pile driving, including methods and duration and shall state the selection criteria. The approved scheme shall be adhered to during the period of construction of the Development. |
| 12 | The commencement of the Development shall not take place until there has been submitted to, approved in writing by, and deposited with the Council, in consultation with the Environment Agency, a scheme showing the method and working of drainage facilities on the site. Such facilities shall be put in place in accordance with the approved scheme. |
| 13 | The scheme referred to in Condition 23 shall include: i) measures to ensure that no leachate or any contaminated surface water from the Site shall be allowed at any time to enter directly or indirectly into any watercourse or underground strata or onto adjoining land; ii) provision so as to ensure that all existing drainage systems continue to operate and that riparian owners upstream and downstream of the site are not adversely affected; iii) provision for trapped gullies in car parks, hardstandings and roadways; iv) measures to ensure that all foul sewage must drain to an approved foul sewerage and/or sewage disposal system; v) provisions to distinguish between temporary and permanent parts of the works; and vi) phasing of works. |
| 14 | The commencement of the Development shall not take place unless in accordance with the findings and recommendations of the Tees Flood Risk Assessment (Appendix D of the submitted Environmental Statement July 2008.) |
| 15 | The commencement of the Development shall not take place until a flood warning and evacuation plan has been submitted to, approved in writing by, and deposited with, the Council. The plan shall include details of how flood warnings will be obtained and disseminated throughout the site and the action to be taken. The plan shall be operated throughout the lifetime of the Development. |
| 16 | The commencement of the Development shall not take place until a traffic management plan for the construction phase of the Development, to include details of the site access, the Company has been submitted, approved in writing by, and deposited with the Council, in consultation with the Highways Agency. |
| 17 | The commencement of the Development shall not take place until there has been submitted to, approved in writing by, and deposited with the Council, a scheme for archaeological investigation and an associated implementation programme. |
| 18 | Any further investigations and recording of such finds as are considered necessary by the Council shall be undertaken prior to the construction of any part of the Development on that part of the site where such finds are identifed and in the case of finds of national importance in accordance with the phasing of works approved pursuant to Condition 33(iii) unless otherwise approved in writing by the Council |
| 19 | The scheme approved pursuant to Condition 32 shall provide for: i) any person nominated by the Council to be permitted safe access to the part of the site where the find is made; ii) finds of national importance to be evaluated and where practicable preserved in situ; and iii) phasing of works. |
| 20 | The commencement of the Development shall not take place until the Company has undertaken, in consultation with Natural England a comprehensive investigation to establish whether birds are present on site. Should the investigation indicate that birds are present on the Site then the Company shall submit a scheme of mitigation measures for approval in writing by the Council in consultation with Natural England. |
| 21 | The commencement of the development shall not take place until there has been submitted to, approved in writing by and deposited with the Council a scheme for transporting those involved in the construction and operation of the development by means other than by single passenger car occupancy. The approved scheme shall be adhered to throughout the period of construction and operation of the development unless otherwise agreed in writing by the Council. |
| 22 | The commencement of the development shall not take place until the company has submitted to the Council the main findings and conclusions of an investigation as to whether an existing waterway and/or railway could be utilised to provide a practical, economical and environmentally advantageous (when compared and contrasted with road transportation) means of transportation to the Site of construction materials associated with the development. The results of the investigation shall be submitted to, agreed in writing by, and deposited with the Council. |
| 23 | In the event that the investigation referred to in Condition (43) identifies that an existing waterway and/or railway could be utilised to provide a practical, economical and environmentally advantageous (when compared and contrasted with road transportation) means of transportation, the development shall not commence until there has been submitted to, approved in writing by, and deposited with the Council a scheme for the transportation by waterway and /or railway of construction materials. |