R/2007/0936/FF

Planning Application Details - Official Consultation has expired.

Location
MATERIALS RECLAMATION FACILITY, TOD POINT ROAD, WARRENBY, TS105BE
Proposal
ERECTION OF BUILDING FOR EXISTING WASTE TRANSFER STATION
Application Type
Full
Status
Approved
Parish(es)
Applicant
J & B FUELS LTD
Applicant's Address
BALTIC STREET HARTLEPOOL TS251PS
Agent
J & B FUELS LTD
Agent's Address
BALTIC STREET HARTLEPOOL TS251PS
Agent's work phone
Agent's email
Case Officer
Mr G Dyball
Case Officer Telephone
Case Officer Email
Grahame_Dyball@redcar-cleveland.gov.uk
Consultation Start
15/10/2007
Weekly List Expiry Date
-
Date Received
20/09/2007
Date Valid
12/10/2007
Expiry
07/12/2007
Consultation Expiry
09/11/2007
associated_bldreg
-
Decision
APPROVED
Decision Date
06/12/2007
Decision Level
Delegated

Conditions table
# Condition Details
1 (1) The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 (2) This permission relates only to the amended plan(s) received by the Local Planning Authority on 06/12/2007. REASON: For the avoidance of doubt.
3 (3) Details of materials to be used on the external elevations of the development shall be submitted to and agreed in writing by the Local Planning Authority prior to the development being commenced. REASON: To ensure the use of satisfactory materials.
4 (4) No development approved by this permission shall be commenced until:- (a) The application site has been subjected to a detailed scheme for the investigation and recording of contamination including soil contamination, ground/surface water contamination, landfill gas, leachates and stability as appropriate; (b) Detailed proposals for the removal, containment or otherwise rendering harmless any contamination (the 'Reclamation Method Statement') have been determined through risk assessment and approved in writing by the Local Planning Authority; (c) The works specified in the Reclamation Method Statement have been completed in accordance with the approved scheme; Any contamination not considered in the Reclamation Method Statement but identified during the reclamation works should be subject to further risk assessment and remediation proposals agreed with the Local Planning Authority. A report demonstrating that the works were carried out in accordance with the approved scheme (the 'Validation Report') should be submitted to the Local Planning Authority within 2 months of completion of the development. REASON: The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection.
5 (5) No development approved by this permission shall be commenced until a scheme for the provision of surface water drainage works has been submitted to and approved in writing by the Local Planning Authority. The drainage works shall be completed in accordance with details and timetable agreed. REASON: To prevent the increase risk of flooding by ensuring the provision of a satisfactory means of surface water disposal.
6 (6) Development shall not commence until details of a safe exit route, not adversely affecting the flood regime, to land outside the 1 in 200 flood plain, are submitted to and agreed in writing by the Local Planning Authority. This route must be in place before any occupancy of the building(s). REASON: To provide safe access and egress during flood events and reduce reliance on emergency services.
7 (7) Flood sensitive equipment shall be set no lower than 5.185m AOD. REASON: To reduce the risk of flood damage.
8 (8) Development shall not commence until details of an emergency evacuation plan has been submitted to and agreed in writing by emergency planning authority. REASON: To provide safe access and egress during flood events and reduce reliance on emergency.
9 NOTE: The following development plan policies were relevant to this decision:- Local Development Framework Policy - CS5, CS9, CS11, CS20, DP1, DP2, DP3, DP6 and DP7 and IND3 of the Redcar and Cleveland Local Plan.
10 REASON FOR DECISION: The site is within an area identified for industrial/warehousing purposes. The design and siting of the development takes account of the principles set out in the Council’s supplementary planning guidance. The proposal therefore accords with the Council’s adopted Development Plan.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Documents
Design And Access Statement.pdf 23 kb 16/10/2007
Planning Statement.pdf 166 kb 16/10/2007
Location Plan.pdf 515 kb 16/10/2007
Block Plan-SUPERCEDED.pdf 446 kb 16/10/2007
Application Form.pdf 187 kb 16/10/2007
Proposed Plans And Elevations.pdf 93 kb 16/10/2007
Supporting Statement.pdf 39 kb 17/10/2007
Amended Block Plan 06 12 2007.pdf 849 kb 06/12/2007
Consultee Name Date Letter Sent Consultation Expiry Date
Northumbrian Water Ltd 15/10/2007 -
Address Date Sent Date Reconsulted Expiry Date
TOD POINT ROAD WARRENBY REDCAR TS10 5BA 19/10/2007 - 09/11/2007
UNIT 1 TEAL COURT TOD POINT ROAD WARRENBY REDCAR TS10 5AX 19/10/2007 - 09/11/2007
UNIT 2 - 4 TEAL COURT TOD POINT ROAD WARRENBY REDCAR TS10 5AX 19/10/2007 - 09/11/2007
Site or Press Description Display Date Expiry Date
S SITE NOTICE ONLY 15/10/2007 05/11/2007