R/2006/0077/FF

Planning Application Details - Official Consultation has expired.

Location
FORMER FREIGHTLINER SITE (PART), WILTON INTERNATIONAL, MIDDLESBROUGH, TS908WS
Proposal
ERECTION OF NEW BUILDING, PORTABLE MESS ROOM AND WOOD FUEL TESTING FACILITY
Application Type
Full
Status
Approved
Parish(es)
Applicant
SEMBCORP UTILITIES (UK)
Applicant's Address
WILTON 10 PROJECT SEMBCORP HQ PO BOX 1985 WILTON INTERNATIONAL MIDDLESBROUGH TS908WS
Agent
A L P AMBROSE MINERALS PLANNING & DEVELOPMENT
Agent's Address
HIGHWAY HOUSE ASFARE BUSINESS PARK HINCKLEY ROAD WOLVEY LE103HQ
Agent's work phone
Agent's email
Case Officer
Mrs D Mealing
Case Officer Telephone
Case Officer Email
Doreen.Mealing@redcar-cleveland.gov.uk
Consultation Start
03/02/2006
Weekly List Expiry Date
-
Date Received
24/01/2006
Date Valid
24/01/2006
Expiry
21/03/2006
Consultation Expiry
24/02/2006
associated_bldreg
-
Decision
APPROVED
Decision Date
23/03/2006
Decision Level
Delegated

Conditions table
# Condition Details
1 (1) The development shall not be begun later than the expiration of THREE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 (2) Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hardstandings shall be passed through an oil interceptor installed in accordance with a scheme previously submitted to and approved in writing by the Local Planning Authority. Roof water shall not pass through the interceptor. REASON: To prevent pollution of the water environment.
3 (3) Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. REASON: To prevent pollution of the water environment.
4 (4) If during development, contamination not previously identified, is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the applicant has submitted, and obtained written approval from the Local Planning Authority for, an addendum to the Method Statement. This addendum must detail how this unsuspected contamination shall be dealt with. REASON: To ensure that the development complies with the approved details in the interests of protection of Controlled Waters.
5 (5) Upon completion of the remediation detailed in the Method Statement a report shall be submitted to the Local Planning Authority that provides verification that the required works regarding contamination have been carried out in accordance with the approved method statement(s). Post remediation sampling and monitoring results shall be included in the report to demonstrate that the required remediation has been fully met. Future monitoring proposals and reporting shall also be detailed in the report. REASON: To protect Controlled Waters by ensuring that the remediated site has been reclaimed to an appropriate standard.
6 (6) The development of the site should be carried out in accordance with the approved Method Statement. REASON: To ensure that the development complies with approved details in the interests of protection of Controlled Waters.
7 (7) This permission relates to the plans received by the Local Planning Authority on 3 March 2006. REASON: For the avoidance of doubt.
8 (8) Before the building hereby approved is brought into use, details of a staff travel plan, including the provision of appropriate on-site facilities, shall be agreed with the Local Planning Authority. REASON: To ensure a satisfactory form of development.
9 NOTE: Redcar and Cleveland Local Plan Policies GEN1, GEN2 and IND1 were relevant to this decision.
10 REASON FOR DECISION: The site is within an area identified for industrial/warehousing purposes. The design and siting of the development takes account of the principles set out in the supplementary guidance in the Local Plan. The proposal therefore accords with the Council's adopted Local Plan.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Application Documents
R_2006_0077_FF-A.pdf 185 kb 27/01/2006
R_2006_0077_FF-P1.pdf 1108 kb 27/01/2006
R_2006_0077_FF-P2.pdf 85 kb 27/01/2006
R_2006_0077_FF-P3.pdf 20 kb 27/01/2006
R_2006_0077_FF-P4.pdf 209 kb 27/01/2006
R_2006_0077_FF-P5.pdf 154 kb 27/01/2006
R_2006_0077_FF-P6.pdf 181 kb 27/01/2006
R_2006_0077_FF-P7.pdf 94 kb 27/01/2006
Consultee Name Date Letter Sent Consultation Expiry Date
Housing & Health Services 26/01/2006 -
Northumbrian Water Ltd 26/01/2006 -
Technical Services (Regulatory) 26/01/2006 -
Site or Press Description Display Date Expiry Date
B ARTICLE 15 03/02/2006 24/02/2006