Location
FORMER STOCKTON HAULAGE SITE, METCALFE ROAD, SOUTH BANK
Proposal
OUTLINE APPLICATION FOR INDUSTRIAL UNITS
Application Type
Outline
Status
Approved
Parish(es)
Eston
Applicant
MR S DAVIES
Applicant's Address
9 PHILLIPS AVENUE
LINTHORPE
MIDDLESBROUGH
Agent
SEAN McLEAN DESIGN
Agent's Address
25 ST AIDANS CRESCENT
BILLINGHAM
TS225AD
Agent's work phone
Agent's email
Case Officer
Mr G Dyball
Case Officer Telephone
Case Officer Email
Grahame_Dyball@redcar-cleveland.gov.uk
Consultation Start
24/10/2005
Weekly List Expiry Date
-
Date Received
13/10/2005
Date Valid
13/10/2005
Expiry
08/12/2005
Consultation Expiry
17/11/2005
associated_bldreg
-
Decision
OUTLINE PERMISSION GRANTED
Decision Date
22/11/2005
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | (1) Application for approval of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission. The development hereby permitted shall be begun not later than the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved REASON: To reserve the rights of the Local Planning Authority with regard to these matters. |
| 2 | (2) Approval of the details of the siting, design, and external appearance of the building and the landscaping of the site (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority before the expiration of three years from the date of this permission. REASON: To reserve the rights of the Local Planning Authority with regard to these matters. |
| 3 | (3) No development approved by this permission shall be commenced until:- (a) The application site has been subjected to a detailed scheme for the investigation and recording of contamination including soil contamination, ground/surface water contamination, landfill gas, leachates and stability as appropriate; (b) Detailed proposals for the removal, containment or otherwise rendering harmless any contamination (the 'Reclamation Method Statement') have been determined through risk assessment and approved in writing by the Local Planning Authority; (c) The works specified in the Reclamation Method Statement have been completed in accordance with the approved scheme; Any contamination not considered in the Reclamation Method Statement but identified during the reclamation works should be subject to further risk assessment and remediation proposals agreed with the Local Planning Authority. A report demonstrating that the works were carried out in accordance with the approved scheme (the 'Validation Report') should be submitted to the Local Planning Authority within 2 months of completion of the development. REASON: The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection. |
| 4 | (4) Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. REASON: To prevent pollution of the water environment. |
| 5 | (5) Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hard-standings shall be passed through an oil interceptor installed in accordance with a scheme previously submitted to and approved in writing by the Local Planning Authority. Roof water shall not pass through the interceptor. REASON: To prevent pollution of the water environment. |
| 6 | (6) Roof drainage downwater pipes shall at all times be sealed at ground level to prevent the ingress of any contaminated water / run-off. REASON: To prevent pollution of the water environment. |
| 7 | (7) Prior to the commencement of any works on site, a settlement facility for the removal of suspended solids from surface water run-off during construction works shall be provided in accordance with details previously submitted to and approved by the Local Planning Authority. The approved scheme shall be retained throughout the construction period. REASON: To prevent pollution of the water environment. |
| 8 | REASON FOR DECISION: The site is within an area identified for industrial/warehousing purposes. The design and siting of the development takes account of the principles set out in the supplementary guidance in the Local Plan. The proposal therefore accords with the Council's adopted Local Plan. |
| 9 | NOTE: Redcar and Cleveland Local Plan Policies GEN1, GEN2 and IND4 were relevant to this decision. |
If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.
To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.
| Select all | Size | Date uploaded | |
|---|---|---|---|
| Decision | |||
| Decision Notice | 197 kb | 02/04/2015 | |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Housing & Health Services | 20/10/2005 | - |
| Northumbrian Water Ltd | 20/10/2005 | - |
| Planning and Regeneration Programme | 28/10/2005 | - |
| Technical Services (Regulatory) | 20/10/2005 | - |
| Address | Date Sent | Date Reconsulted | Expiry Date |
|---|---|---|---|
| HODGSON ENGINEERING LTD 8-9 METCALFE ROAD SKIPPERS LANE INDUSTRIAL ESTATE MIDDLESBROUGH TS6 6PT | 24/10/2005 | - | 14/11/2005 |
| 3 METCALFE ROAD SKIPPERS LANE INDUSTRIAL ESTATE MIDDLESBROUGH TS6 6PT | 24/10/2005 | - | 14/11/2005 |
| 1 METCALFE ROAD SKIPPERS LANE INDUSTRIAL ESTATE MIDDLESBROUGH TS6 6PT | 24/10/2005 | - | 14/11/2005 |
| 4 METCALFE ROAD SKIPPERS LANE INDUSTRIAL ESTATE MIDDLESBROUGH TS6 6PT | 24/10/2005 | - | 14/11/2005 |
| 2 METCALFE ROAD SKIPPERS LANE INDUSTRIAL ESTATE MIDDLESBROUGH TS6 6PT | 24/10/2005 | - | 14/11/2005 |
| METCALFE ROAD SOUTH BANK | 24/10/2005 | - | 14/11/2005 |
| METCALFE ROAD SOUTH BANK | 24/10/2005 | - | 14/11/2005 |
| Site or Press | Description | Display Date | Expiry Date |
|---|---|---|---|
| S | SITE NOTICE ONLY | 27/10/2005 | 17/11/2005 |