R/2005/0523/FF

Planning Application Details - Official Consultation has expired.

Location
TOD POINT ROAD, WARRENBY
Proposal
USE OF SITE AS A WASTE TRANSFER STATION INCLUDING ERECTION OF BUILDING
Application Type
Full
Status
Approved
Parish(es)
Applicant
MR KEITH RUTHERFORD
Applicant's Address
1ST CHOICE SKIPS TOD POINT ROAD WARRENBY REDCAR
Agent
G R HENDERSON ARCHITECTURAL DESIGN
Agent's Address
' 20 CONWAY ROAD ' REDCAR TS10 2EN
Agent's work phone
01642 276840
Agent's email
grhend@ntlworld.com
Case Officer
Mr G Dyball
Case Officer Telephone
Case Officer Email
Grahame_Dyball@redcar-cleveland.gov.uk
Consultation Start
23/05/2005
Weekly List Expiry Date
-
Date Received
16/05/2005
Date Valid
16/05/2005
Expiry
11/07/2005
Consultation Expiry
17/06/2005
associated_bldreg
-
Decision
APPROVED
Decision Date
29/06/2005
Decision Level
Delegated

Conditions table
# Condition Details
1 (1) The development shall not be begun later than the expiration of FIVE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 (2) Details of materials to be used on the external elevations of the development shall be submitted to and agreed in writing by the Local Planning Authority prior to the development being commenced. REASON: To ensure the use of satisfactory materials.
3 (3) There shall be no burning of waste on the site. REASON: In the interests of the amenities of the locality.
4 (4) No development shall be commenced until a scheme for the disposal of drainage has been submitted to and approved in writing by the Local Planning Authority. Thereafter no part of the development shall be occupied or brought into use until the approved scheme has been fully implemented. The scheme shall be retained throughout the life of the development unless otherwise agreed in writing by the Local Planning Authority. REASON: To prevent pollution of the water environment.
5 (5) Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be lcoated within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground an dprotected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. REASON: To prevent pollution of the water environment.
6 (6) Prior to the commencement of any works on site, a settlement facility for the removal of suspended solids from surface water run-off during construction works shall be provided in accordance with details previously submitted to and approved by the Local Planning Authority. The approved scheme shall be retained throughout the construction period. REASON: To prevent pollution of the water environment.
7 NOTE: Redcar and Cleveland Local Plan Policies GEN1, GEN2 and IND4e relevant to this decision.
8 (7) No development approved by this permission shall be commenced until:- (a) The application site has been subjected to a detailed scheme for the investigation and recording of contamination including soil contamination, ground/surface water contamination, landfill gas, leachates and stability as appropriate; (b) Detailed proposals for the removal, containment or otherwise rendering harmless any contamination (the 'Reclamation Method Statement') have been determined through risk assessment and approved in writing by the Local Planning Authority; (c) The works specified in the Reclamation Method Statement have been completed in accordance with the approved scheme; Any contamination not considered in the Reclamation Method Statement but identified during the reclamation works should be subject to further risk assessment and remediation proposals agreed with the Local Planning Authority. A report demonstrating that the works were carried out in accordance with the approved scheme (the 'Validation Report') should be submitted to the Local Planning Authority within 2 months of completion of the development. REASON: The site may be contaminated as a result of past or current uses and/or is within 250 metres of a site which has been landfilled and the Local Planning Authority wishes to ensure that the proposed development can be implemented and occupied with adequate regard to environmental and public protection.
9 REASON FOR DECISION: The site is within an area identified for industrial/warehousing purposes. The design and siting of the development takes account of the principles set out in the supplementary guidance in the Local Plan. The proposal therefore accords with the Council's adopted Local Plan.
Consultee Name Date Letter Sent Consultation Expiry Date
Housing & Health Services 19/05/2005 -
Northumbrian Water Ltd 19/05/2005 -
Technical Services (Regulatory) 19/05/2005 -
Address Date Sent Date Reconsulted Expiry Date
TOD POINT ROAD REDCAR TS105AU 23/05/2005 - 13/06/2005
4 WARRENBY COURT REDCAR TS105AT 23/05/2005 - 13/06/2005
1 WARRENBY COURT REDCAR TS105AT 23/05/2005 - 13/06/2005
3 WARRENBY COURT REDCAR TS105AT 23/05/2005 - 13/06/2005
2 WARRENBY COURT REDCAR TS105AT 23/05/2005 - 13/06/2005
5 WARRENBY COURT REDCAR TS105AT 23/05/2005 - 13/06/2005
6 WARRENBY COURT REDCAR TS105AT 23/05/2005 - 13/06/2005
Site or Press Description Display Date Expiry Date
B ARTICLE 15 27/05/2005 17/06/2005