R/2005/0195/FF

Planning Application Details - Official Consultation has expired.

Location
ASDA, LAND AT TEESPORT, GRANGETOWN
Proposal
ERECTION OF AN IMPORT FACILITY
Application Type
Full
Status
Approved
Parish(es)
Eston
Applicant
GAZELEY PROPERTIES LTD AND P D TEESPORT
Applicant's Address
C/O GAZELEY HOUSE 26 ROCKINGHAM DRIVE LINFORD WOOD MILTON KEYNES MK146PD
Agent
TURLEY ASSOCIATES
Agent's Address
43 PARK PLACE LEEDS LS1 2RY
Agent's work phone
Agent's email
Case Officer
Mrs D Mealing
Case Officer Telephone
Case Officer Email
Doreen.Mealing@redcar-cleveland.gov.uk
Consultation Start
04/03/2005
Weekly List Expiry Date
-
Date Received
24/02/2005
Date Valid
24/02/2005
Expiry
21/04/2005
Consultation Expiry
31/03/2005
associated_bldreg
-
Decision
APPROVED
Decision Date
21/06/2005
Decision Level
Delegated

Conditions table
# Condition Details
1 (1) The development shall not be begun later than the expiration of FIVE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 (2) Details of materials to be used on the external elevations of the development shall be submitted to and agreed in writing by the Local Planning Authority prior to the development being commenced. REASON: To ensure the use of satisfactory materials.
3 (3) Floor levels and flood sensitive equipment should be raised above 5m AOD. REASON: To limit the damage to development from flooding.
4 (4) Details of the Travel Plan shall be submitted to and agreed with the Local Planning Authority. REASON: To ensure a satisfactory form of development.
5 (5) No development approved by this permission shall be commenced until: a) a desk top study has been carried out which shall include the identification of previous site uses, potential contaminants that might reasonably be expected given those uses and other relevant information. And using this information a diagrammatical representation (Conceptual Model of the geology and hydrogeology) for the site of all potential contaminant sources, pathways and receptors has been produced. b) A site investigation has been designed for the site using the information obtained from the desk top study and any diagrammatical representations (Conceptual Model of the geology and hydrogeology). This should be submitted to, and approved in writing by the Local Planning Authority prior to that investigation being carried out on the site. The investigation must be comprehensive enough to enable: - a risk assessment to be undertaken relating to ground and surface waters associated on the off the site that may be affected, and - refinement of the Conceptual Model, and - the development of a Method Statement detailing the remediation requirements. c) The site investigation has been undertaken in accordance with details approved by the Local Planning Authority and a risk assessment has been undertaken. d) A Method Statement detailing the remediation requirements, including measures to minimise the impact on ground and surface waters, using the information obtained from the Site Investigation has been submitted to the Local Planning Authority. This should be approved in writing by the Local Planning Authority prior to that remediation being carried out on the site. REASON: To protect Controlled Waters and ensure that the remediated site is reclaimed to an appropriate standard.
6 (6) Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. REASON: To prevent pollution of the water environment.
7 (7) Prior to the commencement of any works on site, a settlement facility for the removal of suspended solids from surface water run-off during construction works shall be provided in accordance with details previously submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be retained throughout the construction period. REASON: To prevent pollution of the water environment.
8 (8) Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hardstandings shall be passed through an oil interceptor installed in accordance with a scheme previously submitted to and approved in writing by the Local Planning Authority. Roof water shall not pass through the interceptor. REASON: To prevent pollution of the water environment.
9 (9) Should the initial clearance and ground preparation of the development site be planned and implemented during the period March to July inclusive, the applicant shall provide a method statement detailing how breeding birds will be deterred from using the site. This Method Statement shall be submitted to the Local Planning Authority within one month of the granting of any permission and once approved shall be implemented in full. REASON: In the interests of the protection of breeding birds.
10 NOTE: Redcar and Cleveland Local Plan Policies GEN1, GEN2 and IND2 were relevant to this decision.
11 REASON FOR DECISION: The site is within an area identified for industrial/warehousing purposes. The design and siting of the development takes account of the principles set out in the supplementary guidance in the Local Plan. The proposal therefore accords with the Council's adopted Local Plan.

If you are unable to find the decision notice that relates to this planning application, please email planning_admin@redcar-cleveland.gov.uk and we will provide this document to you.

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download selected' button. To open the sub-tables, click the sub-heading for the group.

Select all Size Date uploaded
Decision
Decision Notice 181 kb
Consultee Name Date Letter Sent Consultation Expiry Date
Housing & Health Services 01/03/2005 -
Natural England 01/03/2005 -
Northumbrian Water Ltd 01/03/2005 -
Technical Services (Regulatory) 01/03/2005 -
Address Date Sent Date Reconsulted Expiry Date
CAT (UK) KINKERDALE ROAD TEESPORT GRANGETOWN TS6 6 09/03/2005 - 30/03/2005
CAT (UK) KINKERDALE ROAD TEESPORT GRANGETOWN TS6 6 10/03/2005 - 31/03/2005
ALBERMARLE CORPORATION KINKERDALE ROAD TEESPORT GRANGETOWN TS6 6 09/03/2005 - 30/03/2005
ALBERMARLE CORPORATION KINKERDALE ROAD TEESPORT GRANGETOWN TS6 6 10/03/2005 - 31/03/2005
Site or Press Description Display Date Expiry Date
B DEPARTURE 04/03/2005 25/03/2005