Location
ETOL MAIN STORES, PO BOX 1985, WILTON INTERNATIONAL, GRANGETOWN, TS908WS
Proposal
DEVELOPMENT OF SITE AS A WASTE TRANSFER STATION FOR NON HAZARDOUS BUILDING CONSTRUCTION SITE WASTE
Application Type
Full
Status
Approved
Parish(es)
Applicant
MICHAEL BLENCH HAULAGE LIMITED
Applicant's Address
LILAC COTTAGE
HORNBY
NORTHALLERTON
DL6 2JH
Agent
MICHAEL BLENCH HAULAGE LIMITED
Agent's Address
LILAC COTTAGE
HORNBY
NORTHALLERTON
DL6 2JH
Agent's work phone
Agent's email
Case Officer
Mr G Dyball
Case Officer Telephone
Case Officer Email
Grahame_Dyball@redcar-cleveland.gov.uk
Consultation Start
25/11/2002
Weekly List Expiry Date
-
Date Received
08/11/2002
Date Valid
08/11/2002
Expiry
03/01/2003
Consultation Expiry
10/01/2003
associated_bldreg
-
Decision
APPROVED
Decision Date
13/01/2003
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | (1) The development shall not be begun later than the expiration of FIVE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2 | (2) Prior to being discharged into any watercourse, surface water sewer or soakaway all surface water drainage shall be passed through an oil interceptor designed and constructed to have a capacity compatible with the site being drained. Roof water shall not passs through the interceptor. REASON: To protect the groundwater quality in the area. |
| 3 | (3) Details of the final surfacing and containment arrangements for all areas used for the storage, handling, loading and unloading of fuels, oils, chemicals or effluents shall be submitted to, and approved in writing by the Local Planning Authority. Thereafter the approved scheme shall be fully implemented and retained throughout the life of the development. REASON: To protect the groundwater quality of the area. |
| 4 | (4) Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of the interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow outlets should be detailed to discharge dwonwards into the bund. REASON: To prevent pollution of the water environment. |
| 5 | NOTE: Redcar and Cleveland Local Plan Policies GEN1 & GEN2 were relevant to this decision. |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Housing & Health Services Division | 14/11/2002 | - |
| Northumbrian Water Ltd | 14/11/2002 | - |
| Planning and Policy Co-Ordinator | 26/11/2002 | - |
| Technical Services (Regulatory) | 14/11/2002 | - |
| Address | Date Sent | Date Reconsulted | Expiry Date |
|---|---|---|---|
| WILTON | 25/11/2002 | - | 16/12/2002 |
| Site or Press | Description | Display Date | Expiry Date |
|---|---|---|---|
| B | ARTICLE 15 | 20/12/2002 | 10/01/2003 |