R/2002/0821/FF

Planning Application Details - Official Consultation has expired.

Location
PLOT NO. 6 KIRKLEATHAM BUSINESS PARK, KIRKLEATHAM LANE, REDCAR
Proposal
ERECTION OF A TWO STOREY POLICE STATION
Application Type
Full
Status
Approved
Parish(es)
Applicant
HBG PROJECTS LTD
Applicant's Address
WOODSIDE HOUSE 14 WOODSIDE TERRACE GLASGOW G3 7XH
Agent
THE DEWJOC PARTNERSHIP
Agent's Address
CHESTERFIELD MILL LANE NORTON STOCKTON ON TEES TS201LG
Agent's work phone
Agent's email
Case Officer
Miss J Horne
Case Officer Telephone
Case Officer Email
Janet.Horne@redcar-cleveland.gov.uk
Consultation Start
09/10/2002
Weekly List Expiry Date
-
Date Received
27/09/2002
Date Valid
27/09/2002
Expiry
22/11/2002
Consultation Expiry
15/11/2002
associated_bldreg
-
Decision
APPROVED
Decision Date
13/01/2003
Decision Level
Delegated

Conditions table
# Condition Details
1 (1) The development shall not be begun later than the expiration of FIVE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990.
2 (2) This permission relates only to the amended plan(s) received by the Local Planning Authority on 31 October and 16 December 2002. REASON: For the avoidance of doubt.
3 (3) Details of materials to be used on the external elevations of the development shall be submitted to and agreed in writing by the Local Planning Authority prior to the development being commenced. REASON: To ensure the use of satisfactory materials.
4 (4) No development shall take place until there has been submitted to, and agreed in writing by the Local Planning Authority, a scheme of landscaping which shall include indications of all existing trees and hedgerows on the land (if any), and details of any to be retained, together with measures for their protection in the course of the development. REASON: To reserve the rights of the Local Planning Authority with regard to these matters
5 (5) All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever is sooner, and any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. REASON: To ensure the satisfactory implementation of the approved scheme in the interests of the visual amenities of the locality.
6 (6) Prior to the occupation of the building hereby approved, boundary fencing shall be erected in accordance with details that have been approved in writing. The approved scheme shall be maintained for the lifetime of the development. REASON: In the interests of visual amenity.
7 (7) Full details of the proposed radio mast, ancillary buildings and equipment cabinets shall be submitted for approval in writing to the Local Planning Authority. The approved details shall be implemented in their entirety. REASON: Full details were not submitted with the application.
8 (8) Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hardstandings shall be passed through an oil interceptor installed in accordance with a scheme previously submitted to and approved in writing by the Local Planning Authority. Roof water shall not pass through the interceptor. REASON: To prevent pollution of the water environment.
9 (9) There shall be no discharge of foul or contaminated drainage from the site into either groundwater or any surface waters, whether direct or via soakaways. REASON: To prevent pollution of the water environment.
10 (10) Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, guages and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. REASON: To prevent pollution of the water environment.
11 (11) No development approved by this permission shall be commenced until a scheme for the provision and implementation of a surface water run-off limitation has been submitted to and approved in writing by of the Local Planning Authority. The scheme shall be implemented in accordance with the approved programme and details. REASON: To prevent the increased risk of flooding.
12 (12) The application site is on/close to land identified by the council as having a history of potentially harmful contamination. The applicant shall, prior to the commencement of any works involving the disturbance of the site, submit for the approval of the Planning Authority i) details of a suitable site investigation and risk assessment sufficient to identify the nature and degree of any contaminants in, on or under the site and the extent to which they may effect the suitability of the site for its intended use. ii) dependent on the findings of i) above, details of a suitable remediation scheme. The agreed scheme shall be implemented to the satisfaction of the Local Planning Authority prior to the development commencing.
13 (13) Steps should be taken to ensure nearby trees are not damaged, lopped or removed as a result of this development. REASON: To ensure the continued health and presence of nearby trees.
14 INFORMATIVE NOTE: The works shall be carried out in accordance with the Authority's standard specification for road, sewer and street lighting works serving private development in order to secure adoption and the details submitted to the Director of Development at least one month before the commencement of works.
15 NOTE: Redcar and Cleveland Local Plan Policies GEN1, GEN2, IND5 & SH12a were relevant to this decision.
Consultee Name Date Letter Sent Consultation Expiry Date
Aboricultural Officer 03/10/2002 -
Northumbrian Water Ltd 03/10/2002 -
Technical Services (Regulatory) 03/10/2002 -
Address Date Sent Date Reconsulted Expiry Date
522 WEST DYKE ROAD REDCAR TS104QP 09/10/2002 - 30/10/2002
524 WEST DYKE ROAD REDCAR TS104QP 09/10/2002 - 30/10/2002
533 WEST DYKE ROAD REDCAR TS104QP 09/10/2002 - 30/10/2002
535 WEST DYKE ROAD REDCAR TS104QP 09/10/2002 - 30/10/2002
537 WEST DYKE ROAD REDCAR TS104QP 09/10/2002 - 30/10/2002
ONE NORTH EAST 20 MANOR ROAD BELASIS HALL TECHNOLOGY PARK BILLINGHAM STOCKTON ON TEES TS23 4HN 09/10/2002 - 30/10/2002
Site or Press Description Display Date Expiry Date
B ARTICLE 15 25/10/2002 15/11/2002