Location
KIRKLEATHAM BUSINESS PARK, INNOVATION CENTRE, VIENNA COURT, REDCAR
Proposal
EXTENSION TO EXISTING INNOVATION CENTRE TO PROVIDE OFFICE AND WORKSHOP
Application Type
Full
Status
Approved
Parish(es)
Applicant
UK STEEL ENTERPRISE LIMITED
Applicant's Address
THE INNOVATION CENTRE
217 PORTOBELLO
SHEFFIELD
S1 4DP
Agent
PH & S ARCHITECT
Agent's Address
THE OLD STATION
STOKESLEY
NORTH YORKSHIRE
TS9 7AB
Agent's work phone
Agent's email
Case Officer
Mrs D Mealing
Case Officer Telephone
Case Officer Email
Doreen.Mealing@redcar-cleveland.gov.uk
Consultation Start
05/12/2001
Weekly List Expiry Date
-
Date Received
16/11/2001
Date Valid
16/11/2001
Expiry
11/01/2002
Consultation Expiry
11/01/2002
associated_bldreg
-
Decision
APPROVED
Decision Date
16/01/2002
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | (1) The development shall not be begun later than the expiration of FIVE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2 | (2) Details of materials to be used on the external elevations of the development shall be submitted to and agreed in writing by the Local Planning Authority prior to the development being commenced. REASON: To ensure the use of satisfactory materials. |
| 3 | (3) No development shall take place until there has been submitted to, and agreed in writing by the Local Planning Authority, a scheme of landscaping which shall include indications of all existing trees and hedgerows on the land (if any), and details of any to be retained, together with measures for their protection in the course of the development. REASON: To reserve the rights of the Local Planning Authority with regard to these matters |
| 4 | (4) All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever is sooner, and any trees or plants which within a period of five years from the completion of the development die, are removed, or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. REASON: To ensure the satisfactory implementation of the approved scheme in the interests of the visual amenities of the locality. |
| 5 | (5) Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow outlets should be detailed to discharged downwards into the bund. REASON: To prevent pollution of the water environment. |
| 6 | (6) Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hardstandings shall be passed through an oil interceptor installed in accordance with a scheme previously submitted to and approved in writing by the Local Planning Authority. Roof water shall not pass through the interceptor. REASON: To prevent pollution of the water environment. |
| 7 | (7) There shall be no discharge of foul or contaminated drainage from the site into either groundwater or any surface waters, whether direct or via soakaways. REASON: To prevent pollution of the water environment. |
| 8 | (8) New discharges of foul and surface water must be on separate systems. REASON: To ensure a satisfactory form of development. |
| 9 | (9) Surface water run-off from this development must be prevented from entering the public foul or combined sewer. Connection to a surface water sewer must be made or an alternative means of disposal investigated. REASON: To ensure a satisfactory form of development. |
| 10 | NOTE - Redcar and Cleveland Local Plan Policies GEN1, GEN2 & IND5 were relevant to this decision. |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Northumbrian Water Ltd | 27/11/2001 | - |
| Technical Services (Regulatory) | 27/11/2001 | - |
| Address | Date Sent | Date Reconsulted | Expiry Date |
|---|---|---|---|
| MANOR FARM KIRKLEATHAM REDCAR TS105NL | 05/12/2001 | - | 26/12/2001 |
| Site or Press | Description | Display Date | Expiry Date |
|---|---|---|---|