Location
LAND AT TEES OFFSHORE BASE, DOCKSIDE ROAD, SOUTH BANK, TS6 6UZ
Proposal
ERCTION OF A LIQUID CO2 STORAGE DEPOT
Application Type
Full
Status
Approved
Parish(es)
Applicant
NORSK HYDRO A&A GASES&CHEMICALS
Applicant's Address
BYGDOY ALLE 2
OSLO
N - 0240
Agent
K HOME ENGINEERING LTD
Agent's Address
INGRAM HOUSE
ALLENSWAY
STOCKTON ON TEES
TS179HA
Agent's work phone
Agent's email
Case Officer
Mr G Dyball
Case Officer Telephone
Case Officer Email
Grahame_Dyball@redcar-cleveland.gov.uk
Consultation Start
25/08/2000
Weekly List Expiry Date
-
Date Received
17/08/2000
Date Valid
17/08/2000
Expiry
12/10/2000
Consultation Expiry
06/10/2000
associated_bldreg
-
Decision
APPROVED
Decision Date
26/09/2000
Decision Level
Delegated
| # | Condition Details |
|---|---|
| 1 | (1) The development shall not be begun later than the expiration of FIVE YEARS from the date of this permission. REASON: Required to be imposed pursuant to Section 91 of the Town and Country Planning Act 1990. |
| 2 | (2) Any facilities for the storage of oils, fuels or chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The volume of the bunded compound should be atleast equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound should be at least equivalent to the capacity of the largest tank, or the combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight glasses must be located within the bund. The drainage system of the bund shall be sealed with no discharge to any watercourse, land or underground strata. Associated pipework should be located above ground and protected from accidental damage. All filling points and tank overflow pipe outlets should be detailed to discharge downwards into the bund. REASON: To prevent pollution of the water environment. |
| 3 | (3) There shall be no discharge of foul or contaminated drainage from the site into either groundwater or any surface waters, whether direct or via soakways. REASON: To prevent pollution of the water environment. |
| 4 | (4) No development approved by this permission shall be commenced until details of the use, handling or storage arrangements of any hazardous substance included in the Schedule to the Planning (Hazardous Substances) Regulations 1992 has been submitted to and approved by the Local Planning Authority. Thereafter the use, handling and storage arrangements shall take place at all times in accordance with the approved details. REASON: To prevent pollution of the water environment. |
| 5 | NOTE: The following policies/proposals in the development plan were relevant to this decision: Redcar & Cleveland Local Plan IND2 |
| Consultee Name | Date Letter Sent | Consultation Expiry Date |
|---|---|---|
| Housing & Health Services Division | 23/08/2000 | - |
| Technical Services (Regulatory) | 23/08/2000 | - |
| Address | Date Sent | Date Reconsulted | Expiry Date |
|---|---|---|---|
| DOCKSIDE ROAD SOUTH BANK MIDDLESBROUGH | 25/08/2000 | - | 15/09/2000 |
| Site or Press | Description | Display Date | Expiry Date |
|---|---|---|---|
| B | ARTICLE 15 | 15/09/2000 | 06/10/2000 |